MahaRERA · the public record
Manhattan Phase 2
Patlipada · SAI UMA CONSTRUCTION PRIVATE LIMITED
Project Review · example purchase
Spending a few crores on a home? ₹4,999 to check what you’re buying.
Check what the plans put beside your home, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.
From another project · Empire Solitaire
Avoid bad decisions, only go for the best homes.
Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.
Read the Project Review sample ↗
From another project · Dosti Pine · earlier comprehensive example
North-east at the door. Or in the living room.
E2506 has north-east-facing living space and a south-west entrance. E3001 reverses those directions and sits on the top floor. The report compares named flats, refuge adjacency and shared gardens using the March 2026 filing, read on 17 September 2026; this is not live availability.
This longer example shows the depth of research available in Project Deep Dive. These findings concern the named sample, not this project.
Read the Dosti Pine sample report ↗
Free project details
Registration read 18 Jul 2026RERA details for Manhattan Phase 2
MahaRERA · P51700013323
Delivery and registration
When is the project declared for completion?
Manhattan Phase 2 is registered with MahaRERA as P51700013323 and the promoter has declared completion for 31 Mar 2026.
31 Mar 2026
declared completion
7months past
against the declared date
The completion date and status as they stand on the MahaRERA registration record.
Source · MahaRERA project registration · read 18 Jul 2026
| MahaRERA registration | P51700013323 |
| Registered on | 22 Sep 2017 |
| Promoter-declared completion | 31 Mar 2026 |
| Current status | Certificate Signed |
| Against today | about 7 months past the declared date |
Approvals and compliance
What compliance filings are on record?
MahaRERA's defaulter and deregistration lists and the quarterly-progress filing for Manhattan Phase 2 record 1 quarterly progress report since registration.
1quarterly filing
Entries as they appear on MahaRERA's own lists and the project's progress filing.
Source · MahaRERA defaulter, deregistration and QPR lists · read 18 Jul 2026
- Current QPR default — the promoter has stopped filing the mandatory quarterly progress report (2026-03-31).
Promoter record
What else is this promoter on record for?
SAI UMA CONSTRUCTION PRIVATE LIMITED is the promoter of record on 3 projects registered with MahaRERA.
3projects
registered with MahaRERA
Counted across Quietlist's full MahaRERA register store, matched on the promoter name as it appears on each filing.
Source · MahaRERA register, all projects · read 18 Jul 2026
Construction
How much construction cost has been reported?
In Manhattan Phase 2, ₹95.50 Cr of a declared ₹115.00 Cr estimated project cost is reported as incurred, about 83.0%, as at the last certified filing with MahaRERA.
83.0%
₹95.50 Cr
of ₹115.00 Cr declared cost
Cost incurred as last certified to MahaRERA. It is a financial measure, not a survey of site work, and it can lag on-site reality between filings.
Source · MahaRERA quarterly progress filing · read 18 Jul 2026
Sales
How many are filed as sold or booked?
In Manhattan Phase 2, 199 of 236 homes filed with MahaRERA are recorded as sold or booked (181 with registered agreements and 18 booked), about 84%, and 37 are filed as unsold.
84%sold or booked
199 of 236 homes
₹266.85 Cr
committed by buyers
Counts and agreement value as the promoter filed them at the last compliance date; this is the filed inventory, not current availability. Of that agreement value, ₹236.76 Cr (about 89%) is recorded as collected and ₹30.09 Cr as receivable.
Source · MahaRERA sold/unsold inventory filing · read 18 Jul 2026
Filed agreement values: across 199 sold or booked entries with usable filed values and areas, the effective carpet rate is ₹17,440/sqft, with eight in ten falling between ₹15,261 and ₹19,169 — computed from the agreement values and carpet areas the promoter filed, not broker quotes.
The units recorded as unsold on the filing. The reckoner value is the government's ready-reckoner assessment the promoter filed against that unit, the figure stamp duty is charged on. It is not a price anyone paid, not an asking price, and not a valuation of the unit.
| Floor | Unit | Carpet | Govt reckoner value |
|---|---|---|---|
| Floor 1 | 105 | 911 sqft (84.6 sqm) | ₹1.36 Cr |
| Floor 10 | 1003 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 10 | 1004 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 10 | 1006 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 11 | 1101 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 11 | 1103 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 11 | 1104 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 11 | 1106 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 12 | 1201 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 12 | 1203 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 12 | 1204 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 12 | 1206 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 23 | 2302 | 911 sqft (84.67 sqm) | ₹1.32 Cr |
| Floor 37 | 3705 | 982 sqft (91.19 sqm) | ₹1.41 Cr |
| Floor 39 | 3901 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 39 | 3902 | 982 sqft (91.19 sqm) | ₹1.41 Cr |
| Floor 39 | 3903 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 39 | 3904 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 39 | 3905 | 982 sqft (91.19 sqm) | ₹1.41 Cr |
| Floor 39 | 3906 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 4 | 402 | 911 sqft (84.67 sqm) | ₹1.32 Cr |
| Floor 4 | 403 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 40 | 4001 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 40 | 4002 | 982 sqft (91.19 sqm) | ₹1.41 Cr |
| Floor 40 | 4003 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 40 | 4004 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 40 | 4005 | 982 sqft (91.19 sqm) | ₹1.41 Cr |
| Floor 40 | 4006 | 799 sqft (74.25 sqm) | ₹1.16 Cr |
| Floor 5 | 501 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 7 | 703 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 9 | 901 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 9 | 902 | 911 sqft (84.67 sqm) | ₹1.32 Cr |
| Floor 9 | 903 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Floor 9 | 904 | 667 sqft (61.93 sqm) | ₹97.54 Lakh |
| Stilt | 1 | 2,256 sqft (209.59 sqm) | ₹3.19 Cr |
| Stilt | 2 | 943 sqft (87.59 sqm) | ₹1.36 Cr |
| Stilt | 3 | 2,233 sqft (207.48 sqm) | ₹3.16 Cr |
No units are declared mortgaged, reserved, investor-held or not-for-sale in this inventory filing.
What the filings record, home by home
Read from MahaRERA on 22 October 2026
MahaRERA publishes, home by home, what this promoter filed: which homes are sold and which are not, the RERA carpet area of each, and for sold or booked entries the filed agreement value — the consideration filed for that specific home. On this project 206 homes carry one, and 30 of the 236 are recorded unsold. Since we started watching this ledger, 8 homes have moved out of the unsold list, most recently on 08 September 2026.
Here is one home filed as unsold, beside the amounts filed for comparable homes:
| Home | Carpet | Filed comparison | Based on |
|---|---|---|---|
| 2 | 943 sqft | Rs 16,888 a sq ft typical, over Rs 12,909 to Rs 20,945 | 65 filed · nearby areas in the project (within 8%) |
A filed consideration is the amount the promoter reported for one home. It is not a valuation, and MahaRERA does not publish the date of any of these agreements — read a range as a spread, not as a trend. An unsold row means no sale had been filed for it when we looked, which is a filing state, not a promise that the home is available to you today. One of the two observations is an archived copy whose time is the moment the file was written, not a portal fetch time.
In Manhattan Phase 2, 26 of the 30 unsold homes have filed sales to compare with. The Sales Report gives each of them its own row — the filed agreements behind its comparison listed in full, the government reckoner value the promoter filed against it, and mortgage status where the filing supplies it. Missing mortgage information is not confirmation that a unit is free of a mortgage. Built from the filing itself, sent by email.
Buildings & Wings
The buildings and wings registered under this project, with each tower's sanctioned height and declared completion date. Here the tallest tower rises to G+45 and 236 homes are registered across the project.
| Building | Wings | Floors | Units | Declared completion |
|---|---|---|---|---|
| Brooklyn | 1 | G+45 | 236 | - |
Unit mix on the filing: 236 residential.
Legal and disputes
What disputes are disclosed?
7 complaints are on the MahaRERA record for Manhattan Phase 2, with orders passed in 7 of them.
7complaints
7with an order
Counts as disclosed in the project record.
Source · MahaRERA project disclosures · read 18 Jul 2026
| Complaint no. | Filed | Parties | Status |
|---|---|---|---|
| CC006000000429327 | 19/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
| CC006000000429329 | 19/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
| CC006000000429330 | 27/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
| CC006000000429331 | 27/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
| CC006000000429333 | 27/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
| CC006000000429334 | 27/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
| CC006000000429336 | 27/02/2024 | Runwal Developers Private Limited vs Sai Uma Constructions Pvt Ltd | order passed |
Legal & Litigation
The promoter has declared 7 court cases on this project to MahaRERA. Filed statuses: 1 “Ongoing”; 2 “Disposed” (filed description; status field empty); 4 “Pending” (filed description; status field empty). These are the promoter's filed statements, not a current court check. A disposed application or motion does not establish that the whole case is closed. Litigation can cloud the land title or stall the build — have a lawyer pull the cause list for each and confirm whether it touches the title to your home. This is declared by the promoter; there may be further cases not on the RERA record.
| Court | Case no. | Year | Status |
|---|---|---|---|
| Thane Court | 184 | 2016 | Ongoing Filed description: PENDING INTERIM ORDER IN FAVOR OF PROMOTER / a) M/s. Sai Uma Corporation ( Now Sai Uma Construction private Limited ) have filed a suit bearing Spl. Civil. Suit No.184/2016 against Kalpana Hemant Fulore & Ors. for Declaration and injunction in the court of Civil Judge (S.D Thane, at Thane). in respect of land bearing Survey No.128/- Survey No.129/2A lying, being and situate at Village Kavesar, Taluka & Dist. Thane. |
| Thane Court | 51 | 2017 | Status not supplied Filed description: Disposed |
| Thane Court | 290 | 2016 | Status not supplied Filed description: Disposed |
| High Court | 6327 | 2018 | Status not supplied Filed description: Pending |
| Thane Court | 11 | 2019 | Status not supplied Filed description: Pending |
| High Court | 3444 | 2017 | Status not supplied Filed description: Pending |
| High Court | 3250 | 2017 | Status not supplied Filed description: Pending |
Deadline Extensions
The MahaRERA completion deadline for this project has been formally extended 3 times, as recorded on the register.
| From | Extended to | Stated reason |
|---|---|---|
| as registered | 29 Dec 2024 | The policy relating to the construction amenity was revised by the provisions of UDCPR and therefore promoter was constrained to purchase adjacent property for surrender of amenity |
| 29 Dec 2024 | 31 Dec 2025 | The Promoter was constrained to amend the layout and building plan in accordance with the revised rules after the implementation of UDCPR in December 2020. We are constrained to pr |
| 31 Dec 2025 | 31 Mar 2026 | 1. The Project is 97% completed 2. 55.78 % consent of allottees are obtained for the extension 3. QPR till date are updated 4.PERT Chart uploaded 5. The 97% complete and the rem |
Location, Land & Connectivity
Located at Patlipada, Hiranandani Estate, Thane, Thane, 400615. Per the filed land record, the plot is bounded to the north by SNo 127 SNo 125 SNo 225, to the south by 40 mtr wide DP Road, to the east by 25 mtr wide DP Road and to the west by 40 mtr wide DP Road. These are the boundaries as recorded in the filed land record.
Location & connectivity
The nearest of the listed job hubs is about 17 km in a straight line from the mapped location. Road distance and travel time will differ.
| Landmark | Straight-line |
|---|---|
| Powai / Hiranandani business park | 17 km |
| Andheri MIDC / SEEPZ | 18 km |
| Chhatrapati Shivaji Int'l Airport | 22 km |
| Bandra Kurla Complex (BKC) | 24 km |
| Lower Parel / Worli business district | 32 km |
| Nariman Point / Fort | 40 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.