100%construction reportedQ3 2025 filing
27units not bookedof 40 · Q3 2025 filing
31 Dec 2025declared completionK-RERA registration · read 20 Sep 2026

The record · free to read

Registration read 20 Sep 2026

Progress & dates

The timeline on file.

Promoter-reported construction

K-RERA quarterly filings · Q3 2025 to Q3 2025

declared completion

31 Dec 2025

The registered date and a construction update answer different questions. Neither is a confirmation of possession.

K-RERA registration · read 20 Sep 2026

Inventory & scale

What this registration contains.

3 BHK
20
2 BHK
20

Filed categories, unchanged · K-RERA registration · read 20 Sep 2026

The whole registration

0.6registered acres

69.6registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.

From another project · Prestige Park Grove

A larger advertised area. Almost the same carpet area.

In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.

This illustrates the report format. These findings concern the named sample, not this project.

Read the sample report ↗
Prestige Park Grove · Tower 14 comparison · approved sample report
Prestige Park Grove · Tower 14 comparison · approved sample report

The source record

The details behind the headline.

K-RERA · PRM/KA/RERA/1251/309/PR/050924/006999

This project, on the record

The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2025
Land area2,325 sq m (0.6 acres)
Homes registered40
Tower/wing entries1
Unit mix20 × 3 BHK, 20 × 2 BHK

In context

Density69.6 homes per acre
Density in context43rd percentile of 525 Bengaluru North projects (median 75.4)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units40Total inventory registered with K-RERA.
Official carpet area2,723 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area4,830 sqmUseful scale context when comparing density and project cost.
Registered land area2,325 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.48Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)40Separate filed counts; these categories may overlap and are not added together.
Covered-parking field40Separate filed counts; these categories may overlap and are not added together.
Open-parking field0Separate filed counts; these categories may overlap and are not added together.
Garage field40Separate filed counts; these categories may overlap and are not added together.
Approved plan numberBIAAPA/TP01/LAO/SS/18/2012-13Use this to match the sanctioned drawing set shown by the builder.
Plan approval date11-03-2015
Project start date02-02-2024

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
3 BHK2050%1,467 sqm
2 BHK2050%1,256 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
VSS ENCLAVE4404014.4 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 40 official flat/unit rows, matching the 40 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK2055.1-69.3 sqm47.7-59.1 sqm20
3 BHK2067.1-78.8 sqm59.1-65.9 sqm20

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
VSS ENCLAVE4055.1-78.8 sqm47.7-65.9 sqm40
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1VSS ENCLAVE13 BHK78.8 sqm65.9 sqm1
2VSS ENCLAVE13 BHK67.1 sqm59.1 sqm1
3VSS ENCLAVE12 BHK55.1 sqm47.7 sqm1
4VSS ENCLAVE12 BHK61.0 sqm51.5 sqm1
5VSS ENCLAVE12 BHK64.2 sqm53.7 sqm1
6VSS ENCLAVE12 BHK64.6 sqm53.7 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 3 of 28 compliance document slots are filed as under process / not yet usable: Water Permission Letter, Proforma For Sale Deed, KWSSB/Water.

4 additional compliance slots are filed as Not Applicable.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2025 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)Not found in catalog
Fire NOCNot found in catalog
Pollution control (KSPCB)Not found in catalog
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA complaint orders (1 complaint against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Kumar Abhinav vs VSS EnclaveThe Complainant seeks interest for every month of delay from the promised possession date (January 1, 2026) until the date of actual handing over of possession with a valid Occupancy Certificate (OC).AUTHORITY03/08/2026

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Statutory approval status

RERA filing

1 of 2 applicable approvals are on file; still outstanding: Water supply and sewage board. Confirm each has been granted, not merely applied for, before booking.

8 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApplied05-11-2025View NOC
KPTCL- BESCOMApproved08-12-2025BESCOM.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantN K SATISH0235142005Bengaluru Urban, Karnataka - 560050
EngineerARUN KUMAR S. R.BCCL/BL-3.6 /SE-0160/23-242010Bengaluru Urban, Karnataka - 560070
ArchitectG. BHANUMATHYCA/94/167502008Bengaluru Urban, Karnataka - 560070
ContractorM Neelakanta Naidu-2015Bengaluru Urban, Karnataka - 560098

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2025-Q3): ₹2.00 Cr collected from buyers, ₹2.00 Cr withdrawn from the project's escrow account.

Construction progress100% → 100% (+0 pts)
Units sold/booked as registered13/40 (32%)
Buyer collections in available QPRs₹2.00 Cr
Escrow withdrawals in available QPRs₹2.00 Cr (1.00x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹26.4 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: The Shamrao Vithal Co-operative Bank Ltd.. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~14 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Kempegowda Int'l Airport8 km
Outer Ring Road / Manyata14 km
MG Road / city centre22 km
Whitefield IT hub25 km
Bellandur–Marathahalli belt26 km
Electronic City36 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Stature Homes.

Other RERA-registered projects in Chikkajala

Major developers building in Chikkajala

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.