S.S.Builders and Developers · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/180728/001963
The Drawings Report · ₹4,999
We read all 7 approved drawings and 35 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.
One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.
Get it for this project →Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.
Free before you decide: the 14 things to get in writing before you book
Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.
Send the checklist to the family group Read it here →SS SNOWDROP occupies 6,217 sq m (1.5 acres) and has 128 homes registered in one tower, with an estimated project cost of ₹29.3 crore. Its density of 83.3 homes per acre is the 63rd percentile among 1118 Bengaluru East projects (median 75.7). Its declared completion date of 19 June 2020 has passed; no occupancy certificate is on record.
Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
What you can verify free on this page
The official K-RERA filing record, in plain English
Registration and delivery
SS Snowdrop is registered with K-RERA as PRM/KA/RERA/1251/446/PR/180728/001963, and the promoter has declared completion for 19 Jun 2020.
19 Jun 2020
declared completion
Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.
Source · K-RERA project register · read 10 Sep 2026
Project scale
SS Snowdrop spans 6,217 sq m (1.54 acres), comprises 1 tower, registers 128 units, and is declared to cost ₹29.34 cr.
₹29.34 cr
declared project cost
1.54acres
6,217 sq m
128units
on the registration
2.25FAR
sanctioned
Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.
Source · K-RERA project registration · read 10 Sep 2026
Promoter record
Builders is the promoter of record on 44 projects registered with K-RERA, 16 of which are past their declared completion dates on the register.
44projects
registered with K-RERA
16past declared date
on the register
73%
average construction reported
Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.
Source · K-RERA register, all projects · read 10 Sep 2026
🔒 What I’d do as a buyer here · Drawings Report
The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 128 | Total inventory registered with K-RERA. |
| Registered land area | 6,217 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.25 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 1 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 128 total (0 open) — 1.00 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 20-06-2018 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| SS SNOWDROP | 4 | 128 | 128 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 128 official flat/unit rows, matching the 128 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2BHK | 104 | 724.4-795.1 sqft | 4.0-526.9 sqft | 104 |
| 3BHK | 24 | 956.9-1,030.2 sqft | 4.0 sqft | 24 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| SS SNOWDROP | 128 | 724.4-1,030.2 sqft | 4.0-526.9 sqft | 128 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| A101 | SS SNOWDROP | 1 | 3BHK | 998.5 sqft | 4.0 sqft | 1 |
| A102 | SS SNOWDROP | 1 | 2BHK | 754.1 sqft | 4.0 sqft | 1 |
| A103 | SS SNOWDROP | 1 | 2BHK | 754.1 sqft | 4.0 sqft | 1 |
| A104 | SS SNOWDROP | 1 | 2BHK | 754.1 sqft | 4.0 sqft | 1 |
| A105 | SS SNOWDROP | 1 | 2BHK | 754.1 sqft | 4.0 sqft | 1 |
| A106 | SS SNOWDROP | 1 | 2BHK | 773.9 sqft | 4.0 sqft | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Which flat to ask for · Drawings Report
The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.
No litigation declared on this project's K-RERA filing.
⚠ 21 of 35 compliance document slots are filed as under process / not yet usable: Commencement Certificate, Proforma For Sale Deed, Performa of Allotment Letter, Approval/NOC under Sec 14 of the KTCP Act, Utilisation certificate and more.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 19 Jun 2020, extended (Covid Extension) to 19 Mar 2021 — both dates have passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (58 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| MUTHUVEL vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Earlier completion of project with quality and completion and hand over | AUTHORITY | 23/12/2024 |
| Santosh Kumar vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of the project with quality work and require compensation for all the harrasment given by builder in this 2 year | AUTHORITY | 23/12/2024 |
| KOLLI KALYANA CHAKRAVARTHY vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of the project with quality work and compensation for the delayed period | AUTHORITY | 23/12/2024 |
| Subba Rao Repalle vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of the project quality, issuance of OC, A-Katha Certificate(Katha Transfer), EB Name transfer and compensation till the handover of society | AUTHORITY | 23/12/2024 |
| KRISHNA KUMAR PRASAD vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of project with quality, issuance of OC, A-Khata certificate(Khata transfer) , EB bill name transfer and compensation till the handover of society | AUTHORITY | 23/12/2024 |
| Suma Reddy Battu vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Need immediate project completion as promised and we are not having mental piece | AUTHORITY | 23/12/2024 |
| Tandra Vinay Kumar vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of project with quality, issuance of OC, A-Khata Certificate(Khata Transfer), EB Bill name transfer and compensation till the handover of society. | AUTHORITY | 23/12/2024 |
| Mohammad Fathima Begum vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of the project with quality work, issuance of OC, A-Khatha transfer, EB bill name transfer | AUTHORITY | 23/12/2024 |
| Aisha Firdose vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of project with quality work, issue of A-katha, EB bill name transfer, Occupation Certificate | AUTHORITY | 23/12/2024 |
| Ashwin V vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of the project with quality and compensation till handover. | AUTHORITY | 23/12/2024 |
| Purushotham Sathwik Vavilala vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of project with quality, issuance of OC, A Katha Certificate (Katha Transfer), EB Bill name transfer and compensation till handover of project. | AUTHORITY | 23/12/2024 |
| ANIMESH KUMAR SINGH vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of the project with quality work and compensation for the delayed period | AUTHORITY | 23/12/2024 |
| Syed Hadi Mehmood vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Early completion of the project with quality and compensation till handover. | AUTHORITY | 23/12/2024 |
| Goripati Hari Srinivas vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of the project with quality and compliance to RERA rules. Issuance of OC, A-khata certificate (Khata transfer), EB bill name transfer and compensation till the handover of society | AUTHORITY | 23/12/2024 |
| Vyshnavi Vankadari vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of project with quality, issuance of OC, A-Khata certificate(Khata transfer) , EB bill name transfer and compensation till the handover of society. | AUTHORITY | 23/12/2024 |
| Raghavendra Keshmoni vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Immediate completion of project with quality, issuance of OC, A-Khata Certificate(Khata transfer), EB bill name transfer & compensation till the handover of society | AUTHORITY | 23/12/2024 |
| Undavalli Naga Durga Sandeep vs M/S S.S. BUILDERS AND DEVELOPERS & OTHERS | Need immediate project completion as promised | AUTHORITY | 23/12/2024 |
| PRABHASH TIWARI vs SS SNOWDROPS | Completion of project at the earliest with quality and compensation till handover | AUTHORITY | 23/07/2024 |
| MANIVANNAN vs S S SNOWDROPS | Immediate completion of project with quality , issuance of OC, A- Khata transfer certificate, BESCOM connection with name transfer completed and compensation till handover of soceity. | AUTHORITY | 23/07/2024 |
| KOLLI KALYANA CHAKRAVARTY vs SS SNOWDROP | Compensation and legal expenses for the stalled/delayed project from the date of sale deed. | AUTHORITY | 23/07/2024 |
| MOHAMMAD FATHIMA BEGUM vs SS SNOWDROP | Compensation and legal expenses for the stalled/delayed projected from the date of Sale Deed | AUTHORITY | 23/07/2024 |
| AISHA FIRDOSE vs SS SNOWDROPS | Compensation and legal expenses for the stalled/delayed projected from the date of Sale Deed | AUTHORITY | 23/07/2024 |
| SYED HADI MEHMOOD vs SS SNOWDROP | Compensation and legal expenses for the stalled/delayed projected from the date of Sale Deed | AUTHORITY | 23/07/2024 |
| VYSHNAVI VANKADARI vs SS SNOWDROPS | Rs.50000 for breach of terms of compromise petition dated 12/11/2022 , Compensation at 18% on total sale consideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of sale | AUTHORITY | 23/07/2024 |
| TANDRA VINAY KUMAR vs SS SNOWDROP | Compensation and legal expenses for the stalled/delayed projected from the date of Sale Deed | AUTHORITY | 23/07/2024 |
| SUBBA RAO REPALLE vs SS SNOWDROP | Compensation and legal expenses for the stalled/delayed projected from the date of Sale Deed | AUTHORITY | 23/07/2024 |
| MUTHUVEL vs SS SNOWDROP | Compensation and legal expenses for the stalled/delayed projected from the date of sale Deed | AUTHORITY | 23/07/2024 |
| ANIMESH KUMAR SINGH vs SS SNOWDROP | Compensation at 18% on total saleconsideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of sale. | AUTHORITY | 23/07/2024 |
| KRISHNA KUMAR PRASAD vs S S SNOWDROP | Compensation at 18% on total sale consideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of sale | AUTHORITY | 23/07/2024 |
| PURUSHOTHAM SATHWIK VAVILAL vs SS SNOWDROP | Compensation at 18% on total sale consideration amount(P.A.) & Legal expenses for the stalled/Delayed project from date of sale | AUTHORITY | 23/07/2024 |
| HARI DURGAPRASAD vs M/S.S.S.BUILDERS AND DEVELOPERS | Completion of project to the earliest with quality and compensation till date of completion for the loss due to in complete amenities. | AUTHORITY | 12/11/2022 |
| SHAKTI PRASANNA PATTNAYAK vs M/S.S.S.BUILDERS AND DEVELOPERS | Early completion of the project with quality and compensation till handover. | AUTHORITY | 12/11/2022 |
| SHARANA KUMAR vs M/S.S.S.BUILDERS AND DEVELOPERS | Compensation | AUTHORITY | 12/11/2022 |
| SAMARTH SAXENA vs M/S.S.S.BUILDERS AND DEVELOPERS | Completion of all amenities as promised by builder at the earliest. | AUTHORITY | 12/11/2022 |
| SANDEEP REEDY MUKKAMALLA vs M/S.S.S.BUILDERS AND DEVELOPERS | I want complete all pending work in ss snowdrop apartment . | AUTHORITY | 12/11/2022 |
| LOKESH AYYALA vs M/S.S.S.BUILDERS AND DEVELOPERS | Completion of amenities, Rework of where poorly finished work for building and compensation for delay if possible | AUTHORITY | 12/11/2022 |
| SATYAPRIYA TARANIA vs M/S.S.S.BUILDERS AND DEVELOPERS | Early completion of the project with Quality and compensation till the handover. | AUTHORITY | 12/11/2022 |
| MATHIVANAN ELANGOVAN vs M/S.S.S.BUILDERS AND DEVELOPERS | Complete the Project without further delay and need status of the Completion and Quality of work also compensation till the handover and for the delayed time period. | AUTHORITY | 12/11/2022 |
| SUJIT RAI vs M/S.S.S.BUILDERS AND DEVELOPERS | Yes,Amenities and permanent power supply require. | AUTHORITY | 12/11/2022 |
| BIKASH KUMAR vs M/S.S.S.BUILDERS AND DEVELOPERS | Complete the Project and Arrange compensation for our losses | AUTHORITY | 12/11/2022 |
| P VIJAYALAXMI vs M/S.S.S.BUILDERS AND DEVELOPERS | Early completion of the project with quality and compensation till the handover date | AUTHORITY | 12/11/2022 |
| GURUPRASAD UDDANDAM vs M/S.S.S.BUILDERS AND DEVELOPERS | Please do the needful as we are not able to catch the builder and they are not under standing our suffering and Enjoying with our hard earned money. Requesting RERA please do proper action on builder. | AUTHORITY | 12/11/2022 |
| SUBHASMIT PRUSTY vs M/S.S.S.BUILDERS AND DEVELOPERS | Expedite the development of the Apartment with all its amenities. Do not give any more relaxation to builder as already 9 months relaxation has been provided. | AUTHORITY | 12/11/2022 |
| SUJEET KUMAR vs M/S.S.S.BUILDERS AND DEVELOPERS | RERA should ask Builder to complete the project as soon as possible else builder should compensate for lack of amenities which was promised at the time of buying. | AUTHORITY | 12/11/2022 |
| SHYAM SEKHAR vs M/S.S.S.BUILDERS AND DEVELOPERS | I am expecting to finish the project with all eminities | AUTHORITY | 12/11/2022 |
| MADUPURI THIRUMALA RAGHAVENDRA PRASAD vs M/S.S.S.BUILDERS AND DEVELOPERS | Request to take actions for quick finish the project | AUTHORITY | 12/11/2022 |
| VISHAL ANAND vs M/S.S.S.BUILDERS AND DEVELOPERS | We need proper completion date with Quality material and compensation for delay. | AUTHORITY | 12/11/2022 |
| SOWMITRI vs M/S.S.S.BUILDERS AND DEVELOPERS | All Pending work as promised has to be completed with in 2months from now | AUTHORITY | 12/11/2022 |
| KOLA AVINASH vs M/S.S.S.BUILDERS AND DEVELOPERS | request to take actions for quick finish the project | AUTHORITY | 12/11/2022 |
| BRIJESH KUMAR BEHERA vs M/S.S.S.BUILDERS AND DEVELOPERS | EARLY COMPLETION WITH GOOD QUALITY WORK | AUTHORITY | 12/11/2022 |
| NESAMANI vs M/S.S.S.BUILDERS AND DEVELOPERS | We want all the Builder promised things needs to be ready at the earliest. | AUTHORITY | 12/11/2022 |
| Y KRISHNA KISHORE vs M/S.S.S.BUILDERS AND DEVELOPERS | sir, I request you to take action on builder ,to make sure he builds all the facilities, which he promised in a shorter time, Thanks sir. | AUTHORITY | 12/11/2022 |
| POOLLA SESHA VENKATA RAMESH vs M/S.S.S.BUILDERS AND DEVELOPERS | Project completion with all amenities as per contractual obligation and compensation sought for poor quality of work | AUTHORITY | 12/11/2022 |
| JITENDRA KUMAR SAMANTARAY vs M/S.S.S.BUILDERS AND DEVELOPERS | Early completion of the project with quality and compensation till handover. | AUTHORITY | 12/11/2022 |
| SHAMBHU NATH YADAV vs M/S.S.S.BUILDERS AND DEVELOPERS | Completion of the Complaints to the earliest and due compensation for the delay caused. | AUTHORITY | 12/11/2022 |
| M S V A PRADEEP vs M/S.S.S.BUILDERS AND DEVELOPERS | Immediate Completion of the project with quality, issuance of OC, A-Khata Certificate(Khata Transfer), EB Bill Name Transfer and Compensation till the handover of society | AUTHORITY | 12/11/2022 |
| ARAVIND VENKATAKRISHNAN vs M/S.S.S.BUILDERS AND DEVELOPERS | Kindly penalize builders and get the project completed as soon as possible | AUTHORITY | 12/11/2022 |
| MALAY KUMAR K vs M/S.S.S.BUILDERS AND DEVELOPERS | Basic amenities are required | AUTHORITY | 12/11/2022 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (45 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/210622/0008025 22-06-2021 | No Amenities provided and quality of construction is bad | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008028 23-06-2021 | Regarding completion of promised amenities by the builder | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008030 23-06-2021 | Pending All Amenities | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008031 23-06-2021 | Gross Negligence by the Builder for completing the project with all the amenities. | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008047 23-06-2021 | Pending All Basic Amenities | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008048 23-06-2021 | Pending All Amenities | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008049 23-06-2021 | Amenities are pending. The main thing is bescom connection not completed | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
| CMP/210623/0008050 23-06-2021 | Pending All amenities | SS SNOWDROP | DISPOSED AUTHORITY FULLBENCH |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Builders has 44 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Builders And”) (average reported construction progress 73%). 16 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹22.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: Axis Bank Seegehalli. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
The nearest major job hub is ~4 km away — a manageable everyday commute to a major job hub.
| Landmark | Straight-line |
|---|---|
| Whitefield IT hub | 4 km |
| Bellandur–Marathahalli belt | 10 km |
| Outer Ring Road / Manyata | 14 km |
| MG Road / city centre | 16 km |
| Electronic City | 20 km |
| Kempegowda Int'l Airport | 22 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
The approved drawings
Everything above is on this page already, free, from the government record. The drawings are different: the 7 approved sheets are the same drawings the builder filed to get SS SNOWDROP approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.
What that turns up — from other projects’ filings:
ATS Knightsbridge · Sector 124, Noida
You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.
Oberoi Elysian · Goregaon East, Mumbai
“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.
Godrej Aristocrat · Sector 49, Gurugram
Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.
Prestige Camden Gardens · Thanisandra, Bengaluru
The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.
Want this project read from its filed drawings?
This page is the free K-RERA filing summary. For SS SNOWDROP, one reading of it goes further. Which flat should I ask for? — what the approved drawings and filed papers say about the flats, the parking, the approvals, and what to get in writing before you sign. That is the Drawings Report. See a real one first:
Drawings Report sample: Prestige Camden Gardens → · browse all sample reports →
Payment is confirmed automatically. The Drawings Report is 1 working day. We email the link, so you can close the tab.
Drawings Report · ₹4,999
Every drawing on file, read — which flat to ask for · 1 working day
Not useful to your decision? Full refund — no questions asked.
Paying from outside India? Pay $59 (Drawings Report) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.
Built by Builders And.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.