RERA Property Intelligence Report · Preview
Commune Properties India · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/171015/000813
The Drawings Report · ₹4,999
We read all 4 approved drawings and 20 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.
One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.
Get it for this project →Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.
Free before you decide: the 14 things to get in writing before you book
Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.
Send the checklist to the family group Read it here →Commune occupies 21,650 sq m (5.3 acres) and has 384 registered homes across 5 towers, with a unit mix of 384 × 1, 2 & 3 BHK. At 71.8 homes per acre it sits at the 45th percentile of 470 Anekal projects on this register (median 75.8). Its declared completion date of 31 December 2019 has passed; no occupancy certificate is on record.
Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
What you can verify free on this page
The official K-RERA filing record, in plain English
Registration and delivery
Commune is registered with K-RERA as PRM/KA/RERA/1251/308/PR/171015/000813, and the promoter has declared completion for 31 Dec 2019.
31 Dec 2019
declared completion
Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.
Source · K-RERA project register · read 10 Sep 2026
Project scale
Commune spans 21,650 sq m (5.35 acres), comprises 5 towers, registers 384 units, and is declared to cost ₹90.7 cr.
₹90.7 cr
declared project cost
5.35acres
21,650 sq m
384units
on the registration
2.0FAR
sanctioned
Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.
Source · K-RERA project registration · read 10 Sep 2026
🔒 What I’d do as a buyer here · Drawings Report
The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 384 | Total inventory registered with K-RERA. |
| Official carpet area | 28,134 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 21,650 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 5 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 384 total (17 open) — 1.00 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 10-10-2013 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| 1, 2 & 3 BHK | 384 | 100% | 28,134 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| Tower-1 | 9 | 72 | 72 | - |
| Tower 2 | 13 | 104 | 104 | - |
| Tower 3 | 13 | 104 | 104 | - |
| Tower 4 | 13 | 52 | 52 | - |
| Tower 5 | 13 | 52 | 52 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 384 official flat/unit rows, matching the 384 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2BHK | 208 | 67.4-69.9 sqm | 34.8-35.2 sqm | 208 |
| 3BHK | 104 | 103.8-107.6 sqm | 52.8-53.8 sqm | 104 |
| 1BHK | 72 | 44.6-45.0 sqm | 25.9 sqm | 72 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| Tower 2 | 104 | 67.4-69.7 sqm | 34.8-35.2 sqm | 104 |
| Tower 3 | 104 | 67.7-69.9 sqm | 34.8-35.2 sqm | 104 |
| Tower-1 | 72 | 44.6-45.0 sqm | 25.9 sqm | 72 |
| Tower 4 | 52 | 103.8-105.0 sqm | 52.8 sqm | 52 |
| Tower 5 | 52 | 107.0-107.6 sqm | 53.8 sqm | 52 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| 10101 | Tower-1 | 1 | 1BHK | 44.6 sqm | 25.9 sqm | 1 |
| 10102 | Tower-1 | 1 | 1BHK | 44.6 sqm | 25.9 sqm | 1 |
| 10103 | Tower-1 | 1 | 1BHK | 44.9 sqm | 25.9 sqm | 1 |
| 10104 | Tower-1 | 1 | 1BHK | 44.9 sqm | 25.9 sqm | 1 |
| 10105 | Tower-1 | 1 | 1BHK | 44.6 sqm | 25.9 sqm | 1 |
| 10106 | Tower-1 | 1 | 1BHK | 44.6 sqm | 25.9 sqm | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Which flat to ask for · Drawings Report
The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.
No litigation declared on this project's K-RERA filing.
All 20 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Dec 2019 — which has passed with no OC on file.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (34 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| RAKESH CHARAN C vs Commune Properties India Pvt Ltd | Direction to execute Sale Deed & compensation | AUTHORITY | 30/06/2025 |
| Jaya Padmanabhan vs Commune Properties India Pvt Ltd | Completion and compensation | AUTHORITY | 30/06/2025 |
| Sudheer Madathil vs Commune Properties India Pvt Ltd | Promoters to pay delay compensation | AUTHORITY | 30/06/2025 |
| Aniruddha Aditya vs Commune Properties India Pvt Ltd | delay compensation | AUTHORITY | 30/06/2025 |
| Nibu Jacob George vs Commune Properties India Pvt Ltd | a. To direct the Respondent/Promoters to pay delay compensation , To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat | AUTHORITY | 30/06/2025 |
| Rajesh Valeri Sivasankaran Nair vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, c. To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the Complainants | AUTHORITY | 30/06/2025 |
| Rajmohan Rao Udiawar vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation , To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat | AUTHORITY | 30/06/2025 |
| Havard Valerian DSilva vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, d. To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat | AUTHORITY | 30/06/2025 |
| Hadlee Raymond DSilva vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoters to reimburse the Pre-EMI , To direct the Respondent/Promoter to initiate the registration process an | AUTHORITY | 30/06/2025 |
| Biny Balan vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the Complainants | AUTHORITY | 30/06/2025 |
| Sandeep Kandyan Thundyan vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the Complainants | AUTHORITY | 30/06/2025 |
| Pajimannu Vijayalakshmana Mundur vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the Complainants | AUTHORITY | 30/06/2025 |
| Sajesh Nittoor vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation along with future interest, To direct the Respondent/Promoters to pay compensation for loss and/or damages and/ or mental agony caused, | AUTHORITY | 30/06/2025 |
| Nitin Gaikwad vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the Complainants without any furt | AUTHORITY | 30/06/2025 |
| Ivan Robert Dias vs Commune Properties India Pvt Ltd | To direct the Respondent/Promoters to pay delay compensation , To direct the Respondent/Promoters to reimburse the Pre-EMI paid by the Complainant, | AUTHORITY | 30/06/2025 |
| Rahul Sharma vs Commune Properties India Pvt Ltd | Refund and Compensation | AUTHORITY | 30/06/2025 |
| Saravanan E vs Commune Properties India Pvt Ltd | Delay compensation | AUTHORITY | 30/06/2025 |
| Shraddha Vijaykumar Maske vs Commune Properties India Pvt Ltd | Delay compensation | AUTHORITY | 30/06/2025 |
| Shobhit Verma vs Commune Properties India Pvt Ltd | Delay compensation | AUTHORITY | 30/06/2025 |
| George Thomas P C vs Commune Properties India Pvt Ltd | Delay Compensation | AUTHORITY | 30/06/2025 |
| Johar Das vs Commune Properties India Pvt Ltd | 1. Finishing of Apartment. 2. Reimbursement of Rs. 350000. 3. Refund of illegal fee. 4. Penalty u/s 62 of RERA Act. | AUTHORITY | 30/06/2025 |
| SHWETA SETHI vs COMMUNE PROPERTIES INDIA PVT. LTD., | I want builder to return the maount I have invested =22,36,635 paid to builder till date + 7.5 lacs interest on bank loan=30 Lacs to be returned by builder | AUTHORITY | 28/11/2024 |
| L S MUKUND vs COMMUNE PROPERTIES INDIA PRIVATE LIMITED | (1) Refund of sale consideration amount of Rs.15,30,189/- with interest, (2) Rs.3,33,638/- as interest paid on the loan availed, (3) Rs.3,30,162/- as outstanding principal-loan amount & legal fee | AUTHORITY | 25/08/2022 |
| Swetha Sethi vs Commune Properties India Pvt Ltd | Complaint for delay compensation | AUTHORITY | 23/06/2025 |
| Anandgouda Patil vs Commune Properties India Pvt Ltd | Delay Compensation | AUTHORITY | 22/04/2026 |
| Krishnakumari Ramesh vs Commune Properties India Pvt Ltd | Compensation for the delay | AUTHORITY | 22/04/2026 |
| Sushil Tejas Soans vs Commune Properties India Pvt Ltd | Delay period interest | AUTHORITY | 22/04/2026 |
| Venkateswaran Taruvai Guruswamy vs Commune Properties India Pvt Ltd | Interest on delay period | AUTHORITY | 22/04/2026 |
| Channabasappa Kolar vs Commune Properties India Pvt Ltd | Interest on delay period | AUTHORITY | 22/04/2026 |
| Sachin Utage vs Commune Properties India Pvt Ltd | interest on delay period | AUTHORITY | 22/04/2026 |
| Sanjay Sharma vs Commune Properties India Pvt Ltd | Interest on delay period | AUTHORITY | 22/04/2026 |
| Lionel Andrade vs Commune Properties India Pvt Ltd | interest on delay period | AUTHORITY | 22/04/2026 |
| Commune Buyers Welfare Association vs Commune Properties Indisa Pvt Ltd., | Initiate actions against the promoter for creating Illegal mortgage and grant such other relief as prayed for | AUTHORITY | 17/05/2024 |
| COMMUNE ONE OWNERS COOPERATIVE SOCIETY LIMITED vs Commune Properties Indisa Pvt Ltd., | facilitate takeover of the project by recovering the missused fund by the promoter | AUTHORITY | 17/05/2024 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (26 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/190426/0002780 26-04-2019 | Compensation for the Delay in completing the project even after collecting 95 Percent of sale consideration amounts | Commune | DISPOSED AO |
| CMP/190824/0003999 24-08-2019 | BREACH OF AGREEMENT | Commune | DISPOSED AO |
| CMP/191106/0004636 06-11-2019 | Booking advance given to promoter but unit not alloted by promoter | Commune | DISPOSED AO |
| CMP/200616/0006041 16-06-2020 | Execution of Sale Deed and Delivey of possesio | Commune | DISPOSED AUTHORITY FULLBENCH |
| CMP/210125/0007497 25-01-2021 | Want double compensation, Interest on amount paid, expeditious completion of project with all necessary statutory approvals. | Commune | DISPOSED AUTHORITY FULLBENCH |
| CMP/210223/0007613 23-02-2021 | Illegal Mortgage, Unfair Trade Practices, Enormous Delay in Completion & Continuous Breach of Agreement Terms | Commune | DISPOSED AUTHORITY FULLBENCH |
| CMP/210628/0008067 28-06-2021 | DELAYED HANDOVER, WITHDRAWAL FROM PROJECT, AND REFUND | Commune | DISPOSED AUTHORITY BENCH4 |
| CMP/210830/0008282 30-08-2021 | To direct the Respondent/Promoters to pay delay compensation | Commune | DISPOSED AUTHORITY FULLBENCH |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
K-RERA names 1 project professional/vendor row across Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Contractor | Bhuvana Infra Projects Pvt. Ltd. | - | 2011 | 19th Main, Koramangala 6th Block |
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹23.6 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: YES BANK Avenue Road (IFSC YESB0000658, a/c …0300). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
The nearest major job hub is ~16 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.
| Landmark | Straight-line |
|---|---|
| Electronic City | 16 km |
| Bellandur–Marathahalli belt | 25 km |
| Whitefield IT hub | 30 km |
| MG Road / city centre | 31 km |
| Outer Ring Road / Manyata | 38 km |
| Kempegowda Int'l Airport | 54 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
The approved drawings
Everything above is on this page already, free, from the government record. The drawings are different: the 4 approved sheets are the same drawings the builder filed to get Commune approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.
What that turns up — from other projects’ filings:
ATS Knightsbridge · Sector 124, Noida
You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.
Oberoi Elysian · Goregaon East, Mumbai
“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.
Godrej Aristocrat · Sector 49, Gurugram
Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.
Prestige Camden Gardens · Thanisandra, Bengaluru
The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.
Want this project read from its filed drawings?
This page is the free K-RERA filing summary. For Commune, one reading of it goes further. Which flat should I ask for? — what the approved drawings and filed papers say about the flats, the parking, the approvals, and what to get in writing before you sign. That is the Drawings Report. See a real one first:
Drawings Report sample: Prestige Camden Gardens → · browse all sample reports →
Payment is confirmed automatically. The Drawings Report is 1 working day. We email the link, so you can close the tab.
Drawings Report · ₹4,999
Every drawing on file, read — which flat to ask for · 1 working day
Not useful to your decision? Full refund — no questions asked.
Paying from outside India? Pay $59 (Drawings Report) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.
Built by Commune Properties.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.
Own a unit in Commune?
Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.
Last checked against the RERA register: 10 Sep 2026