RERA Property Intelligence Report · Preview

Commune

Commune Properties India · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/171015/000813

The Drawings Report · ₹4,999

Which flat should you ask for in Commune?

We read all 4 approved drawings and 20 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

Commune occupies 21,650 sq m (5.3 acres) and has 384 registered homes across 5 towers, with a unit mix of 384 × 1, 2 & 3 BHK. At 71.8 homes per acre it sits at the 45th percentile of 470 Anekal projects on this register (median 75.8). Its declared completion date of 31 December 2019 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2019
Land area21,650 sq m (5.3 acres)
Homes registered384
Towers5
Unit mix384 × 1, 2 & 3 BHK

In context

Density71.8 homes per acre
Density in context45th percentile of 470 Anekal projects (median 75.8)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Commune is registered with K-RERA as PRM/KA/RERA/1251/308/PR/171015/000813, and the promoter has declared completion for 31 Dec 2019.

31 Dec 2019

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Commune spans 21,650 sq m (5.35 acres), comprises 5 towers, registers 384 units, and is declared to cost ₹90.7 cr.

₹90.7 cr

declared project cost

5.35acres

21,650 sq m

384units

on the registration

2.0FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

384
Registered units
₹90.7 Cr
Est. construction cost
Units profiled
24
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units384Total inventory registered with K-RERA.
Official carpet area28,134 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area21,650 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings5Official tower/wing count in the K-RERA detail page.
Parking disclosed384 total (17 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date10-10-2013

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
1, 2 & 3 BHK384100%28,134 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower-197272-
Tower 213104104-
Tower 313104104-
Tower 4135252-
Tower 5135252-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 384 official flat/unit rows, matching the 384 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK20867.4-69.9 sqm34.8-35.2 sqm208
3BHK104103.8-107.6 sqm52.8-53.8 sqm104
1BHK7244.6-45.0 sqm25.9 sqm72

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower 210467.4-69.7 sqm34.8-35.2 sqm104
Tower 310467.7-69.9 sqm34.8-35.2 sqm104
Tower-17244.6-45.0 sqm25.9 sqm72
Tower 452103.8-105.0 sqm52.8 sqm52
Tower 552107.0-107.6 sqm53.8 sqm52
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
10101Tower-111BHK44.6 sqm25.9 sqm1
10102Tower-111BHK44.6 sqm25.9 sqm1
10103Tower-111BHK44.9 sqm25.9 sqm1
10104Tower-111BHK44.9 sqm25.9 sqm1
10105Tower-111BHK44.6 sqm25.9 sqm1
10106Tower-111BHK44.6 sqm25.9 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~798 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 384 homes across 5 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 384 parking spaces for 384 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~38 sqm per home; across all 384 homes that is ~68% of the plot — the undivided shares sum to less than the plot area.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 20 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2019 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (34 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
RAKESH CHARAN C vs Commune Properties India Pvt LtdDirection to execute Sale Deed & compensationAUTHORITY30/06/2025
Jaya Padmanabhan vs Commune Properties India Pvt LtdCompletion and compensationAUTHORITY30/06/2025
Sudheer Madathil vs Commune Properties India Pvt LtdPromoters to pay delay compensationAUTHORITY30/06/2025
Aniruddha Aditya vs Commune Properties India Pvt Ltddelay compensationAUTHORITY30/06/2025
Nibu Jacob George vs Commune Properties India Pvt Ltda. To direct the Respondent/Promoters to pay delay compensation , To direct the Respondent/Promoter to initiate the registration process and hand-over of the flatAUTHORITY30/06/2025
Rajesh Valeri Sivasankaran Nair vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, c. To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the ComplainantsAUTHORITY30/06/2025
Rajmohan Rao Udiawar vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation , To direct the Respondent/Promoter to initiate the registration process and hand-over of the flatAUTHORITY30/06/2025
Havard Valerian DSilva vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, d. To direct the Respondent/Promoter to initiate the registration process and hand-over of the flatAUTHORITY30/06/2025
Hadlee Raymond DSilva vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoters to reimburse the Pre-EMI , To direct the Respondent/Promoter to initiate the registration process anAUTHORITY30/06/2025
Biny Balan vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the ComplainantsAUTHORITY30/06/2025
Sandeep Kandyan Thundyan vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the ComplainantsAUTHORITY30/06/2025
Pajimannu Vijayalakshmana Mundur vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the ComplainantsAUTHORITY30/06/2025
Sajesh Nittoor vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation along with future interest, To direct the Respondent/Promoters to pay compensation for loss and/or damages and/ or mental agony caused,AUTHORITY30/06/2025
Nitin Gaikwad vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation, To direct the Respondent/Promoter to initiate the registration process and hand-over of the flat to the Complainants without any furtAUTHORITY30/06/2025
Ivan Robert Dias vs Commune Properties India Pvt LtdTo direct the Respondent/Promoters to pay delay compensation , To direct the Respondent/Promoters to reimburse the Pre-EMI paid by the Complainant,AUTHORITY30/06/2025
Rahul Sharma vs Commune Properties India Pvt LtdRefund and CompensationAUTHORITY30/06/2025
Saravanan E vs Commune Properties India Pvt LtdDelay compensationAUTHORITY30/06/2025
Shraddha Vijaykumar Maske vs Commune Properties India Pvt LtdDelay compensationAUTHORITY30/06/2025
Shobhit Verma vs Commune Properties India Pvt LtdDelay compensationAUTHORITY30/06/2025
George Thomas P C vs Commune Properties India Pvt LtdDelay CompensationAUTHORITY30/06/2025
Johar Das vs Commune Properties India Pvt Ltd1. Finishing of Apartment. 2. Reimbursement of Rs. 350000. 3. Refund of illegal fee. 4. Penalty u/s 62 of RERA Act.AUTHORITY30/06/2025
SHWETA SETHI vs COMMUNE PROPERTIES INDIA PVT. LTD.,I want builder to return the maount I have invested =22,36,635 paid to builder till date + 7.5 lacs interest on bank loan=30 Lacs to be returned by builderAUTHORITY28/11/2024
L S MUKUND vs COMMUNE PROPERTIES INDIA PRIVATE LIMITED(1) Refund of sale consideration amount of Rs.15,30,189/- with interest, (2) Rs.3,33,638/- as interest paid on the loan availed, (3) Rs.3,30,162/- as outstanding principal-loan amount & legal feeAUTHORITY25/08/2022
Swetha Sethi vs Commune Properties India Pvt LtdComplaint for delay compensationAUTHORITY23/06/2025
Anandgouda Patil vs Commune Properties India Pvt LtdDelay CompensationAUTHORITY22/04/2026
Krishnakumari Ramesh vs Commune Properties India Pvt LtdCompensation for the delayAUTHORITY22/04/2026
Sushil Tejas Soans vs Commune Properties India Pvt LtdDelay period interestAUTHORITY22/04/2026
Venkateswaran Taruvai Guruswamy vs Commune Properties India Pvt LtdInterest on delay periodAUTHORITY22/04/2026
Channabasappa Kolar vs Commune Properties India Pvt LtdInterest on delay periodAUTHORITY22/04/2026
Sachin Utage vs Commune Properties India Pvt Ltdinterest on delay periodAUTHORITY22/04/2026
Sanjay Sharma vs Commune Properties India Pvt LtdInterest on delay periodAUTHORITY22/04/2026
Lionel Andrade vs Commune Properties India Pvt Ltdinterest on delay periodAUTHORITY22/04/2026
Commune Buyers Welfare Association vs Commune Properties Indisa Pvt Ltd.,Initiate actions against the promoter for creating Illegal mortgage and grant such other relief as prayed forAUTHORITY17/05/2024
COMMUNE ONE OWNERS COOPERATIVE SOCIETY LIMITED vs Commune Properties Indisa Pvt Ltd.,facilitate takeover of the project by recovering the missused fund by the promoterAUTHORITY17/05/2024

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (26 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190426/0002780
26-04-2019
Compensation for the Delay in completing the project even after collecting 95 Percent of sale consideration amountsCommuneDISPOSED AO
CMP/190824/0003999
24-08-2019
BREACH OF AGREEMENTCommuneDISPOSED AO
CMP/191106/0004636
06-11-2019
Booking advance given to promoter but unit not alloted by promoterCommuneDISPOSED AO
CMP/200616/0006041
16-06-2020
Execution of Sale Deed and Delivey of possesioCommuneDISPOSED AUTHORITY FULLBENCH
CMP/210125/0007497
25-01-2021
Want double compensation, Interest on amount paid, expeditious completion of project with all necessary statutory approvals.CommuneDISPOSED AUTHORITY FULLBENCH
CMP/210223/0007613
23-02-2021
Illegal Mortgage, Unfair Trade Practices, Enormous Delay in Completion & Continuous Breach of Agreement TermsCommuneDISPOSED AUTHORITY FULLBENCH
CMP/210628/0008067
28-06-2021
DELAYED HANDOVER, WITHDRAWAL FROM PROJECT, AND REFUNDCommuneDISPOSED AUTHORITY BENCH4
CMP/210830/0008282
30-08-2021
To direct the Respondent/Promoters to pay delay compensationCommuneDISPOSED AUTHORITY FULLBENCH

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 1 project professional/vendor row across Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ContractorBhuvana Infra Projects Pvt. Ltd.-201119th Main, Koramangala 6th Block

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹23.6 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: YES BANK Avenue Road (IFSC YESB0000658, a/c …0300). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~16 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Electronic City16 km
Bellandur–Marathahalli belt25 km
Whitefield IT hub30 km
MG Road / city centre31 km
Outer Ring Road / Manyata38 km
Kempegowda Int'l Airport54 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

4approved drawings on file
20other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 4 approved sheets are the same drawings the builder filed to get Commune approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Commune Properties.
1 complaints on the K-RERA register against Commune Properties in Bangalore.

Other RERA-registered projects in Weaver Colony

Major developers building in Weaver Colony

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Commune?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026