RERA Property Intelligence Report · Preview

Sobha Valley View - Heritage

Sobha · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/170916/000117

The Drawings Report · ₹4,999

Which flat should you ask for in Sobha Valley View - Heritage?

We read all 5 approved drawings and 48 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
130
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

Sobha Valley View - Heritage spans 3.2 acres with 4 towers and 312 registered flats, estimated at ₹261.9 crore. With 98.9 homes per acre, it ranks at the 80th percentile of the 784 Bengaluru South projects tracked here (median 77.3). Its declared completion date of 1 February 2019 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion1 February 2019
Land area12,762 sq m (3.2 acres)
Homes registered312
Towers4
Unit mix312 × Flats

In context

Density98.9 homes per acre
Density in context80th percentile of 785 Bengaluru South projects (median 77.3)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Sobha Valley View - Heritage is registered with K-RERA as PRM/KA/RERA/1251/310/PR/170916/000117, and the promoter has declared completion for 1 Feb 2019.

1 Feb 2019

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Sobha Valley View - Heritage spans 12,762 sq m (3.15 acres), comprises 4 towers, registers 312 units, and is declared to cost ₹261.9 cr.

₹261.9 cr

declared project cost

3.15acres

12,762 sq m

312units

on the registration

1.466FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

Promoter record

What else is this promoter on record for?

Sobha is the promoter of record on 130 projects registered with K-RERA, 59 of which are past their declared completion dates on the register.

130projects

registered with K-RERA

59past declared date

on the register

66%

average construction reported

Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.

Source · K-RERA register, all projects · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

312
Registered units
₹261.9 Cr
Est. construction cost
Units profiled
53
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units312Total inventory registered with K-RERA.
Official carpet area31,218 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area12,762 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.466Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings4Official tower/wing count in the K-RERA detail page.
Parking disclosed407 total (31 open) — 1.30 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date09-12-2014

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Flats312100%31,218 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Wing 11378102-
Wing 21378102-
Wing 31378102-
Wing 41378101-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 312 official flat/unit rows, matching the 312 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK2081,114.2-1,266.8 sqft456.5-551.5 sqft208
2 BHK104917.0 sqft369.3-406.0 sqft104

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Wing 178917.0-1,266.8 sqft369.3-551.5 sqft78
Wing 278917.0-1,131.6 sqft369.3-497.8 sqft78
Wing 378917.0-1,134.5 sqft369.3-497.8 sqft78
Wing 478917.0-1,266.8 sqft369.3-551.5 sqft78
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
3A1 - 1011Wing 113 BHK1,266.8 sqft551.5 sqft1
2A1 - 1012Wing 112 BHK917.0 sqft406.0 sqft1
3E1 - 1013Wing 113 BHK1,134.5 sqft496.9 sqft1
3K1 - 1014Wing 113 BHK1,114.2 sqft473.1 sqft1
2B1 - 1015Wing 112 BHK917.0 sqft406.0 sqft1
3B1 - 1016Wing 113 BHK1,266.8 sqft551.5 sqft1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,077 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 312 homes across 4 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 407 parking spaces for 312 homes (~1.3 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~440 sqft per home; across all 312 homes that is ~100% of the plot — the undivided shares sum to close to the whole plot.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

9 of 48 compliance document slots are filed as Not Applicable; the remaining 39 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 01 Feb 2019 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (17 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Ananda Mysore Srinivasa vs Sobha Valley View - HeritageAs per Page No. 10 of the ComplaintAUTHORITY23/03/2026
PADMASHREE vs Sobha Valley View - HeritageSeeking the refund of amount paid along with interior cost and interest there on. Further, praying the Authorities to initiate the proceedings u/s 61 of the Act and levy the penalty.AUTHORITY23/03/2026
M S Shivakumar HUF vs M/S SOBHA LIMITEDReturn of total money paid and interest thereon as prescribed, Compensation for mental agony caused and litigation charges and any other reliefs that this Hon'ble Authority deems fit.AUTHORITY18/02/2025
ANIL HANDIGOL vs SOBHA LIMITEDRefund of Money Paid along with interestAUTHORITY17/08/2023
Hemambika Subramani vs Sobha LimitedReturn of sale consideration + interest under Section 18 and compensation under section 72AUTHORITY14/09/2023
T K JAIDEEP vs SOBHA LIMITEDreturn of amount + interest + compensation under section 18 read with section 72AUTHORITY14/09/2023
Viswanath Rajagopal Shasthry vs Sobha LimitedReturn of sale consideration with interest under section 18 + compensation under section 72AUTHORITY14/09/2023
ARUN MALA JANARDHAN vs SOBHA VALLYcompensation for delayed registrationAUTHORITY14/09/2023
SHIV SHANKAR T R and SHRUTHI B N vs Sobha LimitedRelief sought as per page no. 15 to 17 attachedAUTHORITY12/01/2026
GIRISH NAGENAHALLI vs Sobha LimitedRelief sought as per page No. 22-24 and IA application along with AffidavitAUTHORITY12/01/2026
Raghavendra Prasad Ashwathanarayana Rao vs Sobha LimitedRestraining the developers / promotors / Original JDA holders of the project by way of permanent injunction from reconveying the land in Sy No. Sy No 48/6, 48/7 back to original owners.AUTHORITY07/11/2025
Shiv Shankar T R and Shruthi B N vs Sobha LimitedAs per page 13 - 22 and 24 - 25 of the complaintAUTHORITY03/01/2026
Jayasimha T V vs Sobha LimitedPage No. 10 of ReliefAUTHORITY03/01/2026
GIRISH NAGENAHALLI vs Sobha LimitedCompensation for delay in obtaining the OC and registration of propertyAUTHORITY03/01/2026
Sunil Janardhan Bhat vs Sobha LimitedThe complaint prays for the relief sought as per pg 8 of the attachmentAUTHORITY03/01/2026
Dr Harini Priyadarshini vs Sobha LimitedCompensation as per the Pg No. 15 of ComplaintAUTHORITY03/01/2026
RAGHAVA BADA CHINNAPPA vs Sobha LimitedSeeking the refund of amount paid along with interior cost and interest there on. Further, praying the Authorities to initiate the proceedings u/s 61 of the Act and levy the penaltyAUTHORITY03/01/2026

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (127 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190217/0002175
17-02-2019
Compensation for Delay of projectsSobha City - Casa Paradiso Block 4 (another project by this promoter)DISPOSED AO
CMP/190218/0002166
18-02-2019
Refund of booking amountSobha Dream Acres - Palm Springs Phase 17 Wing 54 (another project by this promoter)DISPOSED AO
CMP/190225/0002263
25-02-2019
Refund of Advance amount-Sobha Arena - The Park ( Block 2 ) (another project by this promoter)DISPOSED AO
CMP/190308/0002388
08-03-2019
Non-allotment of agreed units & RefundSobha Indraprastha (another project by this promoter)DISPOSED AO
CMP/190308/0002322
08-03-2019
Promoter SL Demanding 38% payment of unit cost before entering the ATSSobha Arena - Pebble Court (Block 1) (another project by this promoter)DISPOSED AO
CMP/190315/0002219
15-03-2019
About refund of booking amountSobha Dream Acres - Tropical Greens Phase 8 Wing 43 and 44 (another project by this promoter)DISPOSED AO
CMP/190324/0002505
24-03-2019
Compensation against late deliverySobha City - Casa Paradiso Block 4 (another project by this promoter)DISPOSED AO
CMP/190401/0002556
01-04-2019
Please refund booking amountSobha Dream Acres - Rain Forest Phase 2 Wing 3 and 4 (another project by this promoter)DISPOSED AO

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectVinita Agast-2006Sarjapur-Marthahalli Outer Ring Road, Bellandur
ContractorSobha Limited-1995Sarjapur-Marthahalli Outer Ring Road, Bellandur
Structural engineerAnilkumar S Hokrani---

Builder track record

RERA filing

Sobha has 130 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Sobha”) (average reported construction progress 66%). 59 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹83.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank MG ROAD (IFSC UTIB0000009, a/c …4553). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 15 project-photo uploads from Oct 2017 across Wing 1, 2, 3, 4. Views named in the filings include East, Nort, North, Sout, South, West.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~16 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
MG Road / city centre10 km
Outer Ring Road / Manyata16 km
Bellandur–Marathahalli belt17 km
Electronic City17 km
Whitefield IT hub24 km
Kempegowda Int'l Airport35 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

5approved drawings on file
48other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 5 approved sheets are the same drawings the builder filed to get Sobha Valley View - Heritage approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sobha. View Sobha's full track record →
Sobha has 123 projects registered in Bangalore, 24 completed.
274 complaints on the K-RERA register against Sobha in Bangalore.

Buyer reviews · MouthShut

★★☆☆☆ 1.6/5

337 reviews for Sobha in Bangalore
Read 337 reviews on MouthShut →

Other projects by this builder in Bangalore

Sobha Crystal Meadows Phase 1 Wing 1 To 6
Filing overdue · 5% built · 0% sold
Sobha Crystal Meadows Phase 2 Wing 7 And 8
Filing overdue · 2% built · 0% sold
Sobha Crystal Meadows Phase 3 Wing 9 To 15
Filing overdue · 2% built · 0% sold
Sobha Crystal Meadows Phase 4 Wing 23 To 28
Filing overdue · 2% built · 0% sold
Sobha Crystal Meadows Phase 5 Wing 16 To 22
Filing overdue · 2% built · 0% sold
Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22
Filing overdue · 100% built · 100% sold

Other RERA-registered projects in Rajarajeshwari Nagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Sobha Valley View - Heritage?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026