RERA Property Intelligence Report · Preview

Rajnandini Residency

Belgaum Infra Build · · K-RERA PRM/KA/RERA/1249/447/PR/281022/005357

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

38
Registered units
₹5.4 Cr
Est. construction cost
Units profiled
50
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units38Total inventory registered with K-RERA.
Official carpet area1,989 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area2,206 sqmUseful scale context when comparing density and project cost.
Registered land area813 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.71Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed21 total (21 covered, 0 open) — 0.55 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberBGM-LBPAS-18413/21-22/BPUse this to match the sanctioned drawing set shown by the builder.
Plan approval date28-03-2022
Project start date01-01-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2BHK3294%1,539 sqm
Commercial13%376 sqm
Shop13%0 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Rajnandini Residency6382114.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 35 official flat/unit rows vs 38 registered units disclosed above; ask why the row count differs. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK3144.9-54.6 sqm18.8-22.9 sqm19 (12 with 0)
NA20.0-54.3 sqm0.0-22.8 sqm1 (1 with 0)
COMMERCIAL1375.8 sqm157.3 sqm0 (1 with 0)
SHOP120.0 sqm8.4 sqm1

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Rajnandini Residency350.0-375.8 sqm0.0-157.3 sqm21 (14 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
G-1Rajnandini Residency1SHOP20.0 sqm8.4 sqm1
G-2Rajnandini Residency1COMMERCIAL375.8 sqm157.3 sqm0
F-1Rajnandini Residency22 BHK45.0 sqm18.9 sqm1
F-2Rajnandini Residency22 BHK45.5 sqm19.1 sqm1
F-3Rajnandini Residency22 BHK46.5 sqm19.5 sqm1
F-4Rajnandini Residency22 BHK54.3 sqm22.8 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~630 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a boutique, low-density project — 38 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe registration form discloses 21 parking spaces, but the official unit register allots 21 lots across 21 of 35 unit rows (~0.6 per home) — read the form figure as the separately-disclosed lots, not total supply, and confirm your unit's allotted lots in the agreement.
Your land share (UDS)Undivided land share averages ~25 sqm per home; across all 38 homes that is ~115% of the plot — unusually high — likely an extraction artefact; verify the UDS figures against your draft deed. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 43 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2025 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 5 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantShrinivas Narayan Shivangi200-214701981Belagavi, Karnataka - 590006
EngineerSagar V,HuddarNO/CCB/PWD/DM/STRUL/151/20-232011Belagavi, Karnataka - 590010
ArchitectKuldeep Y. HangirgekarCA/2006/375412006Belagavi, Karnataka - 590001
ContractorYuvaraj K.Hulji-2018Belagavi, Karnataka - 591113
ContractorSeema Y.Hulji-2022Belagavi, Karnataka - 591113

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹14.2 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Union Bank of India kadolkargalli, Belgaum IFSC Code : UBIN0547158 Pin Code : 590002. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~8 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
MG Road / city centre1 km
Outer Ring Road / Manyata8 km
Bellandur–Marathahalli belt11 km
Electronic City16 km
Whitefield IT hub16 km
Kempegowda Int'l Airport27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Belgaum Infra.
Belgaum Infra has 2 projects registered in Bangalore.

Other projects by this builder in Bangalore

Swaraj Pride
Filing overdue · 61% built · 16% sold

Other RERA-registered projects in Ashok Nagar

Sobha Crystal Meadows Phase 1 Wing 1 To 6

Major developers building in Ashok Nagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Rajnandini Residency?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026