Bangalore/Project record

K-RERA · the public record

SHREESHA ENCLAVE

· KAMALAKSHA BANGERA

Is this the right project?
Which unit should you choose?

Read the free RERA facts below. For help choosing a unit or comparing a price, select a report.

See the report before you buy

See the findings, not just a list of checks.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project X-Ray sample ↗
29registered unitsK-RERA registration · read 16 Jul 2026

Free project details

Registration read 16 Jul 2026

Registered units and project size

Filed categories, unchanged · K-RERA registration · read 16 Jul 2026

The whole registration

0.2registered acres

138.9registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for SHREESHA ENCLAVE

K-RERA · PRM/KA/RERA/1257/334/PR/200103/003115

Project facts and comparisons

On the register

Land area845 sq m (0.2 acres)
Homes registered29
Tower/wing entries1

In context

Density138.9 homes per acre
Density in context88th percentile of 4932 projects in this register (median 81.9)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units29Total inventory registered with K-RERA.
Registered land area845 sqmThe land area attached to this K-RERA registration.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)19Separate filed counts; these categories may overlap and are not added together.
Open-parking field3Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date01-11-2019

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
SHREESHA ENCLAVE32919-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 29 official flat/unit rows, matching the 29 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK2047.5-54.3 sqm3.4-4.1 sqm15 (5 with 0)
1BHK827.7-33.5 sqm2.0-2.5 sqm4 (4 with 0)
COMMERCIAL113.7 sqm1.1 sqm0 (1 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
SHREESHA ENCLAVE2913.7-54.3 sqm1.1-4.1 sqm19 (10 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
B01SHREESHA ENCLAVE02BHK48.0 sqm3.4 sqm0
B02SHREESHA ENCLAVE02BHK48.6 sqm3.5 sqm0
B03SHREESHA ENCLAVE01BHK27.7 sqm2.0 sqm0
B04SHREESHA ENCLAVE01BHK29.5 sqm2.1 sqm0
B05SHREESHA ENCLAVE02BHK49.9 sqm3.5 sqm0
B06SHREESHA ENCLAVE02BHK48.3 sqm3.4 sqm0

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

4 of 19 compliance document slots are filed as Not Applicable; the remaining 15 slots have usable uploaded filings.

✓ Completion certificate (OC) is on file.

Approval documents

Electricity (BESCOM/ESCOM)Not identified in the document list
Water & sewage (BWSSB/KWSSB)Not identified in the document list
Fire NOCDocument listed: Fire Force Department
Pollution control (KSPCB)Document listed: KSPCB
Environmental clearanceNot identified in the document list
Airport Authority height clearanceNot identified in the document list

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectER. ATHMACHARAN J-1996balmatta, Mangalore
Structural engineerANAND BHAT---

Financials & Construction Progress

Financial disclosures

RERA filing

No quarterly financial disclosures on record — expected for a project that's already received its completion certificate and stopped filing quarterly updates after handover.

Declared construction cost ÷ registered units averages to ₹17.2 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: Karnataka Bank Ltd. BALMATTA ROAD (IFSC KARB0000492, a/c …1401). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest of the listed job hubs is about 2 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
Bellandur–Marathahalli belt2 km
Whitefield IT hub6 km
MG Road / city centre10 km
Electronic City12 km
Outer Ring Road / Manyata13 km
Kempegowda Int'l Airport28 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Kamalaksha Bangera.
Kamalaksha Bangera has 2 projects registered in Bangalore.

Other projects by this builder in Bangalore

Other RERA-registered projects in Marathahalli

Major developers building in Marathahalli

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 16 Jul 2026. Document and inventory dates are shown in their sections.