RERA Property Intelligence Report · Preview

MY GATE

MITRAA PROPERTIES REP BY Mr SURESH Mr K PERUMAL Mr A ROCHE AROCKIARAJ · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/190913/002865

Report coverage

Full report — registry facts + unit-level plan intelligence

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings
  • Site & infrastructure intelligence from the filed sanctioned plan
  • Unit-level plan intelligence — dimensioned layouts, facing, per-block detail
Not yet
Completion certificate
None declared
Legal status
None found
Utility proximity check
Other RERA projects by builder

Decision summary

Overall risk
High
Legal riskLow
Delivery riskHigh
Livability riskLow

Legal = litigation/declared disputes. Delivery = OC status, the project's own registration validity, and builder delay history vs the local benchmark. Livability = whether filed-plan utilities are absent, mapped near a block, or visible but not mappable from the current extraction. Each is a summary of a fact shown elsewhere in this report, not an independent score — verify against the relevant section before relying on it.

No litigation declared on this project's K-RERA filing.RERA filing
On K-RERA's official defaulter list. The regulator itself has flagged this project as a defaulter — a harder signal than any delay heuristic. See "Litigation & compliance" below and ask the builder to explain its standing.RERA filing
Registration validity has lapsed (~51 months past the last permitted end date). The declared completion on the registration was 20 Jul 2021; covid Extension moved it to 20 Apr 2022, which has also passed. Until an extension is approved, the project is past its permitted timeline without a completion certificate — RERA restricts a promoter from advertising or selling in a project whose registration has expired. Confirm the extension status with K-RERA before paying anything.RERA filing
No completion certificate yet — project hasn't been declared complete.RERA filing
The only construction-progress figure on file is an undated 10% developed / 90% pending, and no quarterly progress reports have been filed to update it. Treat that as a stale snapshot, not the current stage — K-RERA puts no date on it, so a project could be finished and occupied while an un-updated filing still shows an old figure (or genuinely stalled). Either way the RERA record is not a reliable read of current status here: ask for recent dated construction photos and verify the actual stage on a site visit before you rely on any completion timeline.RERA filing
1 standout unit worth a second look — e.g. top second-from-left unit (Stilt Floor) at 402 sqft. See "Standout units" below.Vision-read from plan

What I'd do as a buyer

The shortest version of this report — specific moves for your situation. Not financial advice; each traces to a fact below.

If you need a ready-to-move home: treat possession timing as uncertain — this project has no completion certificate on file yet.
If the builder can't map your flat number to a spot on the sanctioned plan: pause — you can't verify what you're actually buying until they do.

Who this suits & what to verify

Conditional guidance based on the facts above — not a buy/don't-buy recommendation, and not financial advice. Weigh each point against what matters to you.

No completion certificate yet — best suited to buyers comfortable carrying possession-timeline uncertainty. If you need an OC-in-hand, ready-to-move home, treat this as watch-and-verify, not a sure thing.
Whatever unit a broker shows you, have the builder map that flat number to its exact block, wing, and floor on the sanctioned plan before booking — the report identifies units by position, not by flat number.

Questions to ask the builder

  • Can you map my specific flat number to its block, wing, and floor on the sanctioned plan?
  • K-RERA did not expose a survey/title table for this project - can you share the title report, latest EC, conversion order, khatha, JDA/deed, and exact survey numbers used for my UDS?
  • Your K-RERA registration validity has lapsed with no completion certificate on file — has an extension been applied for, and what is its current status with the regulator?
  • What's the realistic timeline to completion certificate, given the current construction stage?
  • Why are no quarterly financial disclosures (collections, escrow withdrawals) available despite construction being incomplete?
  • Can you share recent dated construction photos for my specific block/wing, since no project-photo uploads are visible in the K-RERA catalog?
Registered units
₹19.5 Cr
Est. construction cost
3
Units profiled
24
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered land area2,019 sqmThe land area attached to this K-RERA registration.
Parking disclosed0 open, 44 garageConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date15-11-2018

Which Unit to Buy Here

From the sanctioned site plan, we map every block against the amenities worth being near and the utilities worth avoiding, using each item's position on the plan:

✓ Car Parking
MixedProposed Building is set away from both the key amenities and the utilities. This is a low-confidence read of the filed drawing — treat it as a flag to check the utility's position on the sanctioned plan, not a settled fact.

Positions are read from the sanctioned plan, not surveyed; distances are relative within the plan, not metres. Treat this as where to look first and what to check on a site visit — not a final verdict.

Two flats in the same project can differ 15–20% in liveability and resale for the same price. Here's how to pick the right one — tower, side, floor, facing, position and size — read off the sanctioned plan and the filed inventory. Directional, not surveyed: verify on a site visit.

2 · Which floor

Target the upper-middle floors: high enough to clear street dust, boundary-wall sightlines, mosquitoes and ground-floor privacy/security worries, but below the very top floor (terrace heat and leak risk). Avoid the ground and first floor (dust, noise, privacy, waterlogging in a bad monsoon) unless you specifically want a private-garden unit and accept the trade-offs. Ask which floors are refuge/service floors and skip the flats directly above or below them.

3 · Which facing

Target North, Northeast and East-facing homes — even, glare-free light all day and no direct heat load — the safe pick. Steer clear of South, West and Southwest-facing living rooms and bedrooms — west/south-west take the full 2–7pm summer sun (heat you pay to fight with the AC all year). A west kitchen or utility is fine; a west master isn't. Confirm the exact facing with a compass on site — brochure 'park-facing' isn't a compass reading.

4 · Which flat on the floor

Prefer a corner unit — two or three external walls mean cross-ventilation, light on more than one side, more windows and a resale premium. Avoid the flat that shares a wall with the lift shaft or staircase (vibration, footfall, less privacy) and the one beside the garbage chute or electrical/meter room. Check the units-per-floor-per-lift ratio — more than ~4 flats sharing one lift core means waits and crowding.

5 · Which size, for value

The 1BHK / studio units are a thinner resale market (fewer buyers, longer to sell) — only if you'll actually use the space, not as the investment pick. Plan-profiled units span 375–402 sq ft of enclosed-room area (room-dimension sums off the sanctioned plan — below the filed carpet, which includes internal walls); check the loading (carpet ÷ super-built-up) against your agreement.

If it were my money

I'd target a corner unit on an upper-middle floor, with a north/east-facing living side. I'd pass on west/south-west-facing living rooms and bedrooms and anything on the ground/first floor or the top floor.

Plan-derived guidance, not a survey or a vastu consultation — confirm facing, tower distances and floor specifics on site.

How units compare, by configuration

Vision-read from plan

Within each bedroom count, here's the size spread across the units we could confidently profile. Cards marked ★ below are the standouts in their configuration — either the largest (a resale/rental edge) or notably smaller than peers (worth a question to the builder).

ConfigurationUnits profiledRangeAverage
plan-read layout3375–402 sqft393 sqft

Standout units

Vision-read from plan

Room dimensions read directly off the developer's sanctioned building plan filed with K-RERA (vision-extracted, in the units shown on the plan — often metres or millimetres — not an independent survey). Total area below is the sum of labeled enclosed-room dimensions, excluding obvious exterior/open labels such as balconies, terraces, and landscape courts. It is an approximation, not the builder's official carpet/built-up area. Unit labels describe position (block/wing/floor) as drawn on the sheet, not a flat number — the plan doesn't print one. ⚠ cards flag units near utility infrastructure per the site plan (see "Site & infrastructure" above); we don't have a reliable per-unit balcony-facing read, so this report makes no vastu/facing claims for individual units.

Range across profiled units: 375–402 sqft (avg 393 sqft)

The 1 units below are worth a second look — the largest in their configuration, notably smaller than peers, or carrying a site-plan caution. Use the browser beneath them to filter every profiled unit by block, configuration, floor, or flag.

top second-from-left unit (Stilt Floor)

402 sqft (approx., enclosed-room sum)

★ Largest layout profiled here — a resale/rental edge if everything else is equal.

M BEDROOM3.35x3.84 m
BEDROOM3.05x2.84 m
TOILET2.44x1.52 m
STORE2.44x1.52 m
KITCHEN3.05x2.74 m

From sanctioned plan, page 1

Density, Parking & Open Space

Coverage & Open Space

Vision-read from plan

How much of the plot the buildings actually cover, and how close the project ran to its permitted FAR/FSI — context that affects how crowded the site feels day to day, separate from any single unit's own size.

The buildings cover 54% of the site against 55% permitted — a fairly built-out site, so check how much usable open ground actually remains between blocks; the project fronts a 9.20 m road — on the narrower side; visit at peak hour to gauge congestion before committing.

Plot area2019.25 sqmt
Net site area (after road/encroachment deductions)2019.25 sqmt
FAR/FSI allowed1.75
Ground coverage allowed55%
Ground coverage achieved53.79%
Approach road width9.20 m

Read off the site plan's own "Development Plan Area Statement" panel, cross-checked across repeated independent reads — only fields where those reads agreed are shown here.

Land & Title

Land title & ownership

RERA filing

K-RERA did not expose a land-survey/title table for this project.

Some K-RERA detail-page templates include survey numbers, land type, conversion, deed/JDA, khatha, mortgage, and owner-share rows; this filing did not expose that structured table in the data we could parse. Treat this as a due-diligence gap, not as a clean title signal: ask the builder/lawyer for the title report, EC, conversion order, khatha, JDA/deed, and the exact survey numbers used for your UDS.

Title & buyer-document read-through

RERA filing

For the most buyer-critical non-plan PDFs, the report now downloads the actual filing and extracts conservative text cues. These cues are not legal opinions; they tell your lawyer what the RERA upload appears to contain and which documents need closer review.

DocumentPagesExtracted cues
Commencement / building licence
COMMENCEMENT CERTIFICATE.pdf
1Issuing authority: Bruhat Bengaluru Mahanagara Palike (BBMP), Urban Planning division, Mahadevapura zone; Document type: 'Prarambhika Pramana Patra' (Preliminary Commencement Certificate); Reference number visible: Ad.Com/MDP/0262/18-19 dated 15/11/2018; Document date: 01/03/2019
Sale deed proforma
PERFORMA OF SALE DEED OF MY GATE.pdf
8date(s) visible: 87/99/87, 23/11/2015, 02/06/2018; mentions lender/charge/mortgage-type language; contains sale-deed/conveyance draft language
Agreement for sale draft
SALE DEED&RTC.pdf
77Document type: Absolute Sale Deed; Execution date visible: 2nd June 2018, at Bengaluru; Document number visible: 3272 / 2018-19; Document sheet issued by Bangalore Advocates Co-operative Society Ltd (BACSL)
Allotment letter draft
PERFORMA OF ALLOTMENT LETTER FOR MY GATE.pdf
1date(s) visible: 87/99/87, 23/11/2015
Encumbrance certificate
8 ENCUMBRANCE CERTIFICATE.pdf
11Visible date: 07/Jan/2006; Survey number referenced (Sy No. 99, Old No. 112, changed to 113) in property schedule; Land conversion / CLU language: 'Converted residential Purpose' explicitly stated; Village and Hobli identified: Horamavu Agara Village, K R Puram Hobli, BETQ
JDA / development agreement
PARTNERSHIP DEED.pdf
11PDF appears scanned or text extraction was limited
Land conversion / CLU
CONVERSION CERTIFICATE (1).pdf
6PDF appears scanned or text extraction was limited
Form B declaration
DECLARATION FORM (B).pdf
3PDF appears scanned or text extraction was limited

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 18 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 20 Jul 2021, extended (Covid Extension) to 20 Apr 2022 — both dates have passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectRAMESH S-2005next to bbmp office, k r puram
Structural engineerY BHASKAR---

Facilities & Paperwork Readiness

Buyer paperwork readiness

RERA filing

Key legal and booking documents surfaced from the K-RERA catalog. This is not legal advice and does not replace a lawyer's title due diligence, but it shows which drafts/filings are actually visible before you pay a token or sign.

Document typeStatusCatalog file
Agreement for sale draftOn fileSALE DEED&RTC.pdf
Allotment letter draftOn filePERFORMA OF ALLOTMENT LETTER FOR MY GATE.pdf
Sale deed proformaOn filePERFORMA OF SALE DEED OF MY GATE.pdf
Form B declarationOn fileDECLARATION FORM (B).pdf
Commencement certificateOn fileCOMMENCEMENT CERTIFICATE.pdf
Encumbrance certificateOn file8 ENCUMBRANCE CERTIFICATE.pdf
Land conversion / CLUOn fileCONVERSION CERTIFICATE (1).pdf
JDA / development agreementOn filePARTNERSHIP DEED.pdf

Treat placeholders and missing rows as questions, not accusations: ask the builder for the current document and have your lawyer review the actual signed version before committing.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

The estimated cost above is the developer's declared construction cost only (K-RERA's own label: "Estimated Cost of Construction as certified by Engineer") — it excludes land cost, so it isn't comparable to the buyer-collection figures below or to a sale price.

RERA 70% project account is on file: ICICI Bank KAMANHALLI (IFSC ICIC0000298, a/c …4864). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

How to use this report

If a builder or broker has shown you a specific unit: the sanctioned plan filed with K-RERA usually doesn't print flat numbers directly — it identifies units by block, wing, and floor. Find the card in the unit-level section matching your unit's location and bedroom count, then compare its room sizes and total area against other units of the same configuration in this project. If yours is noticeably smaller for the same number of bedrooms, that's worth asking the builder about directly.

Before signing anything: check the litigation & compliance section above — any declared dispute on the project should factor into your decision.

Want to verify something yourself? Every document this report draws from is listed in the catalog just below, with a direct link to K-RERA's own copy.

How confident is each fact? Every section is tagged by source:

RERA filing Highest confidence — read straight off the K-RERA registry (registration, OC status, litigation, builder history, the document list). Verifiable against the filings.
Vision-read from plan Approximate — read by AI vision off the developer's scanned plan PDFs (room dimensions, unit areas, where infrastructure sits). Good signal, but it's OCR of a noisy scan, not a survey — confirm anything decision-critical against the linked plan.
Inferred Lowest confidence — a heuristic layered on the above (e.g. approximate compass facing, corner-unit guess). Directional only; never a substitute for a site visit or a vastu consultation.

Document catalog

RERA filing

Every document row on file with K-RERA for this project. Plan-like filings are processed for report intelligence when usable; buyer-critical support PDFs are selectively downloaded for read-through; placeholder uploads are shown as not usable; other compliance documents link directly to K-RERA's own copy.

DocumentFilenameStatus
Promoter TypeFIRM REGISTRATION CERTIFICATE.pdfView on K-RERA →
AddressPHOTO OF MANAGING PARTNER S SURESH.pdfView on K-RERA →
TypePHOTO OF MANAGING PARTNERS.pdfView on K-RERA →
TypePHOTO OF MANAGING PARTNERS.pdfView on K-RERA →
Project End Date provided under Section 6PAN CARD.pdfView on K-RERA →
Commencement CertificateCOMMENCEMENT CERTIFICATE.pdfDownloaded for read-through →
Approved Building/Plotting PlanAPPROVED BUILDING OR PLOTTING PLAN & BBM LICENSE & COMMENCEMENT CERTIFICATE.pdfProcessed for plan intelligence
Approved Layout PlanAPPROVED BUILDING OR PLOTTING PLAN & BBM LICENSE & COMMENCEMENT CERTIFICATE.pdfProcessed for plan intelligence
Proforma For Sale DeedPERFORMA OF SALE DEED OF MY GATE.pdfDownloaded for read-through →
Proforma of Agreement for SaleSALE DEED&RTC.pdfDownloaded for read-through →
Approved Section Of Building/Infrastructure Plan of PlottingINFRASTRUCTURE PLAN OF PLOTTING.pdfProcessed for plan intelligence
Area Development Plan Of Project AreaAREA DEVELOPMENT PLAN OF PROJECT AREA.pdfProcessed for plan intelligence
Performa of Allotment LetterPERFORMA OF ALLOTMENT LETTER FOR MY GATE.pdfDownloaded for read-through →
Brochure of Current ProjectMITRAA MYGATE.pdfView on K-RERA →
Project SpecificationMITRAA PROPERTIES SPECIFICATION.pdfView on K-RERA →
Encumbrance Certificate8 ENCUMBRANCE CERTIFICATE.pdfDownloaded for read-through →
Section 3(1) Notarized AffidavitKHATHA.pdfView on K-RERA →
Joint Development AgreementPARTNERSHIP DEED.pdfDownloaded for read-through →
Conversion Certificate under Sec 95 of the KLR Act 1961CONVERSION CERTIFICATE (1).pdfDownloaded for read-through →
KSPCBKSPCB MY-GATE NOC.pdfView on K-RERA →
Existing Layout PlanAPPROVED BUILDING OR PLOTTING PLAN & BBM LICENSE & COMMENCEMENT CERTIFICATE.pdfProcessed for plan intelligence
Existing Section Plan and SpecificationAREA DEVELOPMENT PLAN OF PROJECT AREA.pdfProcessed for plan intelligence
Change of Land UseCONVERSION CERTIFICATE (1).pdfDownloaded for read-through →
Declaration (Form B)DECLARATION FORM (B).pdfDownloaded for read-through →

Request the report on MY GATE

We analyse MY GATE in full and send you the RERA Property Intelligence Report — we analyse in 1 working day.

Something went wrong — email hello@quietlist.in instead.