K-RERA · the public record
Spoorthy coconut garden
· K.K.ANIL KUMAR
Is this the right project?
Which unit should you choose?
Read the free RERA facts below. For help choosing a unit or comparing a price, select a report.
See the report before you buy
Avoid bad decisions, only go for the best units.
Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.
Read the Project Review sample ↗From another project
See the report before you buy.
A published sample shows the level of detail, source illustrations and buyer reasoning. Its findings belong to that project.
Read a sample report ↗Free project details
Registration read 16 Jul 2026RERA details for Spoorthy coconut garden
K-RERA · PRM/KA/RERA/1272/394/PR/020925/008048
Project areas, parking and inventory
Project areas and parking
RERA filing| Disclosure | Official value | Why it matters |
|---|---|---|
| Approved plan number | 234/2021-22 | Use this to match the sanctioned drawing set shown by the builder. |
| Plan approval date | 12-06-2023 | |
| Project start date | 06-09-2023 |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingThe promoter answered No to the land-litigation question. This is a filed declaration, not a court search.
All 19 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Mar 2026 — which has passed with no OC on file.
Approval documents
A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
Project team & certifications
RERA filingK-RERA names 2 project professional/vendor rows across Chartered accountant, Engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Chartered accountant | Bhaskar K | 259490 | 2019 | Hyderabad, Telangana - 500027 |
| Engineer | Pooja m s | TUDA/EST/CR/41/2019-20 | 2019 | Tumakuru, Karnataka - 572102 |
Builder track record
RERA filingAnil Kumar has 3 other K-RERA-registered projects in our records (average reported construction progress 20%). 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
The estimated cost above is the developer's declared construction cost only (K-RERA's own label: "Estimated Cost of Construction as certified by Engineer") — it excludes land cost, so it isn't comparable to the buyer-collection figures below or to a sale price.
RERA 70% project account is on file: Karnataka Bank Ltd. TUMKUR IFSC Code : KARB0000757 Pin Code : 572102. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Location & Connectivity
The nearest of the listed job hubs is about 52 km in a straight line from the mapped location. Road distance and travel time will differ.
| Landmark | Straight-line |
|---|---|
| Outer Ring Road / Manyata | 52 km |
| Kempegowda Int'l Airport | 55 km |
| MG Road / city centre | 55 km |
| Bellandur–Marathahalli belt | 65 km |
| Whitefield IT hub | 68 km |
| Electronic City | 69 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.