RERA Property Intelligence Report · Preview
Sanchaya Land And Estate · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/171014/000599
The Drawings Report · ₹4,999
We read all 4 approved drawings and 15 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.
One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.
Get it for this project →Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.
Free before you decide: the 14 things to get in writing before you book
Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.
Send the checklist to the family group Read it here →THE GREENS PHASE II occupies 5.1 acres with 513 registered homes in 6 towers. Its density of 99.9 homes per acre is the 80th percentile among 470 Anekal projects (median 75.8). Its declared completion date of 31 March 2016 has passed; no occupancy certificate is on record.
Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
What you can verify free on this page
The official K-RERA filing record, in plain English
Registration and delivery
THE Greens Phase II is registered with K-RERA as PRM/KA/RERA/1251/308/PR/171014/000599, and the promoter has declared completion for 31 Mar 2016.
31 Mar 2016
declared completion
Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.
Source · K-RERA project register · read 10 Sep 2026
Project scale
THE Greens Phase II spans 20,777 sq m (5.13 acres), comprises 6 towers, registers 513 units, and is declared to cost ₹103 cr.
₹103 cr
declared project cost
5.13acres
20,777 sq m
513units
on the registration
2.21FAR
sanctioned
Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.
Source · K-RERA project registration · read 10 Sep 2026
Promoter record
Sanchaya Land is the promoter of record on 3 projects registered with K-RERA, 2 of which are past their declared completion dates on the register.
3projects
registered with K-RERA
2past declared date
on the register
Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.
Source · K-RERA register, all projects · read 10 Sep 2026
🔒 What I’d do as a buyer here · Drawings Report
The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 513 | Total inventory registered with K-RERA. |
| Registered land area | 20,777 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.21 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 6 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 504 total (150 open) — 0.98 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 17-06-2014 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| OAK BLOCK TOWER A | 9 | 90 | 90 | - |
| OAK BLOCK TOWER B | 9 | 90 | 90 | - |
| OAK BLOCK TOWER C | 9 | 90 | 90 | - |
| OAK BLOCK TOWER D | 9 | 90 | 90 | - |
| OAK BLOCK TOWER E | 9 | 90 | 90 | - |
| CEDAR | 9 | 63 | 54 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 495 official flat/unit rows vs 513 registered units disclosed above; ask why the row count differs. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 3BHK | 351 | 79.6-87.9 sqm | 31.2-33.4 sqm | 351 |
| 2BHK | 144 | 40.5-58.1 sqm | 23.9-34.2 sqm | 144 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| OAK BLOCK TOWER A | 90 | 79.6 sqm | 31.2 sqm | 90 |
| OAK BLOCK TOWER B | 90 | 79.6 sqm | 31.2 sqm | 90 |
| OAK BLOCK TOWER D | 90 | 87.9 sqm | 33.4 sqm | 90 |
| OAK BLOCK TOWER C | 81 | 58.1 sqm | 23.9 sqm | 81 |
| OAK BLOCK TOWER E | 81 | 79.6 sqm | 31.2 sqm | 81 |
| CEDAR | 63 | 40.5-55.4 sqm | 25.1-34.2 sqm | 63 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| 1 | OAK BLOCK TOWER A | 1 | 3BHK | 79.6 sqm | 31.2 sqm | 1 |
| 2 | OAK BLOCK TOWER A | 1 | 3BHK | 79.6 sqm | 31.2 sqm | 1 |
| 3 | OAK BLOCK TOWER A | 1 | 3BHK | 79.6 sqm | 31.2 sqm | 1 |
| 4 | OAK BLOCK TOWER A | 1 | 3BHK | 79.6 sqm | 31.2 sqm | 1 |
| 5 | OAK BLOCK TOWER A | 1 | 3BHK | 79.6 sqm | 31.2 sqm | 1 |
| 6 | OAK BLOCK TOWER A | 1 | 3BHK | 79.6 sqm | 31.2 sqm | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Which flat to ask for · Drawings Report
The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.
No litigation declared on this project's K-RERA filing.
All 15 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Mar 2016, extended (an extension) to 31 Mar 2017 — both dates have passed with no OC on file. An extension application filed on 07 May 2024 is pending with K-RERA — until it is approved, the registration stands lapsed.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (27 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Vincent Fernandes vs THE GREENS PHASE II | Total amount paid for the flat is 24,88,594 till date. Requesting the builder to pay the Interest on the payments as compensation for delay in handing over the property. | AUTHORITY | 27/10/2022 |
| SUDHAKAR DAVULURI vs THE GREEN PHASE 2 | FULL Complaint uploaded online with supporting doc | AUTHORITY | 27/07/2022 |
| KULDIP KOKERI vs THE GREENS PHASE II | Refund of paid Amount with interest | AUTHORITY | 27/07/2022 |
| Bibhuti Bhushan Jha vs THE GREENS PHASE II | As per the brief above and attached Form O | AUTHORITY | 27/07/2022 |
| Anandoth Mohan vs Sanchaya Land And Estate Pvt Ltd | Refund of amount paid Rs.30,81,222 ( Rs.30 lakhs 81 thousand and twenty two) with interest accrued. All persons involved in this fraud to be punished under the law. | AUTHORITY | 20/10/2022 |
| Shivanand S Dhupad and Dr Vijaya Shivanand vs Sanchaya Land And Estate Pvt Ltd | Exit from the Project and Refund the whole amount | AUTHORITY | 18/10/2022 |
| Dayanand Madhu shetty vs Sanchaya Land And Estate Pvt Ltd | To order for registration of the flat by accepting the balance payment or refund of the amounts paid along with cost | AUTHORITY | 18/10/2022 |
| S RAMESH vs Sanchaya Land And Estate Pvt Ltd | Hence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Hon'ble RERA K, Adjudicating Officer | AUTHORITY | 18/05/2022 |
| Anush Kumar Bulusu vs Sanchaya Land And Estate Pvt Ltd | As Mentioned in the Complaint form. | AUTHORITY | 18/03/2025 |
| AJIT KUMAR PATHAK vs Sanchaya Land And Estate Pvt Ltd | The Applicants are seeking refund along with intetrest for purchase of Flat No. 104, Cedar Block, in Phase 2A and 2B, as follows: Rs 3,00,000/- (Rupees Three Lakh Only). | AUTHORITY | 18/03/2025 |
| Mohan Nagayya Shetty vs Sanchaya Land And Estate Pvt Ltd | Refund with interest for delivery date expiry | AUTHORITY | 18/03/2025 |
| Francis Pradeep Fernandes vs THE GREENS PHASE II | RERA's help is required to get the refund of the cancelled booking from 26th December, 2019 | AUTHORITY | 16/11/2022 |
| Shobha Thondiathara Rajappan vs THE GREENS PHASE II | Full refund of booking amount with delayed interests & other charges. | AUTHORITY | 16/11/2022 |
| S SUGANTHA vs SANCHAYA LAND AND ESTATE PVT LTD | Hence for the brief facts mentioned above we are seeking for following Reliefs and Prayer before Honourable RERAK Adjudicating Officer. | AUTHORITY | 14/07/2022 |
| RAJESH S T vs SANCHAYA LAND AND ESTATE PVT LTD | Kindly seeking Hon’ble RERA K, Adjudicating Officer for Flat Completion, Handover & Compensations. | AUTHORITY | 13/07/2022 |
| RISHAB SAHAY vs SANCHAYA LAND AND ESTATE PVT LTD | Hence for the brief facts mentioned above we are seeking for following reliefs and prayer hon,ble RERA K, Adjudicating officer | AUTHORITY | 13/07/2022 |
| SUUNIL TIKAMDAS DATWANI vs SANCHAYA LAND AND ESTATE PVT LTD., | Exit & Refund of the full Amount Paid along with the Interest, legal costs and such other relief as the Hon'ble Authority may deem fit in the interest of justuce. | AUTHORITY | 13/02/2025 |
| KAUSAR ABDUL KADIR KHAN vs SANCHAYA LAND AND ESTATE PVT LTD., | Kindly help us in returning our booking amount. All the necessary details of booking are attached. | AUTHORITY | 13/02/2025 |
| VANDANA VISHWANATH SHENOY vs SANCHAYA LAND AND ESTATE PVT LTD., | Exit & Refund of the amount paid, Legal Costs & such other relief as deemed fit by the Hon'ble Authority in the interest of justice. | AUTHORITY | 13/02/2025 |
| SRIKANTH H P & H S SURYAPRAKASH MURTHY vs SANCHAYA LAND AND ESTATE PVT LTD., | Return of sum paid of 19 Lakhs with interest (~18%) to a 9 year term as per recurring deposit transaction | AUTHORITY | 13/02/2025 |
| ABHIKARSHA DEBNATH & BIPASHA DEBNATH vs SANCHAYA LAND AND ESTATE PVT LTD., | 1. Need the full refund of what has been paid to the builder. 2. PRE EMI amount that was promised Builder and also is in Agreement. 3. Penalty for not completing in time along with bank interest | AUTHORITY | 13/02/2025 |
| MOHAN SHETTY vs SANCHAYA LAND AND ESTATE PVT LTD., | Refund of booking amount of Rs.11,34,591 + interest and compensation | AUTHORITY | 13/02/2025 |
| GIDUTHURI VARA LAKSHMI vs SANCHAYA LAND AND ESTATE PVT LTD., | Project Stalled - Builder absconding - Appeal for Money Refund | AUTHORITY | 13/02/2025 |
| Sundareshwar Jayachandran vs SANCHAYA LAND AND ESTATE PVT LTD | As per brief facts mentioned above and detailed complaint attached, I seek for reliefs and pray before Hon'ble RERA-K and Adjudicating officer as stated in section 5 of Form O uploaded. | AUTHORITY | 10/10/2022 |
| Vishal Dubey vs SANCHAYA LAND AND ESTATE PVT LTD | Full Refund of Amount paid along with Pre-EMI, Delayed compensation and Loss of interest OR Immesiate delivery of Flat post adjusting Pre-EMI, Delay compensation and Los of Interest | AUTHORITY | 06/07/2022 |
| V Rajagopalan vs SANCHAYA LAND AND ESTATE PVT LTD | Direct the respondent to handover the project, revoke the unilateral and illegal cancellation of our booking, refund of Pre EMI paid for Rs192661 with interest at 12%, continue pre EMI Payment etc | AUTHORITY | 06/07/2022 |
| ANIL FERNANDES & ANITA FERNANDES vs SANCHAYA LAND AND ESTATE PVT LTD., | REFUND OF FULL AMOUNT PAID ALONG WITH INTEREST | AUTHORITY | 01/03/2025 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (135 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/190227/0002312 27-02-2019 | Complaint under Section 31 RERA Act r/w Rule 29 and 30 Karnataka RERA Rules for Refund of Invested Amount | THE GREENS PHASE I (another project by this promoter) | DISPOSED AUTHORITY FULLBENCH |
| CMP/190307/0002380 07-03-2019 | Return of amount and Compensation | THE GREENS PHASE II | DISPOSED AO |
| CMP/190321/0002364 21-03-2019 | THE COMPLAINT UNDER SECTION 31 OF R. E. (R.&D.) ACT, 2016 | skyview (another project by this promoter) | DISPOSED AUTHORITY FULLBENCH |
| CMP/190522/0002133 22-05-2019 | Complaint u/s 31 of the RERA Act | skyview (another project by this promoter) | DISPOSED AO |
| CMP/190522/0002152 22-05-2019 | Variation in Sale Price | skyview (another project by this promoter) | DISPOSED AO |
| CMP/190522/0002363 22-05-2019 | Direct the Promoter to sell the Apartment at rate as advertised | skyview (another project by this promoter) | DISPOSED AO |
| CMP/190727/0003733 27-07-2019 | Non delivery of apartment | THE GREENS PHASE II | DISPOSED AO |
| CMP/190728/0003735 28-07-2019 | NON DELIVERY OF APARTMENT, NON PAYMENT OF PRE-EMI, DELAYED COMPENSATION,INTEREST REFUND, DAMAGE FOR MENTAL AGONY AND UNFAIR TRADE PRACTICES | THE GREENS PHASE I (another project by this promoter) | DISPOSED AO |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | MUNIRATHNAMMA | - | 1998 | parvati nagar, laggere |
| Contractor | M/S Vishwas Constructions | - | 2009 | HSR Layout, 7th Sector |
| Structural engineer | KK Mohan | - | - | - |
Sanchaya Land has 3 other K-RERA-registered projects in our records. 2 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹20.1 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: Axis Bank RT Nagar (IFSC UTIB0000363, a/c …0050). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.
| Landmark | Straight-line |
|---|---|
| Bellandur–Marathahalli belt | 5 km |
| Electronic City | 6 km |
| Whitefield IT hub | 11 km |
| MG Road / city centre | 12 km |
| Outer Ring Road / Manyata | 18 km |
| Kempegowda Int'l Airport | 34 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
The approved drawings
Everything above is on this page already, free, from the government record. The drawings are different: the 4 approved sheets are the same drawings the builder filed to get THE GREENS PHASE II approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.
What that turns up — from other projects’ filings:
ATS Knightsbridge · Sector 124, Noida
You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.
Oberoi Elysian · Goregaon East, Mumbai
“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.
Godrej Aristocrat · Sector 49, Gurugram
Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.
Prestige Camden Gardens · Thanisandra, Bengaluru
The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.
Want this project read from its filed drawings?
This page is the free K-RERA filing summary. For THE GREENS PHASE II, one reading of it goes further. Which flat should I ask for? — what the approved drawings and filed papers say about the flats, the parking, the approvals, and what to get in writing before you sign. That is the Drawings Report. See a real one first:
Drawings Report sample: Prestige Camden Gardens → · browse all sample reports →
Payment is confirmed automatically. The Drawings Report is 1 working day. We email the link, so you can close the tab.
Drawings Report · ₹4,999
Every drawing on file, read — which flat to ask for · 1 working day
Not useful to your decision? Full refund — no questions asked.
Paying from outside India? Pay $59 (Drawings Report) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.
Built by Sanchaya Land.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.
Own a unit in THE Greens Phase II?
Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.
Last checked against the RERA register: 10 Sep 2026