RERA Property Intelligence Report · Preview

MURLIDHAR NIWAS

KESHAVA LIFESPACES · · K-RERA PRM/KA/RERA/1274/351/PR/280324/006764

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

54
Registered units
₹13.0 Cr
Est. construction cost
Units profiled
35
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units54Total inventory registered with K-RERA.
Official carpet area4,075 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area5,402 sqmUseful scale context when comparing density and project cost.
Registered land area1,795 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.27Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed29 total (29 covered, 0 open) — 0.54 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberKWR-LBPAS-10954/23-24/BPUse this to match the sanctioned drawing set shown by the builder.
Plan approval date22-01-2024
Project start date07-03-2024

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK47%340 sqm
1 BHK1630%968 sqm
2 BHK3463%2,767 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
MURLIDHAR NIWAS5542914.85 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 54 official flat/unit rows, matching the 54 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK3471.3-92.6 sqm1.9 sqm17 (17 with 0)
1 BHK1653.7-79.4 sqm1.5 sqm12 (4 with 0)
3 BHK485.0 sqm2.5 sqm0 (4 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
MURLIDHAR NIWAS5453.7-92.6 sqm1.5-2.5 sqm29 (25 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
GF 01MURLIDHAR NIWAS12 BHK89.5 sqm1.9 sqm1
GF 02MURLIDHAR NIWAS12 BHK74.7 sqm1.9 sqm0
101MURLIDHAR NIWAS22 BHK73.9 sqm1.9 sqm1
102MURLIDHAR NIWAS23 BHK85.0 sqm2.5 sqm0
103MURLIDHAR NIWAS22 BHK90.9 sqm1.9 sqm0
104MURLIDHAR NIWAS22 BHK76.0 sqm1.9 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~812 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 54 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe registration form discloses 29 parking spaces, but the official unit register allots 29 lots across 29 of 54 unit rows (~0.5 per home) — read the form figure as the separately-disclosed lots, not total supply, and confirm your unit's allotted lots in the agreement.
Your land share (UDS)Undivided land share averages ~2 sqm per home; across all 54 homes that is ~6% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

9 of 28 compliance document slots are filed as Not Applicable; the remaining 19 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

10 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantDivina Nandwan6021682020Pune, Maharashtra - 411045
EngineerMAHESH LALWANIKWR/BL/10232/23-241991Uttara Kannada, Karnataka - 581301
ArchitectKARAN A BALLANICA/2019/1119151991Thane, Maharashtra - 421003
ContractorKESHAVA LIFESPACES-2022Uttara Kannada, Karnataka - 581301

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹10.91 Cr collected from buyers, ₹7.55 Cr withdrawn from the project's escrow account.

Construction progress65% → 75% (+10 pts)
Units sold/booked as registered37/54 (69%)
Buyer collections in available QPRs₹28.66 Cr
Escrow withdrawals in available QPRs₹19.44 Cr (0.68x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹24.1 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Bank of Baroda KARWAR IFSC Code : BARB0KARWAR Pin Code : 581301. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~424 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
Outer Ring Road / Manyata424 km
Kempegowda Int'l Airport425 km
MG Road / city centre426 km
Bellandur–Marathahalli belt436 km
Electronic City439 km
Whitefield IT hub440 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Keshava Lifespaces.

Other RERA-registered projects in Kalyan Nagar

Major developers building in Kalyan Nagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Murlidhar Niwas?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026