RERA Property Intelligence Report · Preview

ND PASSION ELITE

ND DEVELOERS · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/180313/000661

The Drawings Report · ₹4,999

Which flat should you ask for in ND PASSION ELITE?

We read all 4 approved drawings and 14 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

ND PASSION ELITE utilizes 2.8 acres with 152 homes registered in 5 towers, estimated to cost ₹54.9 crore. With 53.8 homes per acre, it ranks at the 21st percentile of the 784 Bengaluru South projects tracked here (median 77.3). Its declared completion date of 31 December 2018 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2018
Land area11,432 sq m (2.8 acres)
Homes registered152
Towers5

In context

Density53.8 homes per acre
Density in context21st percentile of 785 Bengaluru South projects (median 77.3)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

ND Passion Elite is registered with K-RERA as PRM/KA/RERA/1251/310/PR/180313/000661, and the promoter has declared completion for 31 Dec 2018.

31 Dec 2018

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

ND Passion Elite spans 11,432 sq m (2.82 acres), comprises 5 towers, registers 152 units, and is declared to cost ₹54.92 cr.

₹54.92 cr

declared project cost

2.82acres

11,432 sq m

152units

on the registration

2.25FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

152
Registered units
₹54.9 Cr
Est. construction cost
Units profiled
18
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units152Total inventory registered with K-RERA.
Registered land area11,432 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings5Official tower/wing count in the K-RERA detail page.
Parking disclosed152 total (23 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date29-05-2013

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Elite BLOCK-A73030-
Elite Block-B72929-
Elite Block- C72929-
Elite Block-D73232-
Elite Block-E73232-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 152 official flat/unit rows, matching the 152 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK1171,216.0-2,278.0 sqft467.0-894.0 sqft212
2BHK191,028.0-2,278.0 sqft400.0-1,290.0 sqft22
4BHK161,829.0-2,278.0 sqft725.0-921.0 sqft32

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Elite Block-D321,028.0-1,216.0 sqft400.0-1,290.0 sqft32
Elite Block-E321,421.0-1,583.0 sqft547.0-636.0 sqft64
Elite BLOCK-A301,216.0-2,278.0 sqft467.0-894.0 sqft54
Elite Block- C291,421.0-1,829.0 sqft547.0-725.0 sqft58
Elite Block-B291,421.0-2,278.0 sqft563.0-921.0 sqft58
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-G01Elite BLOCK-A03BHK1,421.0 sqft565.0 sqft2
A-G02Elite BLOCK-A03BHK1,216.0 sqft467.0 sqft1
A-G03Elite BLOCK-A03BHK1,541.0 sqft618.0 sqft2
A-G04Elite BLOCK-A03BHK1,421.0 sqft565.0 sqft2
A-101Elite BLOCK-A13BHK1,463.0 sqft577.0 sqft2
A-102Elite BLOCK-A13BHK1,216.0 sqft501.0 sqft1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,484 sqft — large-format homes (3BHK-and-up territory), not compact stock. This is a large, multi-tower township — 152 homes across 5 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 152 parking spaces for 152 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~593 sqft per home; across all 152 homes that is ~73% of the plot — the undivided shares sum to less than the plot area.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

4 of 14 compliance document slots are filed as Not Applicable; the remaining 10 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2018, extended (Section 6 Extension) to 31 Dec 2019 — both dates have passed with no OC on file. The extension on file was granted on 22 Jun 2022 (K-RERA extension no. EX/PRM/KA/RERA/1251/310/PR/220622/000661) — it has been used, its deadline has also passed, and no further extension is recorded.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (39 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Sreenath R Kartha vs ND PASSION ELITEDirect the respondents to pay the complainants compensation for inordinate delay in handing over the physical possession of residential flat No. G01 B Block as mentioned in facts of complaint aboveAUTHORITY26/07/2024
SUNIL PUTTY vs ND DEVELOERS PVT LTDCompletion / OC of the apartment and compensationAUTHORITY25/06/2022
KANCHAN ROY vs ND DEVELOERS PVT LTDCompensation as claimed in complainant factsAUTHORITY25/06/2022
Debashis Mohanty vs ND DEVELOERS PVT LTDND Elite project with OC and compensationAUTHORITY25/06/2022
Soya Joseph vs ND DEVELOERS PVT LTDPossession of Flat with CompensationAUTHORITY25/06/2022
Deepa Nair vs ND DEVELOERS PVT LTDCompensation and refundAUTHORITY25/06/2022
Sreejit Nair vs ND DEVELOERS PVT LTDPossession of Flat by Dec 2019 or CompensationAUTHORITY25/06/2022
Balamurugan J vs ND DEVELOERS PVT LTDTimely delivery of flat and compensationAUTHORITY25/06/2022
manish bhargava vs ND DEVELOERS PVT LTDPossession of Flat Required with compensationAUTHORITY25/06/2022
Mr. MANSURALI. M. FAROQUI vs ND DEVELOERS PVT LTDCompensation and Delivery of ND Passion Elite FlatAUTHORITY25/06/2022
Viraj Nayak vs ND DEVELOERS PVT LTDPossession of flat with compensationAUTHORITY25/06/2022
Rakesh Kumar Verma vs ND DEVELOERS PVT LTDCompensation and Delivery of Flat ND Passion EliteAUTHORITY25/06/2022
Sandeep Kumar Mahapatra vs ND DEVELOERS PVT LTDCompensation Amount and Delivery of the ProjectAUTHORITY25/06/2022
SAI VENKAT KUMAR vs ND DEVELOERS PVT LTDcompensation and possession of the flatAUTHORITY25/06/2022
Haritha Krishna Vijapurapu vs ND DEVELOERS PVT LTDCompleted apartment or full refund compensationAUTHORITY25/06/2022
Sachin Gupta vs ND DEVELOERS PVT LTDTo ensure prompt completion of project otherwise full payment made to promoter with interest to be refundedAUTHORITY25/06/2022
MANISH DUBEY vs ND DEVELOERS PVT LTDProperty Delivery from builder with compensationAUTHORITY25/06/2022
KRISHNA KUMAR.P vs ND DEVELOERS PVT LTDCancel the contract and refund all the money paid till date with interest, along with the financial compensation for the financial lossAUTHORITY25/06/2022
SHUBHASHIS SENGUPTA vs ND DEVELOERS PVT LTDDelivering flat/interestAUTHORITY25/06/2022
AKSHAY T S vs ND DEVELOERS PVT LTDDelivering flat/interest/rentAUTHORITY25/06/2022
SANTOSH SRINIVASAN vs ND DEVELOERS PVT LTDDelivery of Flat & Interest/compensation for delayAUTHORITY25/06/2022
RAKESH A SHETTY vs ND DEVELOERS PVT LTDDelivering flat/interest/rentAUTHORITY25/06/2022
VIRAJ SHETTY vs ND DEVELOERS PVT LTDDelivering flat / interest / rentAUTHORITY25/06/2022
MONISH GANDHI vs ND DEVELOERS PVT LTDDelivering flat/interest/rentAUTHORITY25/06/2022
T JANAKIRAM vs ND DEVELOERS PVT LTDDelivering Flat/Interest/RentAUTHORITY25/06/2022
MANIGANDAN P G vs ND DEVELOERS PVT LTDDelivering flat/Interest/Rent/Pre-EMI DuesAUTHORITY25/06/2022
VIJAYALAXMI HIREMATH vs ND DEVELOERS PVT LTDSaleconsideration/deliveryofflat/costofproceedingsAUTHORITY25/06/2022
ANUPAMA RAMESH vs ND DEVELOERS PVT LTDDelay in delivery; Rental compensation for delay; 10% interest per annum on total sale consideration paid to the RespondentAUTHORITY25/06/2022
POORNIMA MURTHY vs ND DEVELOERS PVT LTDDelivering flat/interest/rentAUTHORITY25/06/2022
SATISH SANKARAN vs ND DEVELOERS PVT LTDNon delivery of flat/rental compensation/ interest of 10 percent on total sale consideration.AUTHORITY25/06/2022
ANJALI SHARAN AND RITESH RAUSHAN vs ND DEVELOERS PVT LTDAs per "Interim Prayer" in "Facts of Complaint"AUTHORITY25/06/2022
MAINAK GHOSH vs ND DEVELOERS PVT LTDDELIVERY OF FLAT AND PAYMENTS OF EMIS DEFALTED WITH FULL COMPENSATION DUE TO LOSS OF INTEREST AND RENTSAUTHORITY25/06/2022
NABARUN D PURKAYASTHA AND MEGHNA D PURKAYASTHA vs M.K.K DURANI AND MRS. AYESHA SULTANADelivering flat/interest/rentAUTHORITY25/06/2022
CHIRENJEET JAGANNATH vs ND DEVELOERS PVT LTDFlat Delivery / Interest CompensationAUTHORITY25/06/2022
SRAJAN TIWARI vs ND DEVELOERS PVT LTDDelay in Delivery of Flat/ Rental Compensation/ 10% interest on Total Sale consideration paid to the respondantAUTHORITY25/06/2022
K VIMALKUMAR vs ND DEVELOERS PVT LTD SANDEEP .S N. SRINIVAS REDDY JAYALAKSHMI REDDYRERA Compensation for Builder Share Attached in this application.AUTHORITY24/05/2024
C MOSES vs ND DEVELOERS PVT LTD SANDEEP S N SRINIVAS REDDY JAYALAKSHMI REDDYRERA Compensation for Builder Share Attached in this applicationAUTHORITY23/05/2024
J RUBY GRACE vs ND DEVELOERS PVT LTD SANDEEP S N SRINIVAS REDDY JAYALAKSHMI REDDYRERA Compensation for Builder Share Attached in this applicationAUTHORITY23/05/2024
BRAHMA KUMAR JWALENDRA vs ND DEVELOPERS PVT LTD AND 3 OTHERSTo complete the residential flat bearing No. D204, An interest of 18% per annum on total amount paid to till date, handover possession, Rs. 35,000/- towards litigation expenses,Cost of the proceedingsAUTHORITY13/06/2024

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (36 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190822/0003713
22-08-2019
Villa C-15: wanted to execute sale agreement as per initial agreement.ND AROUND THE MANGOES (another project by this promoter)DISPOSED AUTHORITY
CMP/190924/0004248
24-09-2019
Delivery date as mentioned in Sale Agreement of my flat no. D303 of ND Passion Elite is expired and possession of my flat D303 has not been given to me yet.ND PASSION ELITEDISPOSED AUTHORITY
CMP/190924/0004288
24-09-2019
Delay in possession of ND Passion elite projectND PASSION ELITEDISPOSED AUTHORITY
CMP/190924/0004294
24-09-2019
Delayed possession of flat in ND Passion Elite Apt projectND PASSION ELITEDISPOSED AUTHORITY
CMP/190924/0004300
24-09-2019
Delay in Handover of ND Passion Elite FlatsND PASSION ELITEDISPOSED AUTHORITY
CMP/190926/0004239
26-09-2019
Delivery deadline delayed for apartment D601ND PASSION ELITEDISPOSED AUTHORITY
CMP/190926/0004324
26-09-2019
Delay in possession of E101 flat in ND Passion ELiteND PASSION ELITEDISPOSED AUTHORITY
CMP/190928/0004332
28-09-2019
Delay in possession and compensationND PASSION ELITEDISPOSED AUTHORITY

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectVERNEKAR ASSOCIATES-2004Karnataka 560095, bangalore
Structural engineer. ISA Structural Studio---

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹36.1 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: UNITED BANK OF INDIA BTM LAYOUT (IFSC UBIN0556521, a/c …0121). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload from Jul 2017.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Electronic City5 km
Bellandur–Marathahalli belt6 km
MG Road / city centre11 km
Whitefield IT hub13 km
Outer Ring Road / Manyata17 km
Kempegowda Int'l Airport34 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

4approved drawings on file
14other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 4 approved sheets are the same drawings the builder filed to get ND PASSION ELITE approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Nd Develoers.

Other RERA-registered projects in Singasandra

Major developers building in Singasandra

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in ND Passion Elite?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026