Princeton

Bengaluru South · Prospect Group

Project X-Ray · for this project

Before you book, see what you’re really buying.

The layout. The real costs. The commitments. We read the plans and filings together, so you can decide with a clearer picture.

Six checks for your project.

  1. The Family Fit Scan

    A bedroom can fit a bed but leave no room for a work desk. We compare layouts for furniture, storage and the way your family lives.

  2. The Premium Lens

    What the extra price buys. A bigger advertised area may mean a larger balcony, not larger rooms. See what changes in usable space, views and privacy before paying more.

  3. The Unwritten Bill

    The flat price isn’t the full move-in budget. We flag missing kitchen fittings, extra utility charges and maintenance commitments.

  4. The Neighbour Math

    Eight homes on your floor feels different from four. We check shared floors, parking rights and access to facilities.

  5. The Progress Pulse

    Finished walls don’t mean water, power and access are ready. We read the detailed progress filings, not just the overall percentage.

  6. The Lawyer’s Shortlist

    A small token can come with a much larger cancellation charge. We flag that, the seller’s authority and documents your lawyer should check.

From another project · Prestige Park Grove

See the findings, not just a list of checks.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project X-Ray sample ↗
Prestige Park Grove Project X-Ray · first page
First page of the complete sample.
30 Apr 2017declared completionK-RERA registration · read 03 Nov 2026
180registered unitsK-RERA registration · read 03 Nov 2026

Free project details

Registration read 03 Nov 2026

Registered units and project size

Filed categories, unchanged · K-RERA registration · read 03 Nov 2026

The whole registration

1.8registered acres

98.7registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for Princeton

K-RERA · PRM/KA/RERA/1251/310/PR/171208/001307

Project facts and comparisons

On the register

Declared completion30 April 2017
Land area7,384 sq m (1.8 acres)
Homes registered180
Tower/wing entries5

In context

Density98.7 homes per acre
Density in context80th percentile of 793 Bengaluru South projects (median 77.3)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units180Total inventory registered with K-RERA.
Registered land area7,384 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries5Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)180Separate filed counts; these categories may overlap and are not added together.
Open-parking field50Separate filed counts; these categories may overlap and are not added together.
Garage field202Separate filed counts; these categories may overlap and are not added together.
Project start date29-11-2013

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Block A94040-
Block B94040-
Block C93030-
Block D93030-
Block E94040-

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

All 23 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 30 Apr 2017 — which has passed with no OC on file.

Approval documents

Electricity (BESCOM/ESCOM)Bundled document listed: All NOCs from Authority
Water & sewage (BWSSB/KWSSB)Bundled document listed: All NOCs from Authority
Fire NOCBundled document listed: All NOCs from Authority
Pollution control (KSPCB)Bundled document listed: All NOCs from Authority
Environmental clearanceBundled document listed: All NOCs from Authority
Airport Authority height clearanceBundled document listed: All NOCs from Authority

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹26.7 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: ANDHRA BANK Ongole (IFSC ANDB0000400, a/c …2351). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest of the listed job hubs is about 8 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
MG Road / city centre5 km
Bellandur–Marathahalli belt8 km
Electronic City11 km
Outer Ring Road / Manyata12 km
Whitefield IT hub16 km
Kempegowda Int'l Airport31 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Prospect Group.

Other RERA-registered projects in S.G. Palya

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 3 Nov 2026. Document and inventory dates are shown in their sections.