NORTHERNSKY BARRIO

· J V BUILDERS

Project Review · example purchase

Spending a few crores on a unit? ₹4,999 to check what you’re buying.

Check what the plans put beside your unit, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.

See the report before you buy

Avoid bad decisions, only go for the best units.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project Review sample ↗
27registered unitsK-RERA registration · read 16 Jul 2026

Free project details

Registration read 16 Jul 2026

Registered units and project size

Filed categories, unchanged · K-RERA registration · read 16 Jul 2026

The whole registration

0.3registered acres

84.4registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for NORTHERNSKY BARRIO

K-RERA · PRM/KA/RERA/1257/333/PR/220406/004816

Project facts and comparisons

On the register

Land area1,294 sq m (0.3 acres)
Homes registered27
Tower/wing entries1

In context

Density84.4 homes per acre
Density in context53rd percentile of 4913 projects in this register (median 82)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units27Total inventory registered with K-RERA.
Official carpet area33,926 sqmTotal carpet area reported for the project.
Registered land area1,294 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI3.048Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)43Separate filed counts; these categories may overlap and are not added together.
Open-parking field2Separate filed counts; these categories may overlap and are not added together.
Garage field43Separate filed counts; these categories may overlap and are not added together.
Project start date23-04-2021

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
NA42743-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 27 official flat/unit rows, matching the 27 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK10106.0-111.2 sqft3.5-3.6 sqft0 (10 with 0)
2BHK777.1-81.2 sqft2.5-2.6 sqft0 (7 with 0)
COMMERCIAL750.9-146.2 sqft1.5-4.4 sqft0 (7 with 0)
SHOP2629.5-724.9 sqft1.8-21.4 sqft0 (2 with 0)
4BHK1140.5 sqft4.3 sqft0 (1 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
NA2750.9-724.9 sqft1.5-21.4 sqft0 (27 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
LG01NA0SHOP629.5 sqft1.8 sqft0
UG01NA0SHOP724.9 sqft21.4 sqft0
FF1NA1COMMERCIAL79.6 sqft2.4 sqft0
FF2NA1COMMERCIAL146.2 sqft4.4 sqft0
FF3NA1COMMERCIAL60.5 sqft1.9 sqft0
FF4NA1COMMERCIAL99.3 sqft3.0 sqft0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

16 of 37 compliance document slots are filed as Not Applicable; the remaining 21 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2025 — which has passed with no OC on file.

Approval documents

Electricity (BESCOM/ESCOM)Not identified in the document list
Water & sewage (BWSSB/KWSSB)Not identified in the document list
Fire NOCDocument listed: Fire Force Department
Pollution control (KSPCB)Document listed: KSPCB
Environmental clearanceNot identified in the document list
Airport Authority height clearanceNot identified in the document list

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectRajeshwari B E-19966th floor Empire mall, M.G Road Mangalore
ContractorJV Builders-20121st Floor JV Building, Hamapankatta
Structural engineerNikhil Shanghvi---

Builder track record

RERA filing

Builders has 40 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Builders”) (average reported construction progress 73%). 17 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹50.8 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: STATE BANK OF INDIA BUNTWAL CROSS ROAD (IFSC SBIN0004608, a/c …6827). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest of the listed job hubs is about 10 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
MG Road / city centre3 km
Outer Ring Road / Manyata10 km
Bellandur–Marathahalli belt12 km
Electronic City16 km
Whitefield IT hub19 km
Kempegowda Int'l Airport30 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Builders.
Builders has 17 projects registered in Bangalore, 3 completed.
1 complaints on the K-RERA register against Builders in Bangalore.

Other projects by this builder in Bangalore

Casa Luxuria
Filing overdue · 100% built · 34% sold
Northernsky Evolve
Filing overdue · 25% built · 0% sold
Northernsky Westvalley
Filing overdue · 100% built · 86% sold
Rama Ranga
Filing overdue · 13% built · 31% sold
RED Stone Enclave
Filing overdue · 100% built · 50% sold

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 16 Jul 2026. Document and inventory dates are shown in their sections.