RERA Property Intelligence Report · Preview

MOHAN TRITONE

Mohan Builders · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/191124/007240

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

225
Registered units
₹94.9 Cr
Est. construction cost
Units profiled
40
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units225Total inventory registered with K-RERA.
Official built-up area37,985 sqmUseful scale context when comparing density and project cost.
Registered land area12,621 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings3Official tower/wing count in the K-RERA detail page.
Parking disclosed225 total (216 covered, 32 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberBBMP/Addl.Dir/JDNORTH/0040/23-24Use this to match the sanctioned drawing set shown by the builder.
Plan approval date04-04-2024
Project start date01-06-2024

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2 BHK3616%2,604 sqm
2.5 BHK2411%1,909 sqm
3 BHK16573%14,612 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Block A12484839.95 m
Block B12838339.95 m
Block C12949439.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 225 official flat/unit rows, matching the 225 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK16580.0-105.1 sqm37.9-51.6 sqm165
2 BHK3671.1-74.8 sqm33.8-35.8 sqm36
2.5 BHK2477.5-81.6 sqm38.4-38.6 sqm24

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Block C9481.2-105.1 sqm40.5-51.6 sqm94
Block B8371.1-89.4 sqm33.8-45.4 sqm83
Block A4877.5-92.2 sqm37.9-46.6 sqm48
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
101Block A13 BHK92.0 sqm44.6 sqm1
102Block A13 BHK92.2 sqm44.6 sqm1
103Block A13 BHK80.0 sqm37.9 sqm1
104Block A12.5 BHK77.5 sqm38.6 sqm1
201Block A23 BHK92.0 sqm46.6 sqm1
202Block A23 BHK92.2 sqm46.6 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~915 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 225 homes across 3 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 225 parking spaces for 225 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~42 sqm per home; across all 225 homes that is ~75% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 33 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

3 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved29-04-2023BWSSB NOC.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved29-05-2023KSPCB NOC.pdf
KSPCB- MOEF (Above 50 Acres)Approved05-05-2023SEIAA NOC.pdf
KPTCL- BESCOMApproved04-05-2024BESCOM NOC.pdf
Fire and SafetyApproved04-10-2023Fire NOC.pdf
Airport Authority of IndiaApproved26-04-2023AAI NOC.pdf
BSNL/Telecommunication DepartmentApproved25-04-2023BSNL NOC.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantSaurabh Srivastava0893712019Bengaluru Urban, Karnataka - 560102
EngineerChanakya NBCCL/BL-3.6/E-0326/23-242024Bengaluru Urban, Karnataka - 560085
ArchitectP Kalyan RaoCA/94/176431994Bengaluru Urban, Karnataka - 560075
ContractorM/s Mohan Builders-2018Bengaluru Urban, Karnataka - 560043

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹11.06 Cr collected from buyers, ₹7.04 Cr withdrawn from the project's escrow account.

Construction progress17% → 25% (+8 pts)
Units sold/booked as registered32/225 (14%)
Buyer collections in available QPRs₹19.24 Cr
Escrow withdrawals in available QPRs₹12.77 Cr (0.66x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹42.2 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: ICICI Bank Gunjur IFSC Code : ICIC0007431 Pin Code : 560087. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Bellandur–Marathahalli belt5 km
Whitefield IT hub6 km
Electronic City11 km
MG Road / city centre15 km
Outer Ring Road / Manyata18 km
Kempegowda Int'l Airport31 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Mohan Builders.
Mohan Builders has 2 projects registered in Bangalore.

Other projects by this builder in Bangalore

Other RERA-registered projects in Balagere

Major developers building in Balagere

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Mohan Tritone?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026