Site and Service Scheme at Koppal
· Karnataka Housing Board
Project Review · example purchase
Spending a few crores on a unit? ₹4,999 to check what you’re buying.
Check what the plans put beside your unit, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.
See the report before you buy
Avoid bad decisions, only go for the best units.
Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.
Read the Project Review sample ↗From another project
See the report before you buy.
A published sample shows the level of detail, source illustrations and buyer reasoning. Its findings belong to that project.
Read a sample report ↗Free project details
Registration read 16 Jul 2026Registered units and project size
Filed categories, unchanged · K-RERA registration · read 16 Jul 2026
The whole registration
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.
RERA details for Site and Service Scheme at Koppal
K-RERA · PRM/KA/RERA/1266/390/PR/310125/007464
Project facts and comparisons
On the register
Source: K-RERA. Each comparison names the group of projects used.
Project areas, parking and inventory
Project areas and parking
RERA filing| Disclosure | Official value | Why it matters |
|---|---|---|
| Approved plan number | 407/2021-22 | Use this to match the sanctioned drawing set shown by the builder. |
| Plan approval date | 23-09-2021 | |
| Project start date | 29-07-2021 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| plotted | 783 | 100% | 0 sqm |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingThe promoter answered No to the land-litigation question. This is a filed declaration, not a court search.
⚠ 10 of 30 compliance document slots are filed as under process / not yet usable: Certificate from Chartered Account, Electricity Permission Letter, Water Permission Letter, Project Specifications, District Magistrate and more.
3 additional compliance slots are filed as Not Applicable.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Dec 2025 — which has passed with no OC on file.
Approval documents
A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
Complaints on this project's K-RERA page (1 complaint listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/200402/0005787 02-04-2020 | Discrimination in allotting Car parking at KHB Platinum | KHB Platinum (another project by this promoter) | POSTED FOR ORDERS AUTHORITY BENCH4 |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Project team & certifications
RERA filingK-RERA names 2 project professional/vendor rows across Chartered accountant, Engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Chartered accountant | CA | 6565 | 5656 | Bengaluru Urban, Karnataka - 565656 |
| Engineer | Vikas H M | 56565 | 2000 | Bengaluru Urban, Karnataka - 560036 |
Builder track record
RERA filingKarnataka Housing has 29 other K-RERA-registered projects in our records (average reported construction progress 93%). 4 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
The estimated cost above is the developer's declared construction cost only (K-RERA's own label: "Estimated Cost of Construction as certified by Engineer") — it excludes land cost, so it isn't comparable to the buyer-collection figures below or to a sale price.
RERA 70% project account is on file: UNITED BANK OF INDIA Koppal IFSC Code : UBIN0909025 Pin Code : 583231. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Location & Connectivity
The nearest of the listed job hubs is about 301 km in a straight line from the mapped location. Road distance and travel time will differ.
| Landmark | Straight-line |
|---|---|
| Kempegowda Int'l Airport | 292 km |
| Outer Ring Road / Manyata | 301 km |
| MG Road / city centre | 307 km |
| Bellandur–Marathahalli belt | 315 km |
| Whitefield IT hub | 316 km |
| Electronic City | 322 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.