RERA Property Intelligence Report · Preview
BUOYANT TECHNOLOGY CONSTELLATIONS · Bengaluru North · K-RERA PRM/KA/RERA/1251/309/PR/171014/000439
The Drawings Report · ₹4,999
We read all 5 approved drawings and 35 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.
One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.
Get it for this project →Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.
Free before you decide: the 14 things to get in writing before you book
Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.
Send the checklist to the family group Read it here →Mantri Manyata Energia covers 11.4 acres with 887 registered homes across 6 towers. At 77.8 homes per acre it sits at the 54th percentile of 521 Bengaluru North projects on this register (median 75.3). Its declared completion date of 30 June 2020 has passed; no occupancy certificate is on record.
Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
What you can verify free on this page
The official K-RERA filing record, in plain English
Registration and delivery
Mantri Manyata Energia is registered with K-RERA as PRM/KA/RERA/1251/309/PR/171014/000439, and the promoter has declared completion for 30 Jun 2020.
30 Jun 2020
declared completion
Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.
Source · K-RERA project register · read 10 Sep 2026
Project scale
Mantri Manyata Energia spans 46,134 sq m (11.40 acres), comprises 6 towers, registers 887 units, and is declared to cost ₹334.94 cr.
₹334.94 cr
declared project cost
11.40acres
46,134 sq m
887units
on the registration
3.25FAR
sanctioned
Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.
Source · K-RERA project registration · read 10 Sep 2026
🔒 What I’d do as a buyer here · Drawings Report
The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 887 | Total inventory registered with K-RERA. |
| Registered land area | 46,134 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 3.25 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 6 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 971 total (0 open) — 1.09 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 13-07-2015 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| A | 18 | 148 | 162 | - |
| B | 18 | 148 | 162 | - |
| C | 18 | 148 | 162 | - |
| H | 18 | 148 | 162 | - |
| I | 18 | 148 | 162 | - |
| J | 18 | 147 | 161 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 887 official flat/unit rows, matching the 887 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2.5-BHK | 442 | 81.3-81.5 sqm | 5.9-6.3 sqm | 442 |
| 3-BHK (A) | 441 | 88.4 sqm | 6.4-6.8 sqm | 441 |
| 1.5-BHK | 4 | 63.2-63.2 sqm | 4.7-4.9 sqm | 4 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| A | 148 | 63.2-88.4 sqm | 4.9-6.7 sqm | 148 |
| B | 148 | 63.2-88.4 sqm | 4.7-6.4 sqm | 148 |
| C | 148 | 81.3-88.4 sqm | 5.9-6.4 sqm | 148 |
| H | 148 | 81.3-88.4 sqm | 5.9-6.4 sqm | 148 |
| I | 148 | 63.2-88.4 sqm | 4.7-6.4 sqm | 148 |
| J | 147 | 63.2-88.4 sqm | 4.9-6.8 sqm | 147 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| A-002 | A | 0 | 1.5-BHK | 63.2 sqm | 4.9 sqm | 1 |
| A-003 | A | 0 | 3-BHK (A) | 88.4 sqm | 6.7 sqm | 1 |
| A-005 | A | 0 | 2.5-BHK | 81.3 sqm | 6.2 sqm | 1 |
| A-006 | A | 0 | 2.5-BHK | 81.3 sqm | 6.2 sqm | 1 |
| A-007 | A | 0 | 3-BHK (A) | 88.4 sqm | 6.7 sqm | 1 |
| A-008 | A | 0 | 3-BHK (A) | 88.4 sqm | 6.7 sqm | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Which flat to ask for · Drawings Report
The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.
No litigation declared on this project's K-RERA filing.
3 of 35 compliance document slots are filed as Not Applicable; the remaining 32 slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 30 Jun 2020, extended (Section 6 Extension) to 30 Dec 2021 — both dates have passed with no OC on file. The extension on file was granted on 13 Dec 2021 (K-RERA extension no. EX/PRM/KA/RERA/1251/309/PR/211213/000439) — it has been used, its deadline has also passed, and no further extension is recorded.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
2 K-RERA orders on this project (PROJECT EXTENSION) — read the order copies on the K-RERA portal.
K-RERA complaint orders (47 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| SHARATH KUMAR MAHAJAN vs MANTRI TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED & OTHERS | Direct to complete the project in another 6 months, handover fully furnished flat No. J-1706 , to pay delay period interest, if not respondents liable to pay claims of complainant claimed as in MOC | AUTHORITY | 30/04/2024 |
| Santhi Lakshmanan vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | compensation, refund | AUTHORITY | 29/07/2022 |
| MR JOSEPH MATHIAS vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | As prayed in the Facts of Complaint | AUTHORITY | 27/03/2023 |
| MR AMARJEET SINGH GILL vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS | Request for the refund of the amount with interest | AUTHORITY | 25/05/2023 |
| MR SUJAY MEETHALE PURAYIL AND ANOTHER vs M/S.MANTRI TECHNOLOGY CONSTELLTIONS | Direct Developer 1.Refund amount paid by complainant towards sale consideration with interest 2.Pay loan outstanding amount directly to Bank 3.Pay Complainants all Pre-EMI/EMIs paid to Bank till date. | AUTHORITY | 22/07/2024 |
| Jai Sahani vs Mantri Technology Constructions Private Liited | full refund of their own contribution and the PRE-EMIs paid to the financial institute on account of the default of the Respondent | AUTHORITY | 22/06/2026 |
| MR.ARJUN R MENON vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in the Facts of Complaint | AUTHORITY | 21/04/2023 |
| Fahmida Natankar Anwar vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | As prayed in the Facts of Complaint | AUTHORITY | 20/01/2023 |
| H Anand vs MANTRI TECHNOLOGY CONSTELLATIONS PRIVATE LIMITED | As prayed in the Facts of Complaint | AUTHORITY | 19/10/2022 |
| Madhumathi A vs MANATRI TECHNOLOGY CONSTELLATIONS PVT LTD | As prayed in the Facts of Complaint | AUTHORITY | 19/10/2022 |
| Manish Prabhat Tigga vs MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in the Facts of Complaint | AUTHORITY | 18/01/2023 |
| SMARAN THOMAS vs MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in the Facts of Complaint | AUTHORITY | 18/01/2023 |
| Sudhindra R vs MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in the Complaint | AUTHORITY | 18/01/2023 |
| Krishna Hegde vs MANTRI TECHNOLOGY CONSTELLATIONS | Please help me to get my House or Return my money with 18% PA interest till now. | AUTHORITY | 18/01/2023 |
| Sandeep Radhakrishnan vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | Fast track completion within a period not extending a year. If builder cannot handle further, please take action to handover the project to any other reliable reputed builder and complete the project | AUTHORITY | 15/11/2022 |
| Lakshminarayana and Padma vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | Relief as per the decision of the supreme court cited above | AUTHORITY | 15/11/2022 |
| SIDDANNA MARPALLE vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | As prayed in the Facts of Complaint | AUTHORITY | 15/10/2022 |
| ANAND H P vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | Delay in handling over possession and other relief (Including interest and penalty) | AUTHORITY | 15/10/2022 |
| GAGAN SHETTY & ANOTHER vs MANTRI TECHNOLOGY CONSTELLATIONS PVT. LTD., | Request for the refund of the amount with interest | AUTHORITY | 14/05/2024 |
| Prakash Mall vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD, MANYATA REALTY | As prayed for Facts of Complaint | AUTHORITY | 10/10/2022 |
| Hardikkumar Shah vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD, MANYATA INFRASTRUCTURE DEVELOPMENT PRIVATE LTD., MANYATA REALTY | As prayed in the Facts of Case | AUTHORITY | 10/10/2022 |
| Kandi Phani Kumar vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 09/11/2022 |
| Rashmi Ranjan Mishra vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD | As prayed in the Facts of Complaint | AUTHORITY | 09/11/2022 |
| Vijayaraghavan S V vs Mantri Technology Constellations Pvt Ltd., | As prayed in the Facts of Case | AUTHORITY | 08/11/2022 |
| Prashant S Ghargi vs Mantri Technology Constellations Pvt Ltd | As prayed in the Facts of Complaint | AUTHORITY | 07/11/2022 |
| MR.VARUN RAVISHANKAR vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in Facts of Complaint | AUTHORITY | 07/03/2023 |
| MR.N.V.RAGHAVAN vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in the Facts of Complaint | AUTHORITY | 07/03/2023 |
| Harshil J Shah vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD(BUOYANT TECHNOLOGY CONSTELLATION PVT LTD), MANYATA REALTY | As prayed in the Facts of Complaint | AUTHORITY | 06/12/2022 |
| Jai Sahani vs 1. MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD. 2. MANYATA INFRASTRUCTURE DEVELOPMENT PVT LTD | As prayed in Facts of Complaint | AUTHORITY | 06/09/2022 |
| Shanthi Chandrababu vs 1.MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD. 2. GOKULAM SHELTERS PVT LTD | as prayed in the Facts of Complaint | AUTHORITY | 06/09/2022 |
| Indrani N R vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD. CURRENTLY KNOWN AS BUOYANT TECHNOLOGY CONSTELLATIONS PVT LTD | As prayed in the Complaint | AUTHORITY | 05/09/2022 |
| Basawaraj Yallappa Hongal vs MANTRI TECHNOLOGY CONSTELLATIONS PVT LTD., CURRENTLY KNOWN AS BUOYANT TECHNOLOGY CONSTELLATIONS PVT LTD. | As prayed in the Facts of Complaint | AUTHORITY | 05/09/2022 |
| MALLIKARJUNA JS & KOMALA ASHOK vs MANTRI TECHNOLOGY CONSTELLATIKONS PVT. LTD., | Refund of advance sale consideration of Rs.10,00,000/- (Rupees Ten Lakh only) along with compensation calculated at Rs.4,00,000/- (Rupees Four Lakh only) at the rate of 24% p.a | AUTHORITY | 05/08/2024 |
| MR C.R.RENIL KUMAR & ANOTHER vs M/S.MANTRI TECHNOLOGY & OTHERS | Direct Developer to: 1.Refund sale consideration and Bank loan disbursed amount along with interest 2.Pay to Complainant Pre-EMIs & EMIs paid till date to bank, 3.Pay loan outstanding amount to Bank | AUTHORITY | 05/01/2024 |
| Amit Kumar Singh vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Shashank Aroor vs Mantri Manyata Energia | As prayed in the Facts of complaint | AUTHORITY | 02/11/2022 |
| Sriram and Anuradha R vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Kumaraswamy R S vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Anoop Kumar H S R vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Niveditha B K vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Ravi Tomal Raghavendra vs Mantri Technology Constellations Pvt. Ltd. | As prayed for in the Facts of complaint | AUTHORITY | 02/11/2022 |
| Vijaya S S vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Case | AUTHORITY | 02/11/2022 |
| Noor Ayesha vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Dr.Akshay Dwarakanath vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Mubeena Kausar vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| Sukanta Kumar Nayak vs Mantri Technology Constellations Pvt. Ltd. | As prayed in the Facts of Complaint | AUTHORITY | 02/11/2022 |
| MR.SATHISH R THOPPEY vs M/S.MANTRI TECHNOLOGY CONSTELLATIONS | As prayed in the Facts of Complaint | AUTHORITY | 01/03/2023 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (96 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/190213/0002123 13-02-2019 | Delay in handing over, INTEREST AND COMPENSATION | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190219/0002210 19-02-2019 | Delay in handing over, interest and compensation | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190228/0002318 28-02-2019 | Delay in possession, interest and compensation | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190301/0002324 01-03-2019 | Delay in possession, compensation, interest and other reliefs | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190301/0002326 01-03-2019 | delay in possession, interest & compensation | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190318/0002456 18-03-2019 | Delay in handing over apartment | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190325/0002512 25-03-2019 | Delay in possession, interest, compensation | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
| CMP/190329/0002535 29-03-2019 | Delay in handing over possession | Mantri Manyata Lithos (another project by this promoter) | DISPOSED AO |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | Edifice Consultants Pvt Ltd. | - | NA | 12 Museum Road, 12 Museum Road |
| Contractor | TATA PROJECTS LIMITED, | - | NA | 1-7-80 to 87, Prenderghast Road |
| Structural engineer | NAGESH CONSULTANTS | - | - | - |
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹37.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: HDFC Kasturba Road BranchI (IFSC HDFC0000009, a/c …7496). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
The nearest major job hub is ~2 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.
| Landmark | Straight-line |
|---|---|
| Outer Ring Road / Manyata | 2 km |
| MG Road / city centre | 9 km |
| Bellandur–Marathahalli belt | 15 km |
| Whitefield IT hub | 17 km |
| Kempegowda Int'l Airport | 18 km |
| Electronic City | 24 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
The approved drawings
Everything above is on this page already, free, from the government record. The drawings are different: the 5 approved sheets are the same drawings the builder filed to get Mantri Manyata Energia approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.
What that turns up — from other projects’ filings:
ATS Knightsbridge · Sector 124, Noida
You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.
Oberoi Elysian · Goregaon East, Mumbai
“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.
Godrej Aristocrat · Sector 49, Gurugram
Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.
Prestige Camden Gardens · Thanisandra, Bengaluru
The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.
Want this project read from its filed drawings?
This page is the free K-RERA filing summary. For Mantri Manyata Energia, one reading of it goes further. Which flat should I ask for? — what the approved drawings and filed papers say about the flats, the parking, the approvals, and what to get in writing before you sign. That is the Drawings Report. See a real one first:
Drawings Report sample: Prestige Camden Gardens → · browse all sample reports →
Payment is confirmed automatically. The Drawings Report is 1 working day. We email the link, so you can close the tab.
Drawings Report · ₹4,999
Every drawing on file, read — which flat to ask for · 1 working day
Not useful to your decision? Full refund — no questions asked.
Paying from outside India? Pay $59 (Drawings Report) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.
Built by Buoyant Technology.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.