RERA Property Intelligence Report · Preview

Skylark Dasos

Royaume Builders and Promoters · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/180627/001922

The Drawings Report · ₹4,999

Which flat should you ask for in Skylark Dasos?

We read all 7 approved drawings and 34 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

Skylark Dasos covers 26,000 sq m (6.4 acres) and includes 472 apartments across 4 towers with an estimated project cost of ₹226.7 crore. At 73.5 homes per acre it sits at the 46th percentile of 1118 Bengaluru East projects on this register (median 75.7). Its declared completion date of 31 December 2022 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2022
Land area26,000 sq m (6.4 acres)
Homes registered472
Towers4
Unit mix472 × Apartment

In context

Density73.5 homes per acre
Density in context46th percentile of 1118 Bengaluru East projects (median 75.7)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Skylark Dasos is registered with K-RERA as PRM/KA/RERA/1251/446/PR/180627/001922, and the promoter has declared completion for 31 Dec 2022.

31 Dec 2022

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Skylark Dasos spans 26,000 sq m (6.42 acres), comprises 4 towers, registers 472 units, and is declared to cost ₹226.75 cr.

₹226.75 cr

declared project cost

6.42acres

26,000 sq m

472units

on the registration

2.249FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

472
Registered units
₹226.7 Cr
Est. construction cost
Units profiled
41
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units472Total inventory registered with K-RERA.
Official carpet area36,914 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area26,000 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.249Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings4Official tower/wing count in the K-RERA detail page.
Parking disclosed485 total (29 open) — 1.03 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date01-03-2018

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Apartment472100%36,914 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower A OR Building 1135582-
Tower B OR Building 214104104-
Tower C OR Building 3B17152133-
Tower D OR Building 3A17161166-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 433 official flat/unit rows vs 472 registered units disclosed above; ask why the row count differs. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3BHK313895.0-1,110.0 sqft363.0-444.0 sqft313
2 BHK104693.0-746.0 sqft285.0-301.0 sqft104
1BHK16480.0 sqft195.0 sqft0 (16 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower D OR Building 3A161895.0-1,110.0 sqft363.0-444.0 sqft161
Tower C OR Building 3B152895.0-1,110.0 sqft363.0-444.0 sqft152
Tower B OR Building 2104693.0-746.0 sqft285.0-301.0 sqft104
Tower A OR Building 116480.0 sqft195.0 sqft0 (16 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-002Tower A OR Building 101BHK480.0 sqft195.0 sqft0
A-003Tower A OR Building 101BHK480.0 sqft195.0 sqft0
A-004Tower A OR Building 101BHK480.0 sqft195.0 sqft0
FirstTower A OR Building 111BHK480.0 sqft195.0 sqft0
SecondTower A OR Building 121BHK480.0 sqft195.0 sqft0
ThirdTower A OR Building 131BHK480.0 sqft195.0 sqft0

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~915 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 472 homes across 4 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 485 parking spaces for 472 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~370 sqft per home; across all 472 homes that is ~62% of the plot — the undivided shares sum to less than the plot area.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

14 of 34 compliance document slots are filed as Not Applicable; the remaining 20 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2022, extended (Covid Extension) to 30 Sep 2023 — both dates have passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (BESCOM)
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (54 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Sandeep Panat Sethumadhavan vs Royaume Builders and Promoters Private LimitedRERA to take strong action against the promoter for not completing the project within the given deadline and take necessary steps for refund of the invested amount in the project by the buyerAUTHORITY31/08/2024
Bijumohan Ravindranath vs Royaume Builders and Promoters Private LimitedI need the entire amount paid to be refunded including all the interest and other applicable lawful compensationsAUTHORITY31/08/2024
Ravi Hemani vs Royaume Builders and Promoters Private LimitedI request RERA to take action and help me and other buyers get their hard - earned money back along with some additional amount for all of these years.AUTHORITY31/08/2024
Vishal Sahni vs SKYLARK DASOSBooking Amount to be get refunded.AUTHORITY31/07/2025
Abhishek Upadhya M vs Royaume Builders and Promoters Private LimitedI need the entire Principal plus interest to be refunded to me , plus lawful compensation for increase in market prices during the delay period of the construction.AUTHORITY30/06/2025
Vasantha Rani Beesetti vs Royaume Builders and Promoters Private LimitedRefund of my booking / expression of interest amount of Rs2lakhs along with compensationAUTHORITY29/11/2025
Ravikumar Barika Sudha vs Royaume Builders and Promoters Private LimitedRefund with interestAUTHORITY29/11/2025
SEEMA MANDLEKAR vs Royaume Builders and Promoters Private LimitedREFUND OF AMOUNT WITH INTERESTAUTHORITY29/11/2025
R S JAISWAL vs Royaume Builders and Promoters Private LimitedREFUND OF AMOUNT WITH INTERESTAUTHORITY29/11/2025
Nibedita Parhi vs Royaume Builders and Promoters Private LimitedRefund with interest in line with agreement.AUTHORITY29/11/2025
Jayadeep Bantwal vs Royaume Builders and Promoters Private LimitedRefund the money with interest as I have taken it from PF for dream house, but now ended up with loss due to builder's ignorance to preserve partial construction intact for 17 floors to build.AUTHORITY29/11/2025
Sneha Rao vs Royaume Builders and Promoters Private LimitedReturn of amount and compensation with interestAUTHORITY29/11/2025
JASMINE JOSEPH vs Royaume Builders and Promoters Private LimitedRefund the amount paid to Skylark dasos with interestAUTHORITY29/11/2025
Ram Kumar vs Royaume Builders and Promoters Private LimitedSought RERA support to get the refund from promoter along with interest and penaltyAUTHORITY29/11/2025
Mallikarjun vs Royaume Builders and Promoters Private Limitedcompensation to our loss & return our money with bank interest since Builder is not competent to complete the project. please take action on the builderAUTHORITY29/11/2025
N C Subramaniyan vs Royaume Builders and Promoters Private LimitedExpedite the refund.AUTHORITY29/11/2025
Dubagunta Venkata Rajasekhar vs Royaume Builders and Promoters Private Limitedo repay the entire amount of Rs. 22,70,000/- which is paid towards first stage of the project and to pay the amount paid to the bank as EMI along with the interest to the tune of Rs. 12,15,120/-.AUTHORITY27/07/2026
Meenakshi C vs Royaume Builders and Promoters Private LimitedRefund the monies paid till date in fullAUTHORITY25/06/2024
Varun Kumar G vs Royaume Builders and Promoters Private LimitedPlease order builder to refund complete amount paid to builder including downpayment, amount disbursed from bank with interest till date.AUTHORITY25/06/2024
MR SIBY VETTUVAYALLI JACOB & ANOTHER vs M/S.ROYAUME BUILDERS AND PROMOTERSRETURN OF AMOUNT PAID WITH INTERESTAUTHORITY24/02/2025
Praveen Dhang vs Royaume Estates Private LimitedRequesting RERA to help to get the refund of paid amount with interestAUTHORITY23/09/2024
Shashikala j vs ROYAUME BUILDERS AND PROMOTERS PVT LTDRefundAUTHORITY22/07/2025
UDAY DUBEY vs Royaume Builders and Promoters Private LimitedI am looking for my refund of money with Interest and other compensation.AUTHORITY22/07/2024
GIRISH MATTI vs Royaume Builders and Promoters Private LimitedI'm looking for my money paid with interest and penalty according to the latest land prices in that area as the builder has cheated me!AUTHORITY22/07/2024
Cristina Maskarene vs Royaume Builders and Promoters Private LimitedRefund of booking money 9lakhs and 23 lakhs bank loan disbursed so far with loan interest paid till date of approx 6 lakhs. Approx 40 lakhs refund requiredAUTHORITY22/07/2024
SHABANA AZMEE vs Royaume Builders and Promoters Private LimitedRefund with compensationAUTHORITY22/07/2024
Abhilash A vs Royaume Builders and Promoters Private LimitedPlease help on getting the refund of my paid money along with interest paid so far.AUTHORITY22/07/2024
K ANIL KUMAR vs Royaume Builders and Promoters Private LimitedProject to restart immediately or compensation for the delay causedAUTHORITY22/07/2024
A P PRAVEEN KUMAR vs Royaume Builders and Promoters Private LimitedTotal amount refunds along with the choice of service in case he starts construction in future interest as per as present bank rAUTHORITY22/07/2024
Naveen Reddy Mandalla & Navya Reddy vs Naveen Reddy Mandalla & Navya ReddyREFUND OF ENTIRE AMOUNT ALONG WITH INTEREST AS PER RERAAUTHORITY22/07/2024
Kaleemullah kalkeri vs Skylark DasosI request K - RERA to help in getting my refund with applicable interest, ThankyouAUTHORITY19/08/2024
VIMAL KUMAR MIDDHA vs Royaume Builders and Promoters Private LimitedNeed Refund of our Invested Amount with Interest.AUTHORITY19/08/2024
Niraj Kumar Gupta vs Skylark DasosSupport on refund and compensation due to severe lossAUTHORITY19/08/2024
Vinodkumar Boniface vs Royaume Builders and Promoters Private LimitedRefund with compensationAUTHORITY17/10/2025
Christopher Blake vs SKY LARK DASOSIn my complaint I have sought remedy under section 18 of The Real Estate (Regulation and Development) Act, 2016 whereby I have sought for returning of funds invested with builder along with interest.AUTHORITY15/05/2025
STANLEY A vs SKYLARK DASOSRequesting RERA to help me get my Refund back at the earliest to settle my Home Loan which i took for buying a flat in this project. Since 3 years there is no progress on this project.AUTHORITY14/06/2024
DEEPAK BHASIN vs SKYLARK DASOSDirect the builder legally to restart the project & provide status of the project to RERA & investors on monthly basis to assure completion before RERA timeline, else provide full refund immediately.AUTHORITY14/06/2024
Bhagya S Nair vs Royaume Builders and Promoters Private LimitedRequest RERA to intervene and instruct builder to give full refund including the interest on the housing loan paid by me.AUTHORITY13/12/2025
Abhinav Shaurya vs Royaume Builders and Promoters Private LimitedI would like the builder to return my booking amount which he promised to return in 90 days in Aug 2018.AUTHORITY13/12/2025
Gobi Krishnan Arunachalam vs Royaume Builders and Promoters Private LimitedRefund amount paid along with interest as per RERA guidelinesAUTHORITY13/12/2025
DEBABRAT PANDA vs Royaume Builders and Promoters Private LimitedRefund or My HomeAUTHORITY12/08/2024
Kumar Rakesh vs Royaume Builders and Promoters Private LimitedNeed return of my invested amount with interest and compensationAUTHORITY12/08/2024
Janarthan Selvaraj vs Royaume Builders and Promoters Private LimitedNeed Refund of my money paid to builder.AUTHORITY12/08/2024
Joyce Nilima James vs Royaume Builders and Promoters Private LimitedRefund with compensationAUTHORITY12/08/2024
Geo George vs Royaume Builders and Promoters Private LimitedReturn of the paid amount to the buider along with intrestAUTHORITY12/08/2024
Reshma vs Royaume Builders and Promoters Private LimitedRefund with Compensation at the earliestAUTHORITY12/08/2024
Kency Thomas vs Royaume Builders and Promoters Private LimitedRefund of amount paid to the builder along with interest paid for the loanAUTHORITY10/04/2026
Ivan Delaiah Jabez N vs Royaume Builders and Promoters Private LimitedRefund and Moderate a dialogue between the buyer representatives and the decision makers from Royaume Builders and Promoters PVT Ltd, at Skylark Dasos project managementAUTHORITY07/04/2025
KARAN HEMANTHKUMAR vs Royaume Builders and Promoters Private Limitedorder the builder to return my invested money with interest and debar/blacklist the builder.AUTHORITY06/09/2024
MR CHANDRA SHEKHAR GAJARIA vs M/S.ROYAUME BUILDERS AND PROMOTERS PVT LTDI request K-RERA to help my refund with applicable interest, Thank you.AUTHORITY05/03/2025
Jithesh OK vs Mr. Omar SheriffRERA to put scrutiny of the entire SKYLARK DASOS project and ask them to resume construction or else to refund our hard earned money with interestAUTHORITY03/08/2024
Vikash Kumar Singh vs Royaume Builders and Promoters Private LimitedRefund of Rs 32,10,172 plus compensationAUTHORITY03/01/2025
Reshma vs M/S.ROYAUME BUILDERS AND PROMOTERSRefund with compensation and court expensesAUTHORITY02/08/2025
Sajeev Sasidharan vs Royaume Builders and Promoters Private LimitedRefund the entire paid amount with interest as the builder is not able to complete the project.AUTHORITY01/07/2024

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (12 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190711/0003546
11-07-2019
Refund requested 23 months ago - refund not received yetSkylark DasosDISPOSED AO
CMP/200124/0005285
24-01-2020
For Advance refundSkylark DasosDISPOSED AUTHORITY BENCH5
CMP/200731/0004742
31-07-2020
Booking Amount not getting RefundedSkylark DasosDISPOSED AUTHORITY FULLBENCH
CMP/220118/0008817
18-01-2022
Please refund my booking / expression of interest amountSkylark DasosDISPOSED AUTHORITY FULLBENCH
CMP/220125/0008864
25-01-2022
Construction halted SKYLARK DASOSSkylark DasosDISPOSED AUTHORITY BENCH5
CMP/220208/0008985
08-02-2022
Delay in restarting of Project construction post PandemicSkylark DasosDISPOSED AUTHORITY BENCH5
CMP/220214/0009001
14-02-2022
Refund of amount paid in lieu of purchase of flat no. B-304 at Skylark DasosSkylark DasosDISPOSED AUTHORITY BENCH5
CMP/220324/0009246
24-03-2022
SKYLARK DASOS REFUND NOT YET ISSUED SINCE LAST 3 YEARSSkylark DasosDISPOSED AUTHORITY BENCH5

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹48.0 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC Richmond (IFSC HDFC0000523, a/c …1040). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Outer Ring Road / Manyata5 km
MG Road / city centre12 km
Whitefield IT hub14 km
Bellandur–Marathahalli belt14 km
Kempegowda Int'l Airport16 km
Electronic City24 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

7approved drawings on file
34other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 7 approved sheets are the same drawings the builder filed to get Skylark Dasos approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Royaume Builders.

Other RERA-registered projects in Kothanur

Major developers building in Kothanur

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Skylark Dasos?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026