Bangalore/Project record

K-RERA · the public record

Matoshree Lifestyle Mall

· Suvidha Realtors And Constructions

Project Review · example purchase

Spending a few crores on a unit? ₹4,999 to check what you’re buying.

Check what the plans put beside your unit, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.

See the report before you buy

Avoid bad decisions, only go for the best units.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project Review sample ↗
24registered unitsK-RERA registration · read 16 Jul 2026

Free project details

Registration read 16 Jul 2026

Registered units and project size

Filed categories, unchanged · K-RERA registration · read 16 Jul 2026

The whole registration

0.3registered acres

92.2registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for Matoshree Lifestyle Mall

K-RERA · PRM/KA/RERA/1259/410/PR/180111/001170

Project facts and comparisons

On the register

Land area1,053 sq m (0.3 acres)
Homes registered24
Tower/wing entries1

In context

Density92.2 homes per acre
Density in context62nd percentile of 4913 projects in this register (median 82)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units24Total inventory registered with K-RERA.
Registered land area1,053 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.21Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Open-parking field0Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date29-07-2013

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
MATOSHREE LIFESTYLE MALL3240-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 24 official flat/unit rows, matching the 24 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
SHOP2421.0-126.0 sqm5.8-46.2 sqm0 (24 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
MATOSHREE LIFESTYLE MALL2421.0-126.0 sqm5.8-46.2 sqm0 (24 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
B1MATOSHREE LIFESTYLE MALL0SHOP21.0 sqm7.9 sqm0
B2MATOSHREE LIFESTYLE MALL0SHOP27.0 sqm9.9 sqm0
B3MATOSHREE LIFESTYLE MALL0SHOP33.0 sqm12.3 sqm0
B4MATOSHREE LIFESTYLE MALL0SHOP26.0 sqm9.8 sqm0
G1MATOSHREE LIFESTYLE MALL0SHOP43.0 sqm11.2 sqm0
G2MATOSHREE LIFESTYLE MALL0SHOP43.0 sqm10.9 sqm0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

19 of 45 compliance document slots are filed as Not Applicable; the remaining 26 slots have usable uploaded filings.

✓ Completion certificate (OC) is on file.

Approval documents

Electricity (BESCOM/ESCOM)Not identified in the document list
Water & sewage (BWSSB/KWSSB)Not identified in the document list
Fire NOCNot identified in the document list
Pollution control (KSPCB)Not identified in the document list
Environmental clearanceNot identified in the document list
Airport Authority height clearanceNot identified in the document list

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectAmit N Patil-2003Vashi, Mumbai
Structural engineerRaajesh K Ladhad---

Builder track record

RERA filing

Suvidha Realtors has 3 other K-RERA-registered projects in our records. 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

No quarterly financial disclosures on record — expected for a project that's already received its completion certificate and stopped filing quarterly updates after handover.

Declared construction cost ÷ registered units averages to ₹28.5 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: INDIAN OVERSEAS BANK Koppikar Road (IFSC IOBA0000126, a/c …1576). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest of the listed job hubs is about 12 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
Outer Ring Road / Manyata12 km
MG Road / city centre13 km
Bellandur–Marathahalli belt22 km
Whitefield IT hub27 km
Electronic City27 km
Kempegowda Int'l Airport27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Suvidha Realtors.
Suvidha Realtors has 4 projects registered in Bangalore.

Other projects by this builder in Bangalore

Suvidha Indraprastha Phase I
No filings
Suvidha Indraprastha Phase II
No filings

Other RERA-registered projects in T. Dasarahalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 16 Jul 2026. Document and inventory dates are shown in their sections.