Avana Floresta

Avana Constructions · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/220425/007683

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

30
Registered units
₹13.4 Cr
Est. construction cost
Units profiled
23
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units30Total inventory registered with K-RERA.
Official carpet area3,772 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area4,765 sqmUseful scale context when comparing density and project cost.
Registered land area2,367 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.59Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed35 total (33 covered, 0 open) — 1.17 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan number25/2024-25Use this to match the sanctioned drawing set shown by the builder.
Plan approval date04-09-2024
Project start date15-01-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3BHK30100%3,016 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Avana Floresta4303514.95 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 30 official flat/unit rows, matching the 30 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK3093.7-100.8 sqm36.3-50.6 sqm30

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Avana Floresta3093.7-100.8 sqm36.3-50.6 sqm30
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
001Avana Floresta03 BHK100.8 sqm38.6 sqm1
002Avana Floresta03 BHK100.8 sqm38.6 sqm1
003Avana Floresta03 BHK100.8 sqm38.6 sqm1
004Avana Floresta03 BHK100.8 sqm38.6 sqm1
005Avana Floresta03 BHK93.7 sqm36.3 sqm1
006Avana Floresta03 BHK100.8 sqm38.6 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,082 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 30 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 35 parking spaces for 30 homes (~1.2 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~46 sqm per home; across all 30 homes that is ~58% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 10 of 21 compliance document slots are filed as under process / not yet usable: Affidavit, Certificate from Registered Engineer indicating the structural safety of the building, Project Specifications, Brochure, Relinquishment Deed and more.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

1 of 2 applicable approvals are on file; still outstanding: KPTCL- BESCOM. Confirm each has been granted, not merely applied for, before booking.

8 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved06-12-2024WATER NOC.pdf
KPTCL- BESCOMTo Be Applied-View NOC

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantPradeep R2141522015Bengaluru Urban, Karnataka - 560078
EngineerChethan Kumar .RBCC/BL-3.6E-4084/2015-162015Bengaluru Urban, Karnataka - 560078
ArchitectMayur G. KulkarniBCCL/BL-3.6/A-016/22-232022Bengaluru Urban, Karnataka - 560098
ContractorAvana Constructions-2022Bengaluru Urban, Karnataka - 560070

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹0.56 Cr collected from buyers, ₹0.76 Cr withdrawn from the project's escrow account. This quarter the escrow withdrawal (₹0.76 Cr) exceeded buyer collections (₹0.56 Cr) — worth asking the builder to reconcile against certified construction milestones, which is what RERA requires escrow draws to track.

Construction progress28% → 40% (+12 pts)
Units sold/booked as registered6/30 (20%)
Buyer collections in available QPRs₹0.86 Cr
Escrow withdrawals in available QPRs₹1.03 Cr (1.20x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹44.6 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Bank of Baroda Jayanagar 3rd Block IFSC Code : BARB0JAYANA Pin Code : 560011. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~6 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Bellandur–Marathahalli belt6 km
Electronic City8 km
Whitefield IT hub9 km
MG Road / city centre15 km
Outer Ring Road / Manyata20 km
Kempegowda Int'l Airport34 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Avana Constructions.

Other RERA-registered projects in Chikkakannalli

Major developers building in Chikkakannalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.