RERA Property Intelligence Report · Preview

JEEVAN'S ALLURE

JEEVAN DEVELOPERS · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/070125/007354

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
2
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

152
Registered units
₹32.0 Cr
Est. construction cost
Units profiled
51
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units152Total inventory registered with K-RERA.
Official carpet area13,605 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area24,388 sqmUseful scale context when comparing density and project cost.
Registered land area10,488 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.75Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed172 total (175 covered, 0 open) — 1.13 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberBBMP/Ad.com/MDP/0092/24-25Use this to match the sanctioned drawing set shown by the builder.
Plan approval date11-07-2024
Project start date22-07-2024

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 BHK4026%2,911 sqm
3 BHK11274%10,693 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
ALLURE315217214.96 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 152 official flat/unit rows, matching the 152 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK11281.3-102.1 sqm64.3-83.6 sqm112
2 BHK4069.7-74.0 sqm53.1-59.0 sqm40

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
ALLURE15269.7-102.1 sqm53.1-83.6 sqm152
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
AG-01ALLURE03 BHK99.3 sqm79.4 sqm1
AG-02ALLURE03 BHK96.5 sqm72.9 sqm1
AG-03ALLURE02 BHK73.4 sqm53.4 sqm1
AG-04ALLURE02 BHK74.0 sqm54.9 sqm1
AG-05ALLURE03 BHK96.5 sqm72.9 sqm1
AG-06ALLURE03 BHK97.4 sqm81.4 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~963 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 152 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 172 parking spaces for 152 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~70 sqm per home; across all 152 homes that is ~102% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

17 of 44 compliance document slots are filed as Not Applicable; the remaining 27 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

2 of 3 applicable approvals are on file; still outstanding: Water supply and sewage board. Confirm each has been granted, not merely applied for, before booking.

7 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardTo Be Applied-View NOC
KSPCB- PCB (10 Acres to 125 Acres)Approved20-07-2024PCB NOC ALLURE 1.pdf
KPTCL- BESCOMApproved11-07-2024BESCOM NOC Allure 1 1.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantSRIKANTH PAYYAVULA2434522017Bengaluru Urban, Karnataka - 560066
EngineerMADAMANCHI SURENDRA NADHBCCL/BL-3.6/SE0333/21-222021Bengaluru Urban, Karnataka - 560077
ArchitectB V NARENDRANATH REDDYCA/2009/458042009Bengaluru Urban, Karnataka - 560066
ContractorKunam Sudhakar Reddy-2009Prakasam, Andhra Pradesh - 523101

Builder track record

RERA filing

Jeevan Developers has 2 other K-RERA-registered projects in our records (average reported construction progress 100%). 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹3.02 Cr collected from buyers, ₹3.02 Cr withdrawn from the project's escrow account.

Construction progress61% → 61% (+0 pts)
Units sold/booked as registered29/152 (19%)
Buyer collections in available QPRs₹3.02 Cr
Escrow withdrawals in available QPRs₹3.02 Cr (1.00x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹21.1 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC Whitefield Bangalore IFSC Code : HDFC0002377 Pin Code : 560066. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Whitefield IT hub5 km
Bellandur–Marathahalli belt8 km
Electronic City14 km
MG Road / city centre18 km
Outer Ring Road / Manyata20 km
Kempegowda Int'l Airport31 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Jeevan Developers.
Jeevan Developers has 3 projects registered in Bangalore, 1 completed.
3 complaints on the K-RERA register against Jeevan Developers in Bangalore.

Other projects by this builder in Bangalore

Jeevans Octave
Filing overdue · 100% built · 69% sold

Other RERA-registered projects in Balagere

Major developers building in Balagere

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Jeevan's Allure?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026