DNR SPRINGLEAF

Bengaluru South · DNR CORPORATION

Project Review · example purchase

Spending a few crores on a home? ₹4,999 to check what you’re buying.

Check what the plans put beside your home, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.

From another project · Prestige Park Grove

Avoid bad decisions, only go for the best homes.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project Review sample ↗
Prestige Park Grove Project Review · first page
First page of the complete sample.
30 Dec 2022declared completionK-RERA registration · read 25 Oct 2026
59registered unitsK-RERA registration · read 25 Oct 2026

Free project details

Registration read 25 Oct 2026

Registered units and project size

3BHK 2T, 3BHK 3T, 4BHK 4T SERVANT RESIDENTIAL APARTMENT
59

Filed categories, unchanged · K-RERA registration · read 25 Oct 2026

The whole registration

0.7registered acres

85.9registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for DNR SPRINGLEAF

K-RERA · PRM/KA/RERA/1251/310/PR/190222/002446

Project facts and comparisons

On the register

Declared completion30 December 2022
Land area2,780 sq m (0.7 acres)
Homes registered59
Tower/wing entries2
Unit mix59 × 3BHK 2T, 3BHK 3T, 4BHK 4T SERVANT RESIDENTIAL APARTMENT

In context

Density85.9 homes per acre
Density in context64th percentile of 791 Bengaluru South projects (median 77.3)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units59Total inventory registered with K-RERA.
Official carpet area6,560 sqmTotal carpet area reported for the project.
Registered land area2,780 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI3.6Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries2Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)67Separate filed counts; these categories may overlap and are not added together.
Open-parking field3Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date25-12-2018

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3BHK 2T, 3BHK 3T, 4BHK 4T SERVANT RESIDENTIAL APARTMENT59100%6,560 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
TOWER A92533-
TOWER B93434-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 59 official flat/unit rows, matching the 59 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK42107.8-113.9 sqm0.0 sqm42
4BHK9142.8-144.3 sqm0.0 sqm18
2.5BHK879.8 sqm0.0 sqm8

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
TOWER B34107.8-113.9 sqm0.0 sqm34
TOWER A2579.8-144.3 sqm0.0 sqm34
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
101TOWER A14BHK142.8 sqm0.0 sqm2
102TOWER A12.5BHK79.8 sqm0.0 sqm1
103TOWER A13BHK107.8 sqm0.0 sqm1
201TOWER A24BHK144.2 sqm0.0 sqm2
202TOWER A22.5BHK79.8 sqm0.0 sqm1
203TOWER A23BHK109.6 sqm0.0 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

All 33 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 30 Dec 2022 — which has passed with no OC on file.

Approval documents

Electricity (BESCOM/ESCOM)Document listed: BESCOM
Water & sewage (BWSSB/KWSSB)Document listed: BWSSB
Fire NOCDocument listed: Fire Force Department
Pollution control (KSPCB)Document listed: KSPCB
Environmental clearanceNot identified in the document list
Airport Authority height clearanceDocument listed: Airport Authority of India

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectALAY DESIGN COLLABORATORS-199341 2 PROMENADE ROAD, FRAZER TOWN
ContractorIMPERIAL BUILD TECH PVT LTD-2013NO 2226A PNS COMPLEX 4TH MAIN ROAD, BANASHANKARI 2ND STAGE
Structural engineerSHRADHA DESIGNTECH PVT LTD---

Builder track record

RERA filing

Dnr Corporation has 6 other K-RERA-registered projects in our records (average reported construction progress 83%). 2 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹51.3 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: ICICI Bank CUNNINGHAM ROAD (IFSC ICIC0001421, a/c …0960). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest of the listed job hubs is about 6 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
MG Road / city centre6 km
Bellandur–Marathahalli belt6 km
Electronic City10 km
Outer Ring Road / Manyata12 km
Whitefield IT hub13 km
Kempegowda Int'l Airport31 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Dnr Corporation. View Dnr Corporation's full track record →
Dnr Corporation has 7 projects registered in Bangalore, 2 completed, 1 past RERA deadline.

Other projects by this builder in Bangalore

DNR Highline
Past deadline · 88% built · 76% sold
DNR Parklink Phase 1
Filing overdue · 75% built · 88% sold
DNR Parklink Phase 2
Filing overdue · 56% built · 64% sold
DNR Solace
Filing overdue · 97% built
DNR Solace
Filing overdue · 97% built

Other RERA-registered projects in Koramangala

Construction Of 336 Houses At Shanthinagar

Major developers building in Koramangala

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 25 Oct 2026. Document and inventory dates are shown in their sections.