RERA Property Intelligence Report · Preview

Meera Enclave

NANDITH N PUNJA · · K-RERA PRM/KA/RERA/1273/319/PR/210323/005800

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

18
Registered units
₹2.6 Cr
Est. construction cost
Units profiled
47
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units18Total inventory registered with K-RERA.
Official carpet area1,071 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area1,722 sqmUseful scale context when comparing density and project cost.
Registered land area1,012 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.43Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings2Official tower/wing count in the K-RERA detail page.
Parking disclosed10 total (10 covered, 0 open) — 0.56 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan number24-7Use this to match the sanctioned drawing set shown by the builder.
Plan approval date20-07-2021
Project start date01-12-2021

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Commercial- Block216%43 sqm
2BHK-Block1844%510 sqm
Commercial- Block1211%138 sqm
Room- Block2422%77 sqm
3BHK-Block1211%212 sqm
1BHK-Block 116%44 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Block 1213109.91 m
Block 22509.91 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 18 official flat/unit rows, matching the 18 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK861.1-68.5 sqm5.7-6.4 sqm8
NA419.0-19.5 sqm2.3-2.9 sqm0 (4 with 0)
SHOP324.9-112.9 sqm2.4-10.0 sqm0 (3 with 0)
3 BHK2106.2 sqm9.9 sqm2
1 BHK144.5 sqm4.8 sqm0 (1 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Block 11324.9-112.9 sqm2.4-10.0 sqm10 (3 with 0)
Block 2519.0-42.8 sqm2.3-4.3 sqm0 (5 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
G-1Block 10SHOP112.9 sqm10.0 sqm0
G-2Block 10SHOP24.9 sqm2.4 sqm0
G-3Block 101 BHK44.5 sqm4.8 sqm0
F-1Block 113 BHK106.2 sqm9.9 sqm1
F-2Block 112 BHK62.9 sqm6.0 sqm1
F-3Block 112 BHK62.8 sqm6.0 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~613 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a boutique, low-density project — 18 homes across 2 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe registration form discloses 10 parking spaces, but the official unit register allots 10 lots across 10 of 18 unit rows (~0.6 per home) — read the form figure as the separately-disclosed lots, not total supply, and confirm your unit's allotted lots in the agreement.
Your land share (UDS)Undivided land share averages ~6 sqm per home; across all 18 homes that is ~10% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 1 of 40 compliance document slots are filed as under process / not yet usable: Certificate from Chartered Account.

24 additional compliance slots are filed as Not Applicable.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 27 Dec 2023, extended (Section 6 Extension) to 27 Dec 2024 — both dates have passed with no OC on file. The extension on file was granted on 01 Oct 2024 (K-RERA extension no. EX/PRM/KA/RERA/1273/319/PR/241001/005800) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantColine O Rodrigues2239881975Dakshina Kannada, Karnataka - 575002
EngineerYashwanth Kumar Rai120-385-99-14-239/2018-19[BE]1990Dakshina Kannada, Karnataka - 575003
ArchitectYashwanth Kumar Rai120-385-99-14-239/2018-19[BE]1990Dakshina Kannada, Karnataka - 575003
ContractorNANDITH N PUNJA-2021Dakshina Kannada, Karnataka - 575004

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹14.4 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: FEDERAL BANK OF INDIA MANGALORE IFSC Code : FDRL0001175 Pin Code : 575003. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~297 km away — well outside the job hubs — this is a value/space play, not a short-commute one; budget for the drive.

LandmarkStraight-line
MG Road / city centre296 km
Outer Ring Road / Manyata297 km
Electronic City303 km
Bellandur–Marathahalli belt305 km
Kempegowda Int'l Airport306 km
Whitefield IT hub311 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Nandith Punja.

Other RERA-registered projects in Marathahalli

Major developers building in Marathahalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Meera Enclave?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 16 Jul 2026