RERA Property Intelligence Report · Preview

MAHAVEER SITARA

SITARA DEVELOPERS · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/171019/000671

The Drawings Report · ₹4,999

Which flat should you ask for in MAHAVEER SITARA?

We read all 5 approved drawings and 25 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

MAHAVEER SITARA covers 21,068 sq m (5.2 acres) with 4 towers and 217 homes registered, comprising 96 × 2,3,4 BHK apartments, at an estimated project cost of ₹117.8 crore. Its density of 41.7 homes per acre is the 13th percentile among 784 Bengaluru South projects (median 77.3). Its declared completion date of 30 April 2020 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion30 April 2020
Land area21,068 sq m (5.2 acres)
Homes registered217
Towers4
Unit mix96 × 2,3,4 BHK APARTMENTS

In context

Density41.7 homes per acre
Density in context13th percentile of 785 Bengaluru South projects (median 77.3)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Mahaveer Sitara is registered with K-RERA as PRM/KA/RERA/1251/310/PR/171019/000671, and the promoter has declared completion for 30 Apr 2020.

30 Apr 2020

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Mahaveer Sitara spans 21,068 sq m (5.21 acres), comprises 4 towers, registers 217 units, and is declared to cost ₹117.78 cr.

₹117.78 cr

declared project cost

5.21acres

21,068 sq m

217units

on the registration

2.2FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

217
Registered units
₹117.8 Cr
Est. construction cost
Units profiled
30
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units217Total inventory registered with K-RERA.
Official carpet area11,864 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area21,068 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.2Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings4Official tower/wing count in the K-RERA detail page.
Parking disclosed217 total (60 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date01-06-2016

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2,3,4 BHK APARTMENTS96100%11,864 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
BLOCK - A125454-
BLOCK - B125252-
BLOCK - C125252-
BLOCK - D125959-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 217 official flat/unit rows, matching the 217 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK158101.8-146.4 sqm55.0-76.5 sqm158
4BHK57140.9-163.4 sqm73.1-89.7 sqm114
2BHK284.3-85.4 sqm45.0-48.0 sqm2

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
BLOCK - D5984.3-155.3 sqm45.0-87.8 sqm111
BLOCK - A5485.4-163.4 sqm48.0-89.7 sqm59
BLOCK - B52101.8-107.2 sqm55.0-57.7 sqm52
BLOCK - C52113.9-117.1 sqm61.1-62.5 sqm52
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
G-01-1ABLOCK - A03BHK117.0 sqm62.5 sqm1
G-02-1ABLOCK - A03BHK117.0 sqm62.5 sqm1
G-03-1ABLOCK - A03BHK114.0 sqm61.1 sqm1
G-04-1ABLOCK - A03BHK113.9 sqm61.1 sqm1
G-05-1ABLOCK - A02BHK85.4 sqm48.0 sqm1
101-1ABLOCK - A13BHK117.0 sqm62.5 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,308 sqft — large-format homes (3BHK-and-up territory), not compact stock. This is a large, multi-tower township — 217 homes across 4 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 217 parking spaces for 217 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~65 sqm per home; across all 217 homes that is ~67% of the plot — the undivided shares sum to less than the plot area.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 25 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 30 Apr 2020, extended (Extension) to 31 Mar 2025 — both dates have passed with no OC on file. The extension on file was granted on 29 Dec 2021 (K-RERA extension no. EX/PRM/KA/RERA/1251/310/PR/211229/000671) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

2 K-RERA orders on this project (PROJECT EXTENSION) — read the order copies on the K-RERA portal.

K-RERA complaint orders (2 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
MR KIRAN VAKALAPUDI & ANOTHER vs M/S.SITARA DEVELOPERS PVT LTDInterest on delay period, Bare shell flat cost of 4.5 lakhs, OC charges not in client scope demanding100/- per sqft & two seperate parking as per sale agreement, Maintenance cost 5/- per sq without OCAUTHORITY28/01/2025
Suresh Jagannath vs MAHAVEER SITARAi) That the Complainants be paid interest on delay period starting from 30 August 2022 till the completion and handing over of possession with Occupancy Certificate. ii) That delay compensationAUTHORITY19/01/2026

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectTHOMAS TILAK-1999NO. 32/4, KASTURBA ROAD
ContractorKPC CONSTRUCTIONS-2007KAMMANAHALLI VILLAGE, BEGUR KOPPA ROAD
Structural engineerRENUKA PRASAD H N---

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹54.3 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: ICICI Bank M. G. Road (IFSC ICIC0000002, a/c …7122). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~10 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
MG Road / city centre9 km
Electronic City10 km
Bellandur–Marathahalli belt12 km
Outer Ring Road / Manyata17 km
Whitefield IT hub20 km
Kempegowda Int'l Airport36 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

5approved drawings on file
25other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 5 approved sheets are the same drawings the builder filed to get MAHAVEER SITARA approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sitara Developers.

Other RERA-registered projects in J. P. Nagar

Major developers building in J. P. Nagar

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Mahaveer Sitara?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026