Bangalore/Project record

K-RERA · the public record

GROUP HOUSING SCHEME AT GADAG - BETAGERI

· GROUP HOUSING SCHEME AT GADAG-BETAGERI IN SY NO. 360/1B+1C

Project Review · example purchase

Spending a few crores on a unit? ₹4,999 to check what you’re buying.

Check what the plans put beside your unit, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.

See the report before you buy

Avoid bad decisions, only go for the best units.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project Review sample ↗
120registered unitsK-RERA registration · read 16 Jul 2026

Free project details

Registration read 16 Jul 2026

Registered units and project size

Flats
120

Filed categories, unchanged · K-RERA registration · read 16 Jul 2026

The whole registration

0.5registered acres

218.8registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for GROUP HOUSING SCHEME AT GADAG - BETAGERI

K-RERA · PRM/KA/RERA/1260/414/PR/100625/007810

Project facts and comparisons

On the register

Land area2,219 sq m (0.5 acres)
Homes registered120
Tower/wing entries1
Unit mix120 × Flats

In context

Density218.8 homes per acre
Density in context98th percentile of 4913 projects in this register (median 82)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units120Total inventory registered with K-RERA.
Official carpet area300 sqmTotal carpet area reported for the project.
Official built-up area9,998 sqmUseful scale context when comparing density and project cost.
Registered land area2,219 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)4Separate filed counts; these categories may overlap and are not added together.
Covered-parking field1Separate filed counts; these categories may overlap and are not added together.
Open-parking field4Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberSRVBPA01/2022-23Use this to match the sanctioned drawing set shown by the builder.
Plan approval date05-06-2022
Project start date18-01-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Flats120100%0 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Gadag4120412 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 120 official flat/unit rows, matching the 120 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK12055.1-62.1 sqm0.0 sqm0 (120 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Gadag12055.1-62.1 sqm0.0 sqm0 (120 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1Gadag12 BHK56.1 sqm0.0 sqm0
2Gadag12 BHK55.1 sqm0.0 sqm0
3Gadag12 BHK55.1 sqm0.0 sqm0
4Gadag12 BHK56.1 sqm0.0 sqm0
5Gadag12 BHK56.1 sqm0.0 sqm0
6Gadag12 BHK55.1 sqm0.0 sqm0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

The promoter answered No to the land-litigation question. This is a filed declaration, not a court search.

All 33 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 21 Jan 2025 — which has passed with no OC on file.

Approval documents

Electricity (BESCOM/ESCOM)Document listed: ESCOM/Electricity
Water & sewage (BWSSB/KWSSB)Document listed: KWSSB/Water
Fire NOCDocument listed: Fire Force Department
Pollution control (KSPCB)Document listed: KSPCB
Environmental clearanceDocument listed: SEIAA
Airport Authority height clearanceDocument listed: Airport Authority of India

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Complaints on this project's K-RERA page (1 complaint listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/200402/0005787
02-04-2020
Discrimination in allotting Car parking at KHB PlatinumKHB Platinum (another project by this promoter)POSTED FOR ORDERS AUTHORITY BENCH4

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantAravind M Hejib00000000000000010Dharwad, Karnataka - 580008
EngineerAngadi1111111111110010Dakshina Kannada, Karnataka - 580030
ArchitectSandeep Hulkoti Architects & Associates.1111111111110010Dakshina Kannada, Karnataka - 580030
ContractorKMV Project. Ltd-0010Bengaluru Urban, Karnataka - 560020

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹24.9 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: Union Bank of India gadag IFSC Code : UBIN0900621 Pin Code : 582101. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest of the listed job hubs is about 340 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
Kempegowda Int'l Airport332 km
Outer Ring Road / Manyata340 km
MG Road / city centre345 km
Bellandur–Marathahalli belt354 km
Whitefield IT hub355 km
Electronic City360 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Group Housing.

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 16 Jul 2026. Document and inventory dates are shown in their sections.