Bangalore/Project record

K-RERA · the public record

SHAKAMBARI RESIDENCY

· RAVINDRA and ASSOCIATES

Is this the right project?
Which unit should you choose?

Read the free RERA facts below. For help choosing a unit or comparing a price, select a report.

See the report before you buy

See the findings, not just a list of checks.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project X-Ray sample ↗
12registered unitsK-RERA registration · read 16 Jul 2026

Free project details

Registration read 16 Jul 2026

Registered units and project size

Apartment - Second Floor 2BHK
3

Filed categories, unchanged · K-RERA registration · read 16 Jul 2026

The whole registration

0.1registered acres

95.4registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for SHAKAMBARI RESIDENCY

K-RERA · PRM/KA/RERA/1259/410/PR/220214/004699

Project facts and comparisons

On the register

Land area509 sq m (0.1 acres)
Homes registered12
Tower/wing entries1
Unit mix3 × Apartment - Second Floor 2BHK

In context

Density95.4 homes per acre
Density in context65th percentile of 4932 projects in this register (median 81.9)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units12Total inventory registered with K-RERA.
Official carpet area745 sqmTotal carpet area reported for the project.
Registered land area509 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.9Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)12Separate filed counts; these categories may overlap and are not added together.
Open-parking field7Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date02-03-2021

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Apartment - Second Floor 2BHK3100%745 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower A41212-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 12 official flat/unit rows, matching the 12 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK1262.1 sqm42.4 sqm12

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower A1262.1 sqm42.4 sqm12
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
101Tower A12BHK62.1 sqm42.4 sqm1
102Tower A12BHK62.1 sqm42.4 sqm1
103Tower A12BHK62.1 sqm42.4 sqm1
201Tower A22BHK62.1 sqm42.4 sqm1
202Tower A22BHK62.1 sqm42.4 sqm1
203Tower A22BHK62.1 sqm42.4 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

7 of 21 compliance document slots are filed as Not Applicable; the remaining 14 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 30 Jun 2023 — which has passed with no OC on file.

Approval documents

Electricity (BESCOM/ESCOM)Document listed: BESCOM
Water & sewage (BWSSB/KWSSB)Document listed: BWSSB
Fire NOCDocument listed: Fire Force Department
Pollution control (KSPCB)Not identified in the document list
Environmental clearanceNot identified in the document list
Airport Authority height clearanceNot identified in the document list

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ContractorRavindra Deshpande-2000Malamaddi Road, Dharwad
Structural engineerErShivanand. S Gopai---

Builder track record

RERA filing

Ravindra has 3 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Ravindra And”) (average reported construction progress 60%). 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹13.3 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: Karnataka Bank Ltd. Gopalpura Branch, Station Road Malamaddi Dharwad-580007 (IFSC KARB0000258, a/c …2201). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest of the listed job hubs is about 11 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
MG Road / city centre5 km
Bellandur–Marathahalli belt11 km
Electronic City12 km
Outer Ring Road / Manyata13 km
Whitefield IT hub18 km
Kempegowda Int'l Airport32 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Ravindra And.
Ravindra And has 2 projects registered in Bangalore.

Other projects by this builder in Bangalore

Other RERA-registered projects in Jayanagar

Assetz Canvas & Cove 2.0 – Block B & C
Assetz Canvas & Cove 2.0 - Block A

Major developers building in Jayanagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 16 Jul 2026. Document and inventory dates are shown in their sections.