RERA Property Intelligence Report · Preview

TRU AQUAPOLIS

TRU INFRA PROJECTS AND REALTY · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/040625/007808

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

310
Registered units
₹178.0 Cr
Est. construction cost
Units profiled
33
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units310Total inventory registered with K-RERA.
Official carpet area44,010 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area49,085 sqmUseful scale context when comparing density and project cost.
Registered land area11,306 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~3.78Sanctioned floor-area ratio (≈42,741 sqm sanctioned FAR area ÷ 11,306 sqm land) — higher means a denser vertical build.
Registered towers/wings3Official tower/wing count in the K-RERA detail page.
Parking disclosed310 total (310 covered, 11 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberBBMP/Addl.Dir/JDNORTH/0091/24-25Use this to match the sanctioned drawing set shown by the builder.
Plan approval date08-04-2025
Project start date01-05-2025

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
FLATS310100%31,821 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
TOWER E2412012075.5 m
TOWER F24949475.5 m
TOWER G24969675.5 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 310 official flat/unit rows, matching the 310 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK21494.7-111.2 sqm25.0-32.3 sqm214
4 BHK48138.8-151.6 sqm36.4-42.0 sqm48
1 BHK2431.6 sqm8.3 sqm24
2 BHK2463.1 sqm16.6 sqm24

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
TOWER E12031.6-111.2 sqm8.3-32.3 sqm120
TOWER G9694.7-151.6 sqm25.0-42.0 sqm96
TOWER F9494.7-110.5 sqm25.1-30.0 sqm94
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
E101TOWER E12 BHK63.1 sqm16.6 sqm1
E101ATOWER E11 BHK31.6 sqm8.3 sqm1
E102TOWER E13 BHK111.2 sqm29.7 sqm1
E103TOWER E13 BHK111.0 sqm31.3 sqm1
E104TOWER E13 BHK111.2 sqm31.2 sqm1
E201TOWER E22 BHK63.1 sqm16.6 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~1,105 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 310 homes across 3 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 310 parking spaces for 310 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~28 sqm per home; across all 310 homes that is ~77% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

14 of 31 compliance document slots are filed as Not Applicable; the remaining 17 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (ESCOM/Electricity)
Water & sewage (BWSSB/KWSSB)✓ On file (KWSSB/Water)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

3 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved07-04-2025NOC BWSSB TRU Infra Projects and Realty LLP.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved09-07-2024NOC KSPCB TRU Infra Projects and Realty LLP.pdf
KSPCB- MOEF (Above 50 Acres)Approved30-11-2023NOC MOEF TRU Infra Projects and Realty LLP.pdf
KPTCL- BESCOMApproved27-03-2024NOC BESCOM TRU Infra Projects and Realty LLP.pdf
Fire and SafetyApproved15-06-2024NOC FIRE TRU Infra Projects and Realty LLP.pdf
Airport Authority of IndiaApproved03-01-2024NOC AIRPORT AUTHORITY TRU Infra projects and Realty LLP.pdf
BSNL/Telecommunication DepartmentApproved03-11-2023NOC BSNL TRU Infra Projects and Realty LLP.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantUSHA KIRAN RAYIDI2392162001Hyderabad, Telangana - 500016
EngineerN MANOHARBCCL/BL/3.6/SE-0257/23-242024Bengaluru Urban, Karnataka - 560092
ArchitectBOMMU VEERA NARENDRANATH REDDYCA/2009/458042009Bengaluru Urban, Karnataka - 560066
ContractorTRU DWELLINGS PVT LTD-2019Bengaluru Urban, Karnataka - 560087

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹1.45 Cr collected from buyers, ₹1.45 Cr withdrawn from the project's escrow account.

Construction progress20% → 25% (+5 pts)
Units sold/booked as registered55/310 (18%)
Buyer collections in available QPRs₹16.54 Cr
Escrow withdrawals in available QPRs₹16.54 Cr (1.00x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹57.4 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC KASTURBA GANDHI MARG IFSC Code : HDFC0000009 Pin Code : 560001. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~3 km away — walking/short-hop distance to a major employment hub — a genuine work-near-home location.

LandmarkStraight-line
Whitefield IT hub3 km
Bellandur–Marathahalli belt7 km
Electronic City15 km
MG Road / city centre16 km
Outer Ring Road / Manyata18 km
Kempegowda Int'l Airport28 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Tru Infra.

Other RERA-registered projects in Balagere

Major developers building in Balagere

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in TRU Aquapolis?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026