RERA Property Intelligence Report · Preview
MITRAA PROPERTIES REP BY Mr SURESH Mr K PERUMAL Mr A ROCHE AROCKIARAJ · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/190913/002865
Report coverage
Full report — registry facts + unit-level plan intelligence
What this report covers
Report map
The shortest version of this report — specific moves for your situation. Not financial advice; each traces to a fact below.
Conditional guidance based on the facts above — not a buy/don't-buy recommendation, and not financial advice. Weigh each point against what matters to you.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered land area | 2,019 sqm | The land area attached to this K-RERA registration. |
| Parking disclosed | 0 open, 44 garage | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 15-11-2018 |
From the sanctioned site plan, we map every block against the amenities worth being near and the utilities worth avoiding, using each item's position on the plan:
Positions are read from the sanctioned plan, not surveyed; distances are relative within the plan, not metres. Treat this as where to look first and what to check on a site visit — not a final verdict.
Two flats in the same project can differ 15–20% in liveability and resale for the same price. Here's how to pick the right one — tower, side, floor, facing, position and size — read off the sanctioned plan and the filed inventory. Directional, not surveyed: verify on a site visit.
2 · Which floor
Target the upper-middle floors: high enough to clear street dust, boundary-wall sightlines, mosquitoes and ground-floor privacy/security worries, but below the very top floor (terrace heat and leak risk). Avoid the ground and first floor (dust, noise, privacy, waterlogging in a bad monsoon) unless you specifically want a private-garden unit and accept the trade-offs. Ask which floors are refuge/service floors and skip the flats directly above or below them.
3 · Which facing
Target North, Northeast and East-facing homes — even, glare-free light all day and no direct heat load — the safe pick. Steer clear of South, West and Southwest-facing living rooms and bedrooms — west/south-west take the full 2–7pm summer sun (heat you pay to fight with the AC all year). A west kitchen or utility is fine; a west master isn't. Confirm the exact facing with a compass on site — brochure 'park-facing' isn't a compass reading.
4 · Which flat on the floor
Prefer a corner unit — two or three external walls mean cross-ventilation, light on more than one side, more windows and a resale premium. Avoid the flat that shares a wall with the lift shaft or staircase (vibration, footfall, less privacy) and the one beside the garbage chute or electrical/meter room. Check the units-per-floor-per-lift ratio — more than ~4 flats sharing one lift core means waits and crowding.
5 · Which size, for value
The 1BHK / studio units are a thinner resale market (fewer buyers, longer to sell) — only if you'll actually use the space, not as the investment pick. Plan-profiled units span 375–402 sq ft of enclosed-room area (room-dimension sums off the sanctioned plan — below the filed carpet, which includes internal walls); check the loading (carpet ÷ super-built-up) against your agreement.
If it were my money
I'd target a corner unit on an upper-middle floor, with a north/east-facing living side. I'd pass on west/south-west-facing living rooms and bedrooms and anything on the ground/first floor or the top floor.
Plan-derived guidance, not a survey or a vastu consultation — confirm facing, tower distances and floor specifics on site.
Within each bedroom count, here's the size spread across the units we could confidently profile. Cards marked ★ below are the standouts in their configuration — either the largest (a resale/rental edge) or notably smaller than peers (worth a question to the builder).
| Configuration | Units profiled | Range | Average |
|---|---|---|---|
| plan-read layout | 3 | 375–402 sqft | 393 sqft |
Room dimensions read directly off the developer's sanctioned building plan filed with K-RERA (vision-extracted, in the units shown on the plan — often metres or millimetres — not an independent survey). Total area below is the sum of labeled enclosed-room dimensions, excluding obvious exterior/open labels such as balconies, terraces, and landscape courts. It is an approximation, not the builder's official carpet/built-up area. Unit labels describe position (block/wing/floor) as drawn on the sheet, not a flat number — the plan doesn't print one. ⚠ cards flag units near utility infrastructure per the site plan (see "Site & infrastructure" above); we don't have a reliable per-unit balcony-facing read, so this report makes no vastu/facing claims for individual units.
Range across profiled units: 375–402 sqft (avg 393 sqft)
The 1 units below are worth a second look — the largest in their configuration, notably smaller than peers, or carrying a site-plan caution. Use the browser beneath them to filter every profiled unit by block, configuration, floor, or flag.
top second-from-left unit (Stilt Floor)
402 sqft (approx., enclosed-room sum)
★ Largest layout profiled here — a resale/rental edge if everything else is equal.
From sanctioned plan, page 1
How much of the plot the buildings actually cover, and how close the project ran to its permitted FAR/FSI — context that affects how crowded the site feels day to day, separate from any single unit's own size.
The buildings cover 54% of the site against 55% permitted — a fairly built-out site, so check how much usable open ground actually remains between blocks; the project fronts a 9.20 m road — on the narrower side; visit at peak hour to gauge congestion before committing.
| Plot area | 2019.25 sqmt |
| Net site area (after road/encroachment deductions) | 2019.25 sqmt |
| FAR/FSI allowed | 1.75 |
| Ground coverage allowed | 55% |
| Ground coverage achieved | 53.79% |
| Approach road width | 9.20 m |
Read off the site plan's own "Development Plan Area Statement" panel, cross-checked across repeated independent reads — only fields where those reads agreed are shown here.
K-RERA did not expose a land-survey/title table for this project.
Some K-RERA detail-page templates include survey numbers, land type, conversion, deed/JDA, khatha, mortgage, and owner-share rows; this filing did not expose that structured table in the data we could parse. Treat this as a due-diligence gap, not as a clean title signal: ask the builder/lawyer for the title report, EC, conversion order, khatha, JDA/deed, and the exact survey numbers used for your UDS.
For the most buyer-critical non-plan PDFs, the report now downloads the actual filing and extracts conservative text cues. These cues are not legal opinions; they tell your lawyer what the RERA upload appears to contain and which documents need closer review.
| Document | Pages | Extracted cues |
|---|---|---|
| Commencement / building licence COMMENCEMENT CERTIFICATE.pdf | 1 | Issuing authority: Bruhat Bengaluru Mahanagara Palike (BBMP), Urban Planning division, Mahadevapura zone; Document type: 'Prarambhika Pramana Patra' (Preliminary Commencement Certificate); Reference number visible: Ad.Com/MDP/0262/18-19 dated 15/11/2018; Document date: 01/03/2019 |
| Sale deed proforma PERFORMA OF SALE DEED OF MY GATE.pdf | 8 | date(s) visible: 87/99/87, 23/11/2015, 02/06/2018; mentions lender/charge/mortgage-type language; contains sale-deed/conveyance draft language |
| Agreement for sale draft SALE DEED&RTC.pdf | 77 | Document type: Absolute Sale Deed; Execution date visible: 2nd June 2018, at Bengaluru; Document number visible: 3272 / 2018-19; Document sheet issued by Bangalore Advocates Co-operative Society Ltd (BACSL) |
| Allotment letter draft PERFORMA OF ALLOTMENT LETTER FOR MY GATE.pdf | 1 | date(s) visible: 87/99/87, 23/11/2015 |
| Encumbrance certificate 8 ENCUMBRANCE CERTIFICATE.pdf | 11 | Visible date: 07/Jan/2006; Survey number referenced (Sy No. 99, Old No. 112, changed to 113) in property schedule; Land conversion / CLU language: 'Converted residential Purpose' explicitly stated; Village and Hobli identified: Horamavu Agara Village, K R Puram Hobli, BETQ |
| JDA / development agreement PARTNERSHIP DEED.pdf | 11 | PDF appears scanned or text extraction was limited |
| Land conversion / CLU CONVERSION CERTIFICATE (1).pdf | 6 | PDF appears scanned or text extraction was limited |
| Form B declaration DECLARATION FORM (B).pdf | 3 | PDF appears scanned or text extraction was limited |
No litigation declared on this project's K-RERA filing.
All 18 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 20 Jul 2021, extended (Covid Extension) to 20 Apr 2022 — both dates have passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | RAMESH S | - | 2005 | next to bbmp office, k r puram |
| Structural engineer | Y BHASKAR | - | - | - |
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
The estimated cost above is the developer's declared construction cost only (K-RERA's own label: "Estimated Cost of Construction as certified by Engineer") — it excludes land cost, so it isn't comparable to the buyer-collection figures below or to a sale price.
RERA 70% project account is on file: ICICI Bank KAMANHALLI (IFSC ICIC0000298, a/c …4864). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
If a builder or broker has shown you a specific unit: the sanctioned plan filed with K-RERA usually doesn't print flat numbers directly — it identifies units by block, wing, and floor. Find the card in the unit-level section matching your unit's location and bedroom count, then compare its room sizes and total area against other units of the same configuration in this project. If yours is noticeably smaller for the same number of bedrooms, that's worth asking the builder about directly.
Before signing anything: check the litigation & compliance section above — any declared dispute on the project should factor into your decision.
Want to verify something yourself? Every document this report draws from is listed in the catalog just below, with a direct link to K-RERA's own copy.
How confident is each fact? Every section is tagged by source:
Every document row on file with K-RERA for this project. Plan-like filings are processed for report intelligence when usable; buyer-critical support PDFs are selectively downloaded for read-through; placeholder uploads are shown as not usable; other compliance documents link directly to K-RERA's own copy.
| Document | Filename | Status |
|---|---|---|
| Promoter Type | FIRM REGISTRATION CERTIFICATE.pdf | View on K-RERA → |
| Address | PHOTO OF MANAGING PARTNER S SURESH.pdf | View on K-RERA → |
| Type | PHOTO OF MANAGING PARTNERS.pdf | View on K-RERA → |
| Type | PHOTO OF MANAGING PARTNERS.pdf | View on K-RERA → |
| Project End Date provided under Section 6 | PAN CARD.pdf | View on K-RERA → |
| Commencement Certificate | COMMENCEMENT CERTIFICATE.pdf | Downloaded for read-through → |
| Approved Building/Plotting Plan | APPROVED BUILDING OR PLOTTING PLAN & BBM LICENSE & COMMENCEMENT CERTIFICATE.pdf | Processed for plan intelligence |
| Approved Layout Plan | APPROVED BUILDING OR PLOTTING PLAN & BBM LICENSE & COMMENCEMENT CERTIFICATE.pdf | Processed for plan intelligence |
| Proforma For Sale Deed | PERFORMA OF SALE DEED OF MY GATE.pdf | Downloaded for read-through → |
| Proforma of Agreement for Sale | SALE DEED&RTC.pdf | Downloaded for read-through → |
| Approved Section Of Building/Infrastructure Plan of Plotting | INFRASTRUCTURE PLAN OF PLOTTING.pdf | Processed for plan intelligence |
| Area Development Plan Of Project Area | AREA DEVELOPMENT PLAN OF PROJECT AREA.pdf | Processed for plan intelligence |
| Performa of Allotment Letter | PERFORMA OF ALLOTMENT LETTER FOR MY GATE.pdf | Downloaded for read-through → |
| Brochure of Current Project | MITRAA MYGATE.pdf | View on K-RERA → |
| Project Specification | MITRAA PROPERTIES SPECIFICATION.pdf | View on K-RERA → |
| Encumbrance Certificate | 8 ENCUMBRANCE CERTIFICATE.pdf | Downloaded for read-through → |
| Section 3(1) Notarized Affidavit | KHATHA.pdf | View on K-RERA → |
| Joint Development Agreement | PARTNERSHIP DEED.pdf | Downloaded for read-through → |
| Conversion Certificate under Sec 95 of the KLR Act 1961 | CONVERSION CERTIFICATE (1).pdf | Downloaded for read-through → |
| KSPCB | KSPCB MY-GATE NOC.pdf | View on K-RERA → |
| Existing Layout Plan | APPROVED BUILDING OR PLOTTING PLAN & BBM LICENSE & COMMENCEMENT CERTIFICATE.pdf | Processed for plan intelligence |
| Existing Section Plan and Specification | AREA DEVELOPMENT PLAN OF PROJECT AREA.pdf | Processed for plan intelligence |
| Change of Land Use | CONVERSION CERTIFICATE (1).pdf | Downloaded for read-through → |
| Declaration (Form B) | DECLARATION FORM (B).pdf | Downloaded for read-through → |
Request the report on MY GATE
We analyse MY GATE in full and send you the RERA Property Intelligence Report — we analyse in 1 working day.
Should you buy in MY GATE?
This page is the free K-RERA filing summary. The full RERA Property Intelligence Report gives you buyer-complaint history, regulatory flags, builder track record, the official unit register, land title, NOCs, and (where the sanctioned plans support it) room-by-room unit data and an annotated site plan. See a real one first:
Sample: Sobha Silicon Oasis → · browse all sample reports →
₹4,999 · delivered within 1 working day
Not useful to your decision? Full refund — no questions asked.
Scan with any UPI app to pay · 9028056255@idfcfirst
Paying from outside India? Pay $99 via PayPal or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.