TNRERA · public records

Chennai region project records.

7,666 registrations in our saved register. Chennai, Chengalpattu, Kancheepuram and Tiruvallur districts, plus explicit Chennai planning approvals. Registration is not a guarantee of possession or current availability.

Newly registered projects →

Projects on the register

THE WORLD OF JOY
M/s.ALLIANCE BUDGET HOUSING INDIA PVT LTD · TN/35/Building/0087/2025 · Filed status: Change of Project Bank: ICICI Bank Limited, Cenotaph Branch, Chennai - 600018 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2027-12-31
VIVA VIBRANT
M/s · TN/35/Building/0090/2025 · Declared completion: 2026-12-31
CASAGRAND CASAMIA
M/s. CASAGRAND STAGE7 PRIVATE LIMITED · TN/35/Building/0097/2025 · Filed status: Change of Project Bank: Kotak Mahindra Bank Limited, Adyar Branch, Chennai - 600020 (account details omitted) · Declared completion: 2032-03-24
BRIGADE MORGAN HEIGHTS
M/s.Brigade Enterprises Limited · TN/35/Building/0099/2025 · Declared completion: 2030-06-30
CASAGRAND GOLDENGROVE
CASAGRAND PREMIER BUILDER LIMITED · TN/35/Building/0106/2025 · Filed status: Change of Project Bank: Karur Vysya Bank Limited, Besant Nagar Branch, Chennai - 600090 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2028-02-13
CASAGRAND JARVIS
EXOTIA BUILDER PRIVATE LIMITED · TN/35/Building/0107/2025 · Filed status: Change of Project Bank: DCB Bank Limited, Nungambakkam Branch, Chennai - 600034 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2028-03-13
ALTAVIDA Block - D
M/.SHATAPATRI ESTATES PRIVATE LTD · TN/35/Building/0115/2025 · Declared completion: 2032-09-01
DRA PHOEBE LUMINA
M/S DRA SMART CITY LLP · TN/35/Building/0127/2025 · Declared completion: 2033-02-17
HANU HOMES - SUNSHINE
Ms HANU HOMES rep by its Partner Mr. K GOPALAKRISHNAN · TN/35/Building/0130/2025 · Declared completion: 2029-12-31
JANANI'S HIGH TIDE
SHRI JANANI HOMES PRIVATE LIMITED · TN/35/Building/0134/2025 · Declared completion: 2026-12-31
RLD ALTIMA
M/s.Royal land & Developers Pvt. Ltd. · TN/35/Building/0144/2025 · Filed status: Change of Project Bank account details omitted · Declared completion: 2030-11-30
THE WHITE HOUSE – TOWER B
M/s. MP DEVELOPERS · TN/35/Building/0148/2025 · Declared completion: 2033-03-06
Project TN/35/Building/0154/2025
S SELVAKUMAR · TN/35/Building/0154/2025 · Filed status: Completed
BEVERLY RIDGE
M/s.VNCT Global LLP · TN/35/Building/0157/2025 · Declared completion: 2030-03-05
Spring Tide
M/s. ALLIANCE BUDGET HOUSING INDIA PVT LTD · TN/35/Building/0158/2025 · Declared completion: 2029-08-31
S&P NEW HAVEN RIBBON WALK
S&P FOUNDATION PVT LTD · TN/35/Building/0161/2025 · Filed status: Extension given upto 31.12.2027 · Declared completion: 2027-12-31
NAPA VALLEY BY DAC
DAC DEVELOPERS PVT LTD · TN/35/Building/0166/2025 · Filed status: Change of Project Bank: Kotak Mahindra Bank Limited, Adyar Branch, Chennai - 600020 (account details omitted) · Declared completion: 2030-05-31
VOORA ONE SEA
M/S.VOORA PROPERTY DEVELOPERS PVT LTD. · TN/35/Building/0169/2025 · Filed status: Change of Project Bank: HDFC Bank Limited, RK Salai Branch, Chennai - 600004 (account details omitted) · Declared completion: 2031-12-31
INCOR CHENNAI PROJECTS TWO PVT LTD changed to INCOR CHENNAI PROJECTS FOUR PVT LTD
1. M/s.PBEL PROPERTY DEVELOPMENT INDIA PVT LTD · TN/35/Building/0185/2025 · Filed status: Change of Project Bank: Karur Vysya Bank Limited, RAPB Branch, Hyderabad - 500034 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2030-09-26
WHITEFIELD MUDRA PHASE B
M/s.SHIRDI SHELTERS WHITEFIELD PRIVATE LIMITED · TN/35/Building/0188/2025 · Declared completion: 2032-10-29
ASHIANA SHUBHAM PHASE 3A
M/s.ASHIANA HOUSING LIMITED · TN/35/Building/0205/2025 · Filed status: Completed
NEST ETERNIA
M/s. THE NEST · TN/35/Building/0209/2025 · Declared completion: 2027-09-30
HEYDAY SENIOR CARE SERVICES CHENNAI PVT LTD
i)INCOR CHENNAI PROJECTS TWO PVT LTD ii)INCOR CHENNAI PROJECTS THREE PVT LTD iii)INCOR CHENNAI PROJECTS FOUR PVT LTD iv)PBEL PROPERTY DEVELOPMENT INDIA PVT LTD v)PBEL DEVELOPER INDIA PVT LTD · TN/35/Building/0210/2025 · Declared completion: 2030-09-27
SPRING TIDE
M/s. Alliance Budget Housing India Pvt Ltd · TN/35/Building/0216/2025 · Declared completion: 2029-07-31
VILLA ONE PHASE - II
M/s. Lifestyle Vin Homes LLP · TN/35/Building/0219/2025 · Filed status: Revised Carpet Area Statement · Declared completion: 2030-12-31
Prestige Pallavaram Gardens
M/s. Prestige Pallavaram Estates Private Limited · TN/35/Building/0224/2025 · Declared completion: 2029-12-31
RAJPARIS BLUE JEWEL
M/s.RAJPARIS CIVIL CONSTRUCTIONS · TN/35/Building/0225/2025 · Filed status: Change of Project Bank: State Bank of India, SME Annasalai Branch, Chennai - 600018 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2029-01-31
TVS EMERALD UDYANA PHASE III
M/s.TVS EMERALD LIMITED FORMERLY KNOWN AS EMERALD HAVEN REALITY LIMITED · TN/35/Building/0227/2025 · Declared completion: 2030-05-25
VILLA ONE PHASE - I
M/s.LIFESTYLE VIN HOMES LLP · TN/35/Building/0233/2025 · Declared completion: 2030-12-31
BAY VILLA
M/s.TVH ESTATES CHENNAI PRIVATE LIMITED · TN/35/Building/0237/2025 · Declared completion: 2028-03-31
ASHIANA SWARANG PHASE II
KAIRAV DEVELOPERS LIMITED · TN/35/Building/0242/2025 · Declared completion: 2028-10-15
Sidharth Bliss
M/s.Sidharth Foundations and Housing Limited · TN/35/Building/0255/2025 · Filed status: Progress of Work as on September 2026 Change of Project Bank: ICICI Bank, Ayanavaram Branch, Chennai - 600023 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2028-12-31
Mayfair-Dior
M/s. Rohini Property Developers · TN/35/Building/026/2024 · Declared completion: 2025-11-29
Casagrand Laurels
M/s. Casa Grand Premier Builder Ltd. · TN/35/Building/027/2024 · Declared completion: 2026-12-03
VINAYAGGAS - SAI NANDANA
M/s. Vinayaggas Infratech Private Limited · TN/35/Building/0304/2024 · Declared completion: 2031-11-06
BRIGADE TECH BOULEVARD
i) M/s. BRIGADE ENTERPRISES LTD · TN/35/Building/0317/2024 · Filed status: Progress of Work as on September 2026 Change of Project Bank: HSBC Bank Limited, Bangalore Branch, Bangalore - 560001 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2029-12-29
VGK SAI HARDIK
M/s. VGK PROPERTY DEVELOPERS PRIVATE LIMITED rep by its Director Tmt. M.Madhanghi · TN/35/Building/0325/2024 · Filed status: Completed · Declared completion: 2031-12-11
TVS EMERALD AARANYA PHASE III
M/s. Emerald Haven Realty Limited · TN/35/Building/0327/2024 · Declared completion: 2027-03-31
ZIVA CHARUKESI
M/s.ARUN EXCELLO HOMES PRIVATE LIMITED · TN/35/Building/0332/2024 · Filed status: Progress of Work as on June 2024 · Declared completion: 2029-12-31
NEST ACCOLADE
M/s.THE NEST · TN/35/Building/0333/2024 · Filed status: Progress of Work as on September 2024 Completed · Declared completion: 2026-01-31
SPYKA CYGNUS
S.SURESH KUMAR (POA) · TN/35/Building/0334/2024 · Declared completion: 2032-01-28
CASAGRAND FRENCH TOWN
M/S. CASAGRAND FRESH PRIVATE LIMITED · TN/35/Building/0337/2024 · Filed status: Progress of Work as on September 2024 · Declared completion: 2027-10-03
HUMMING GARDEN PHASE - III
ALLIANCE VILLAS PVT LTD · TN/35/Building/0343/2024 · Declared completion: 2025-06-30
CASAGRAND SELENIA
M/s.CASA GRANDE ZEST PRIVATE LIMITED · TN/35/Building/0345/2024 · Filed status: Progress of Work as on September 2024 · Declared completion: 2027-03-10
ISHA SYMPHONY VILLA
M/s.Isha Homes (India) Pvt Ltd · TN/35/Building/0355/2024 · Filed status: Progress of Work as on June 2026 Change of Project Bank: ICICI Bank Limited, Adyar Branch, Chennai - 600020 (account details omitted) · Declared completion: 2027-02-19
Eden Park Phase–II
M/s. Pragnya South City Projects Pvt. Ltd. · TN/35/Building/0365/2023 · Declared completion: 2031-03-26
CASAGRAND SELENIA II
CASA GRANDE ZEST PRIVATE LIMITED · TN/35/Building/0369/2024 · Filed status: Progress of Work as on June 2024 · Declared completion: 2027-03-10
DAC MIDTOWN
M/s. DAC DEVELOPERS PVT LTD · TN/35/Building/0383/2024 · Filed status: Progress of Work as on September 2024 Change of Project Bank: State Bank of India, SME Ekkattuthangal Branch, Chennai - 600032 (account details omitted) · Declared completion: 2029-04-30
ROYAL OAK
M/s. Royal Welding Wires Private Limited · TN/35/Building/0384/2024 · Declared completion: 2026-05-31
DAC MARSHAL
i) M/s.DAC DEVELOPERS PRIVATE LIMITED (GPA Holer) ii) Mrs. G.Nirmala (Owner) · TN/35/Building/0386/2024 · Filed status: Progress of Work as on September 2024 · Declared completion: 2029-03-31
Project TN/35/Building/0393/2023
M/s. K2 Engineers Pvt. Ltd. · TN/35/Building/0393/2023 · Declared completion: 2024-08-31
VRX Terrace
M/s. Vijay Raja Homes Private Limited · TN/35/Building/0399/2023
Nest Prosper
M/s. The Nest · TN/35/Building/040/2024
CASAGRAND SOUTHBROOKE II
M/s. CASA GRANDE GRACE PRIVATE LIMITED · TN/35/Building/0413/2024 · Filed status: Progress of Work as on September 2024 · Declared completion: 2028-03-10
VNR TIRA changed to VNR TIARA
S.Shiva Subramanian (Land owner) · TN/35/Building/0414/2024 · Filed status: Revised Carpet Area Statement Extension given upto 08.04.2027 · Declared completion: 2026-07-08
Nest Glitz"
M/s. The Nest · TN/35/Building/0429/2023
JONES CASSIA VIII
M/s.Jones Foundations Pvt Ltd · TN/35/Building/0431/2024 · Filed status: Change of Project Bank: State Bank of India, SME Branch Ambattur, Chennai - 600058 (account details omitted) Extension given upto 31.05.2027 · Declared completion: 2026-05-31
ZIVA AMRITAVARSHINI
M/s.ARUN EXCELLO HOMES PRIVATE LIMITED · TN/35/Building/0432/2024 · Filed status: Progress of Work as on March 2026 · Declared completion: 2027-12-31
Project TN/35/Building/0435/2023
M/s. Ruby Builders & Promoters · TN/35/Building/0435/2023
DAC Medallion"
M/s. DAC Developers Pvt. Ltd. · TN/35/Building/0436/2023
CERULEAN
M/s.CHAITANYA FOUNDATIONS PRIVATE LIMITED · TN/35/Building/0436/2024 · Declared completion: 2032-01-10
Hanu Aishwaryam"
M/s. Hanu Homes · TN/35/Building/0437/2023 · Declared completion: 2026-12-30
DRA INARA (PHASE - 1)
M/s.DRA AADITHYA SOUTH CITY PROJECTS PVT LTD · TN/35/Building/0438/2024 · Declared completion: 2029-06-21
VGN PRIDE DE' VILLA
M/s.VGN HOMES PRIVATE LIMITED · TN/35/Building/0441/2024 · Filed status: Progress of Work as on September 2024 · Declared completion: 2032-02-27
Nest Craze"
M/s. The Nest · TN/35/Building/0443/2023
Joel Park"
M/s. Jeni Construction Pvt. Ltd. · TN/35/Building/0444/2023 · Declared completion: 2031-05-10
DAC AEROPOLIS
M/s. DAC DEVELOPERS PVT LTD · TN/35/Building/0444/2024 · Filed status: Progress of Work as on September 2024 M/s. DAC Developers Pvt.Ltd., has mortgaged the property with M/s. Aditya Birla Housing Finance Limited (ABHFL) · Declared completion: 2029-07-31
Windsor Castle Phase-1"
M/s. Dolly Homes Builders & Promoters · TN/35/Building/0447/2023 · Declared completion: 2031-08-24
ATH ROYAL QUEEN
M/s. Asset Tree Homes Represented By Its Partner Thiru. K.Murali · TN/35/Building/0450/2024 · Declared completion: 2027-12-31
DRA BEENA CLOVER
M/s. DRA AADITHYA SOUTH CITY PROJECTS PVT LTD · TN/35/Building/0459/2024 · Declared completion: 2032-06-30
PROVIDENT BAYSCAPE
PURAVANKARA LIMITED · TN/35/Building/0461/2024 · Filed status: Change of Project Bank: HDFC Bank Limited, Kasturba Gandhi Marg Branch, Bangalore - 560001 (Collection account details omitted, Separate account details omitted, Transaction account details omitted) · Declared completion: 2028-08-05
Bollineni Renata – Tower-B"
M/s. BCIL ZED RIA Properties Pvt. Ltd. · TN/35/Building/0462/2023 · Declared completion: 2031-06-08
Kosmos Solaris
1) M/s. Urbando Developers LLP · TN/35/Building/0478/2023 · Declared completion: 2026-12-31
Project TN/35/Building/0481/2023
M/s. Harmony Residences Private Limited · TN/35/Building/0481/2023 · Declared completion: 2027-12-31
ACCESS SAI EMPIRE QUBE
M/s.ACCESS SAI EMPIRE HOMES PVT LTD rep by its Managing Director Mr.R. Sathyaseelan · TN/35/Building/0481/2024 · Filed status: Progress of Work as on March 2026 · Declared completion: 2029-07-25
Vidhuran"
M/s. Avittam Homes · TN/35/Building/0489/2023 · Declared completion: 2026-12-31
ENCANTO
M/s.SARADEUZ INFRASTRUCTURES PRIVATE LIMITED · TN/35/Building/0491/2024 · Filed status: Change of Project Bank: State Bank of India, SME Branch Chennai (13241), Egmore, Chennai - 600008 (account details omitted) · Declared completion: 2029-07-31
Ruby Horizon"
M/s. Ruby Builders & Promoters · TN/35/Building/0493/2023 · Declared completion: 2031-06-15
JOEL VIRUKSHAM
M/s.JENI CONSTRUCTIONS PRIVATE LIMITED · TN/35/Building/0494/2024 · Declared completion: 2028-12-31
Jones Cassia-VII"
M/s. Jones Foundations Pvt. Ltd. · TN/35/Building/0496/2023
NEST BONSAI
M/s.THE NEST · TN/35/Building/0504/2024 · Declared completion: 2026-09-30
ASN SERENITY
ASN HOUSING · TN/35/Building/0511/2024 · Declared completion: 2028-01-31
Sivarams Kamalalayam
.M.G.Seshadri (Land owner) · TN/35/Building/0512/2024 · Declared completion: 2027-03-05
Republic of Nature Phase 1
GTBHARATHI URBAN DEVELOPERS PVT. LTD. · TN/35/Building/0523/2024 · Declared completion: 2026-12-31
Vedesh Vivaan
M/s.VEDESH REALTORS PRIVATE LIMITED · TN/35/Building/0537/2024 · Filed status: Extension given upto 31.08.2026 · Declared completion: 2025-08-31
ARUSH ENCLAVE
G.Ekambaram · TN/35/Building/0542/2024 · Declared completion: 2026-04-03
ALPHA SIGNATURE
. S. ELRED KUMAR (Land owner) · TN/35/Building/0555/2024 · Declared completion: 2028-12-31
TVS EMERALD AARANYA PHASE III - 7 VILLAS
M/s.TVS EMERALD LIMITED · TN/35/Building/0559/2024 · Declared completion: 2027-09-30
ELEMENT 4 changed to ELEMENTS IV
GT BHARATHI URBAN DEVELOPERS PVT.LTD · TN/35/Building/0565/2024 · Declared completion: 2026-12-30
HANU HOME- ESHA
K.GOPALAKRISHNAN · TN/35/Building/0568/2024 · Declared completion: 2028-12-31
Chiron Villa
M/S. ARIMA BUILDERS AND TECHNOLOGIES PVT LTD AND Mr. U. NUSRATH SHARIF · TN/35/Building/0585/2024 · Declared completion: 2029-08-31
PODIGAI
AKSHAYA ESTATES REALTY LLP · TN/35/Building/0594/2024 · Filed status: Change of Project Bank account details omitted · Declared completion: 2027-03-31
TVS EMERALD SERENE SPRINGS
M/s.EMERALD HAVEN HOUSING PRIVATE LIMITED · TN/35/Building/0599/2024 · Declared completion: 2029-10-01
URBANDO EVORISE
URBANDO HOUSING · TN/35/Building/0607/2024 · Declared completion: 2032-12-31
TVS Emerald Lake Shore Club House
M/s. Emerald Haven Property Development Limited · TN/35/Building/081/2024 · Declared completion: 2026-01-31
Nest Stellar"
M/s. The Nest · TN/35/Building/430/2023
Humming Tree"
M/s. Kamlesh Builders · TN/35/Building/463/2023 · Declared completion: 2031-06-29
ATH Crown
M/s. Asset Tree Housing · TN/35/Building/480/2023 · Declared completion: 2031-08-29
Project TN/35/Building/498/2023
Thiru. R.Raj Thirupathy · TN/35/Building/498/2023 · Declared completion: 2024-11-30
Hub6 Sector - B
M/s.Fortune Estate Developers Private Limited · TN/35/Layout/0006/2025 · Filed status: Completed