RERA Property Intelligence Report · Preview

BHAVYA DAZZLE

Bhavya Builders · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/160522/004882

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

168
Registered units
₹55.1 Cr
Est. construction cost
Units profiled
50
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units168Total inventory registered with K-RERA.
Official carpet area11,459 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area23,641 sqmUseful scale context when comparing density and project cost.
Registered land area7,646 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings1Official tower/wing count in the K-RERA detail page.
Parking disclosed185 total (184 covered, 1 open) — 1.10 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberAPA/CC/225/2020-21Use this to match the sanctioned drawing set shown by the builder.
Plan approval date11-10-2021
Project start date11-10-2021

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK2414%1,964 sqm
2 BHK14486%9,495 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
BHAVYA DAZZLE816818527 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 168 official flat/unit rows, matching the 168 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK14464.2-83.9 sqm42.1-55.3 sqm144
3 BHK2468.2-83.9 sqm44.5-56.2 sqm24

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
BHAVYA DAZZLE16864.2-83.9 sqm42.1-56.2 sqm168
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-101BHAVYA DAZZLE12 BHK65.8 sqm43.2 sqm1
A-102BHAVYA DAZZLE12 BHK64.2 sqm43.8 sqm1
A-103BHAVYA DAZZLE13 BHK83.2 sqm56.2 sqm1
A-104BHAVYA DAZZLE12 BHK64.2 sqm42.1 sqm1
B-101BHAVYA DAZZLE13 BHK83.9 sqm55.3 sqm1
B-102BHAVYA DAZZLE12 BHK68.2 sqm44.5 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~734 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a mid-scale project — 168 homes across 1 tower. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 185 parking spaces for 168 homes (~1.1 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~46 sqm per home; across all 168 homes that is ~100% of the plot — a healthy sign: buyers collectively hold close to all the land. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

15 of 43 compliance document slots are filed as Not Applicable; the remaining 28 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Statutory approval status

RERA filing

0 of 5 applicable approvals are on file; still outstanding: Water supply and sewage board, Engineering Department (PWD) for completion of development works, KPTCL- BESCOM, Horticulture department and Fire and Safety. Fire NOC is among them — a high-importance clearance, so confirm it has been granted (not just applied for) before you book.

5 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardTo Be Applied-View NOC
Engineering Department (PWD) for completion of development worksTo Be Applied-View NOC
KPTCL- BESCOMTo Be Applied-View NOC
Horticulture departmentTo Be Applied-View NOC
Fire and SafetyTo Be Applied-View NOC

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantV Ravindra Reddy2045512004Bengaluru Urban, Karnataka - 560102
EngineerS V SATHEESHBCC/BL-3.6/SE-244/2017-182013Bengaluru Urban, Karnataka - 560041
ArchitectSreenivasa RaoCA/2004/345822004Bengaluru Urban, Karnataka - 560070
ContractorBhavya Builders-2007Bengaluru Urban, Karnataka - 560076

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q4): ₹5.91 Cr collected from buyers, ₹2.22 Cr withdrawn from the project's escrow account.

Construction progress98% → 100% (+2 pts)
Units sold/booked as registered166/168 (99%)
Buyer collections in available QPRs₹11.17 Cr
Escrow withdrawals in available QPRs₹6.70 Cr (0.60x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹32.8 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: STATE BANK OF INDIA BNASWADI BENGALURU IFSC Code : SBIN0007986 Pin Code : 560043. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~12 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Whitefield IT hub12 km
Electronic City13 km
Bellandur–Marathahalli belt13 km
MG Road / city centre22 km
Outer Ring Road / Manyata26 km
Kempegowda Int'l Airport38 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Bhavya Builders.
1 complaints on the K-RERA register against Bhavya Builders in Bangalore.

Other RERA-registered projects in Sarjapura

Major developers building in Sarjapura

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Bhavya Dazzle?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 27 Jul 2026