RERA Property Intelligence Report · Preview

Parkwest - Pine - Tower 9

Relationship Properties · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/210216/003899

The Drawings Report · ₹4,999

Which flat should you ask for in Parkwest - Pine - Tower 9?

We read all 7 approved drawings and 41 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

All 219 flats sold in the latest filing · 86% reported construction progress.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
10
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

Parkwest - Pine - Tower 9 spans 2.6 acres, housing 219 registered homes, all 3 BHK (S) Typ 14a units, estimated at ₹155.1 crore. With 85.5 homes per acre, it ranks at the 64th percentile of the 784 Bengaluru South projects tracked here (median 77.3). Its declared completion date of 31 December 2024 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2024
Land area10,361 sq m (2.6 acres)
Homes registered219
Towers1
Unit mix14 × 3 BHK (S) Typ 03

In context

Density85.5 homes per acre
Density in context64th percentile of 785 Bengaluru South projects (median 77.3)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Parkwest - Pine - Tower 9 is registered with K-RERA as PRM/KA/RERA/1251/310/PR/210216/003899, and the promoter has declared completion for 31 Dec 2024.

31 Dec 2024

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Parkwest - Pine - Tower 9 spans 10,361 sq m (2.56 acres), comprises 1 tower, registers 219 units, and is declared to cost ₹155.09 cr.

₹155.09 cr

declared project cost

2.56acres

10,361 sq m

219units

on the registration

31270.0FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

Promoter record

What else is this promoter on record for?

Relationship Properties is the promoter of record on 10 projects registered with K-RERA, 8 of which are past their declared completion dates on the register.

10projects

registered with K-RERA

8past declared date

on the register

58%

average construction reported

Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.

Source · K-RERA register, all projects · read 10 Sep 2026

Construction

How much construction has been reported?

Parkwest - Pine - Tower 9 reports 86% construction progress in its most recent quarterly filing with K-RERA.

86%

reported construction progress

The percentage the promoter filed at the last quarterly report. It is a filed figure, not an inspection, and it can lag site conditions between filings.

Source · K-RERA quarterly progress report · read 10 Sep 2026

Sales

How much has been booked?

Parkwest - Pine - Tower 9 reports 219 of 219 units booked in its most recent quarterly filing with K-RERA, about 100%.

100%booked

219 of 219 units

Booked share as the promoter filed it at the last quarterly report; this is the filed position, not current availability.

Source · K-RERA quarterly progress report · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

219
Registered units
₹155.1 Cr
Est. construction cost
Units profiled
48
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units219Total inventory registered with K-RERA.
Official carpet area1,541 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area10,361 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~3.02Sanctioned floor-area ratio (≈31,270 sqm sanctioned FAR area ÷ 10,361 sqm land) — higher means a denser vertical build.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed283 total (20 open) — 1.29 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date01-02-2021

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK (S) Typ 0314100%1,541 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Pine - Tower 932219283-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 219 official flat/unit rows, matching the 219 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK128108.3-110.1 sqm54.5-59.0 sqm192
2.5 BHK3188.6 sqm45.1-47.3 sqm31
2BHK3169.8 sqm37.0-39.4 sqm31
1BHK2942.9 sqm21.5-23.1 sqm29

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Pine - Tower 921942.9-110.1 sqm21.5-59.0 sqm283
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
001Pine - Tower 903BHK108.3 sqm54.5 sqm2
002Pine - Tower 903BHK110.1 sqm55.0 sqm1
101Pine - Tower 913BHK108.3 sqm54.5 sqm1
102Pine - Tower 913BHK110.1 sqm55.0 sqm2
201Pine - Tower 923BHK108.3 sqm54.5 sqm1
202Pine - Tower 923BHK110.1 sqm55.0 sqm2

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~989 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 219 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 283 parking spaces for 219 homes (~1.3 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~47 sqm per home; across all 219 homes that is ~100% of the plot — the undivided shares sum to close to the whole plot.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

12 of 41 compliance document slots are filed as Not Applicable; the remaining 29 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2024, extended (Section 6 Extension) to 31 Dec 2025 — both dates have passed with no OC on file. The extension on file was granted on 25 Apr 2025 (K-RERA extension no. EX/PRM/KA/RERA/1251/310/PR/250425/003899) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (8 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Ajit Kumar vs Relationship Properties Private LimitedInterest on delay period. No further payment demands from the builder till we are allowed to visit our flat.AUTHORITY24/06/2026
KIRAN JAIN vs RElationship Properties Private LimitedAs per the agreement, builder should not be demanding the 3 pending installments as the builder has failed in delivering the possession by 31/12/2024 and he is liable to pay interest at 11.9% .AUTHORITY23/09/2025
RAKESH NAIR vs Parkwest - Pine -Tower -9HANDING OVER POSSESSION OF FLAT AS SOON AS POSSIBLE AND INTEREST ON DELAYED PERIODAUTHORITY19/08/2025
KAVITHA vs RELATIONSHIP PROPERTIES PRIVATE LIMITEDreturn of balance moneyAUTHORITY16/05/2024
Shanky Munoth Prakash vs PARK WEST PINE -TOWER -9Requesting Interest for delayed project and action from RERA to have builder keep homebuyers update on progress. compensation to include interest (MCLR + 2%)AUTHORITY15/12/2025
Neha Anand Lodha vs Relationship Properties Private LimitedCompletion of all the construction works as stipulated in the Agreement of sale, handover possession of Parkwest tower 9, Pine - 803, with quality check & assurance as promisedAUTHORITY09/12/2025
JIA NAVEEN DODEJA vs Parkwest Pine- Tower-9SEEKING A FIRM COMMITMENT ON THE DELIVERY DATE & INTEREST FOR DELAY PERIOD TIL THE OFFER OF POSSESSION OF THE PROPERTY & WITHHOLDING OF BALANCE PAYMENT TILL POSSESSION WITHOUT ANY PENALTY & INTEREST .AUTHORITY04/05/2026
JHANVI N SHROFF vs Relationship Properties Private Limited.SEEKING A FIRM COMMITMENT ON THE DELIVERY DATE & INTEREST ON DELAY PERIOD TILL THE OFFER OF POSSESSION OF THE PROPERTY & WITHHOLDING OF BALANCE PAYMENT TILL POSSESSION WITHOUT ANY PENALTY & INTEREST .AUTHORITY04/05/2026

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (312 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190311/0002417
11-03-2019
Refund of Booking amount with GST along with interest and compensation, For revokation of RERA registration granted to the promoterParkwest - Sapphire- Tower 5 (another project by this promoter)DISPOSED AUTHORITY
CMP/190311/0002422
11-03-2019
Refund of booking amount and GST amount paid, along with interest and compensation, to revoke the registration granted by RERAParkwest - Sapphire- Tower 5 (another project by this promoter)DISPOSED AUTHORITY
CMP/201009/0006794
09-10-2020
Delay in Project Delivery as promised in Advertisement and AgrementParkwest - Maple - Tower 4 (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/201010/0006804
10-10-2020
Delay in apartment unit and amenities handover as committed in the AgreemetnParkwest - Maple - Tower 4 (another project by this promoter)DISPOSED AUTHORITY BENCH4
CMP/201010/0006812
10-10-2020
Delay in Project Delivery as promised in Advertisement and AgrementParkwest - Maple - Tower 4 (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/201011/0006814
11-10-2020
POSSESSION PENDINGParkwest - Maple - Tower 4 (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/201107/0007032
07-11-2020
No construction activity/No concrete response from BuilderParkwest - Sapphire- Tower 5 (another project by this promoter)DISPOSED AUTHORITY BENCH5
CMP/201127/0007136
27-11-2020
Breach of Agreement and non response to previous complaintParkwest - Sapphire- Tower 5 (another project by this promoter)DISPOSED AUTHORITY BENCH5

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note Fire NOC and environmental clearance are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

9 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
KSPCB- PCB (10 Acres to 125 Acres)Approved09-01-2026CFO Copy.pdf

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectRSP Design Consultants India Private Limited-1978Ashok Nagar, Bengaluru
ContractorShapoorji Pallonji And Company Private Limited-1943Kaveri Nagar, Murgesh Pallya
Structural engineerDesigntree Service Consultants Private Limited---

Builder track record

RERA filing

Relationship Properties has 10 other K-RERA-registered projects in our records (average reported construction progress 58%). 8 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹3.65 Cr collected from buyers, ₹3.54 Cr withdrawn from the project's escrow account.

Construction progress86% → 86% (+0 pts)
Units sold/booked as registered219/219 (100%)
Buyer collections in available QPRs₹3.65 Cr
Escrow withdrawals in available QPRs₹3.54 Cr (0.97x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹70.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC Rajajinagar, Dr. Rajkumar road (IFSC HDFC0004000, a/c …9352). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~11 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
MG Road / city centre5 km
Outer Ring Road / Manyata11 km
Bellandur–Marathahalli belt14 km
Electronic City17 km
Whitefield IT hub21 km
Kempegowda Int'l Airport30 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

7approved drawings on file
41other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 7 approved sheets are the same drawings the builder filed to get Parkwest - Pine - Tower 9 approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Relationship Properties.
Relationship Properties has 11 projects registered in Bangalore, 2 past RERA deadline.

Other projects by this builder in Bangalore

Parkwest - Oak - Tower 10
Past deadline · 74% built · 100% sold
Parkwest - Cedar - Tower 8
Due soon · 75% built · 100% sold
Parkwest - Emerald - Tower 2
No filings
Parkwest - Magnolia - Tower 6
No filings
Parkwest - Mahogany - Tower 7
No filings
Parkwest - Maple - Tower 4
No filings

Other RERA-registered projects in Binnipete

Major developers building in Binnipete

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Parkwest - Pine - Tower 9?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026