RERA Property Intelligence Report · Preview
FRONTIER SHELTERS · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/171214/001250
The Drawings Report · ₹4,999
We read all 6 approved drawings and 37 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.
One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.
Get it for this project →Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.
Free before you decide: the 14 things to get in writing before you book
Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.
Send the checklist to the family group Read it here →FRONTIER HEIGHTS spans 10,163 sq m (2.5 acres) and comprises 6 towers with 269 registered homes, all as apartments, with an estimated project cost of ₹110.0 crore. With 107.1 homes per acre, it ranks at the 90th percentile of the 1118 Bengaluru East projects tracked here (median 75.7). Its declared completion date of 30 November 2019 has passed; no occupancy certificate is on record.
Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
In context
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
What you can verify free on this page
The official K-RERA filing record, in plain English
Registration and delivery
Frontier Heights is registered with K-RERA as PRM/KA/RERA/1251/446/PR/171214/001250, and the promoter has declared completion for 30 Nov 2019.
30 Nov 2019
declared completion
Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.
Source · K-RERA project register · read 10 Sep 2026
Project scale
Frontier Heights spans 10,163 sq m (2.51 acres), comprises 6 towers, registers 269 units, and is declared to cost ₹110 cr.
₹110 cr
declared project cost
2.51acres
10,163 sq m
269units
on the registration
2.89FAR
sanctioned
Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.
Source · K-RERA project registration · read 10 Sep 2026
🔒 What I’d do as a buyer here · Drawings Report
The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.
Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 269 | Total inventory registered with K-RERA. |
| Official carpet area | 24,136 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Registered land area | 10,163 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.89 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered towers/wings | 6 | Official tower/wing count in the K-RERA detail page. |
| Parking disclosed | 320 total (0 open) — 1.19 spaces/unit | Confirm whether your quoted unit includes an allotted parking space and where it sits. |
| Project start date | 01-03-2017 |
K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| APARTMENT | 266 | 100% | 24,136 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| tower - 1 | 15 | 45 | 44 | - |
| tower - 2 | 15 | 45 | 65 | - |
| tower - 3 | 15 | 60 | 61 | - |
| tower - 4 | 15 | 60 | 58 | - |
| tower - 5 | 15 | 58 | 37 | - |
| club house | 4 | 1 | 55 | - |
K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 268 official flat/unit rows vs 269 registered units disclosed above; ask why the row count differs. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2BHK | 195 | 76.3-80.0 sqft | 35.0-37.0 sqft | 195 |
| 3BHK | 59 | 112.7-132.8 sqft | 51.0-59.0 sqft | 59 |
| 4BHK | 11 | 130.0-132.8 sqft | 58.0-59.0 sqft | 11 |
| COMMERCIAL | 2 | 256.9-509.8 sqft | 114.1-226.4 sqft | 6 |
| NA | 1 | 0.0 sqft | 0.0 sqft | 55 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| tower - 3 | 60 | 76.3-79.4 sqft | 35.0 sqft | 60 |
| tower - 4 | 60 | 76.4-76.4 sqft | 35.0 sqft | 60 |
| tower - 5 | 57 | 113.4-509.8 sqft | 51.0-226.4 sqft | 61 |
| tower - 1 | 45 | 78.3-112.7 sqft | 36.0-54.0 sqft | 45 |
| tower - 2 | 45 | 76.7-80.0 sqft | 35.0-37.0 sqft | 45 |
| club house | 1 | 0.0 sqft | 0.0 sqft | 55 |
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| 1011 | tower - 1 | 1 | 2BHK | 78.3 sqft | 36.0 sqft | 1 |
| 1012 | tower - 1 | 1 | 2BHK | 79.7 sqft | 36.0 sqft | 1 |
| 1013 | tower - 1 | 1 | 3BHK | 112.7 sqft | 54.0 sqft | 1 |
| 1021 | tower - 1 | 2 | 2BHK | 78.3 sqft | 36.0 sqft | 1 |
| 1022 | tower - 1 | 2 | 2BHK | 79.7 sqft | 36.0 sqft | 1 |
| 1023 | tower - 1 | 2 | 3BHK | 112.7 sqft | 51.0 sqft | 1 |
What the numbers tell you
Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.
🔒 Which flat to ask for · Drawings Report
The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.
No litigation declared on this project's K-RERA filing.
All 37 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 30 Nov 2019, extended (Section 6 Extension) to 30 Nov 2020 — both dates have passed with no OC on file. The extension on file was granted on 25 Jan 2023 (K-RERA extension no. EX/PRM/KA/RERA/1251/446/PR/230125/001250) — it has been used, its deadline has also passed, and no further extension is recorded.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
K-RERA complaint orders (64 complaints against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| SUMIT AHUJA AND ANOTHER vs FRONTIER SHELTERS PVT. LIMITED | REQUEST RERA TO ATLEAST HELP ME IN GETTING THE POSSESION OF MY FLAT IN LIVABLE CONDITION AND ALSO THE COMPENSATION FOR 1 YEAR DELAYED ALREADY PROJECT AS PER AGREEMENT. | AUTHORITY | 23/01/2025 |
| VIKRAM BHATTA & ANOTHER vs FRONTIER SHELTERS PVT. LIMITED | Delay Compensation as per RERA | AUTHORITY | 23/01/2025 |
| SURAJ JANARDAN GHARAT vs FRONTIER SHELTERS PVT. LTD . | Please request builder to pay me compensation same as the rent I need to pay due to delayed possesion | AUTHORITY | 21/04/2023 |
| SIDDHARTH KUMAR SRIVASTAVA &JYOTI SRIVASTAVA vs FRONTIER SHELTERS PVT. LTD . | Compensation against the delay in Flat Handover. ***I REPEAT I DO NOT WANT CANCELLATION or REFUND. *** | AUTHORITY | 21/04/2023 |
| RAVI RAJ vs FRONTIER SHELTERS PVT. LTD . | Compensation for delay in posession as per rera rules, compensation for rent being paid due to deplay in possesion, speed up the contruction | AUTHORITY | 21/04/2023 |
| RIMSY SAINI &ROHIT SENGAR vs FRONTIER SHELTERS PVT. LTD . | To provide compensation for delayed project along with rental expense OTHERWISE honor the buyback from respondent along with interest in earliest time possible as per GOI norms. | AUTHORITY | 21/04/2023 |
| ADITHYA BIKRAM MISHRA &DIBYA JYOTI MISHRA vs FRONTIER SHELTERS PVT. LTD . | (i) Direct the respondents to pay delay interest as per Section 16 of the provision of the Karnataka Real Estate Act. legal cost and compensation of Rs. 1500000/- | AUTHORITY | 21/04/2023 |
| MOHIT GUPTA &SADHVI GUPTA vs FRONTIER SHELTERS PVT. LTD . | DELAY INTEREST AND COMPENSATION | AUTHORITY | 21/04/2023 |
| HIMANGSHU LAHKAR vs FRONTIER SHELTERS PVT LTD | refund of Rs. 43,89,123 (Rupees Forty-Three Lakh Eighty-Nine Thousand One Hundred Twenty-Three Only) lakh Ninety-Eight thousand Nine hundred forty-three Only) (i) Paid at the time of booking is Rs. 5, | AUTHORITY | 20/01/2026 |
| ANUSHILA BRAHMA vs FRONTIER SHELTERS PVT. LTD | NEED RERA TO TAKE ACTION AGAINST THE BUILDER AND GET POSSESSION DONE AT THE EARLIEST AND ALSO MAKE THEM PAY THE COMPENSATION FOR THE DELAY | AUTHORITY | 18/04/2023 |
| SOMNATH BANERJEE & TAMASA BHATTACHARYA vs FRONTIER SHELTERS PVT LTD. | Expecting the refund of the amount along with interest, as per legal notice amount claimed with interest is Rs.6,71,835 | AUTHORITY | 16/12/2024 |
| Saurav Khandelwal vs FRONTIER SHELTERS PVT LTD | Return of Booking amout with interest | AUTHORITY | 15/09/2023 |
| ASHISH KUMAR PANDEY vs FRONTIER SHELTERS PVT. LTD. | SEEKING THE DIRECTION TO THE RESPONDENT TO HANDOVER THE POSSESSION OF THE FLAT NO. 5073 FORTHWITH. (B) DIRECT THE RESPONDENTS TO PAY COMPENSATION @ 10 % P.A. ON THE TOTAL AMT PAID TILL DATE. | AUTHORITY | 15/09/2023 |
| Rakesh Kumar Padhiary vs FRONTIER SHELTERS PVT LTD | Compensation as per Rera guidelines and possession at the earliest | AUTHORITY | 15/09/2023 |
| Sandeep Kumar Pradhan vs FRONTIER SHELTERS PVT LTD | COMPENSATION AS PER RERA GUIDELINES AND POSSESSION AS SOON AS POSSIBLE | AUTHORITY | 15/09/2023 |
| Rakesh Kumar Padhiary vs FRONTIER SHELTERS PVT LTD | COMPLETION OF PROJECT AT THE EARLIEST AND PROVIDE COMPENSATION FOR THE DELAY | AUTHORITY | 15/09/2023 |
| Sravankumar Allu vs FRONTIER SHELTERS PVT LTD | please make the builder finish the project and let the builder pay compensation(20000) for my rent | AUTHORITY | 15/09/2023 |
| Anita Roy vs FRONTIER SHELTERS PVT LTD | We request for legal pressure on the builder/developer to speed up the project/ construction process and assist us in getting our flat along with amenities as promised by the builder. | AUTHORITY | 15/09/2023 |
| Nishant Kumar vs FRONTIER SHELTERS PVT LTD | Pressurize Builder to complete the project else make him pay back our hard earned money | AUTHORITY | 15/09/2023 |
| VARUN KUMAR SINGH vs FRONTIER SHELTERS PVT LTD | we request RERA to instruct Builder to handover my flat as soon as possible by giving some time frame, reimbursement of my EMI & Rent to me which i am paying due to delay. please ban this promotor. | AUTHORITY | 15/09/2023 |
| Ananta Das vs FRONTIER SHELTERS PVT LTD | Complainant prays that this Hon'ble Authority may be pleased to direct the respondent developer to complete the project and hand over the flat as agreed by them with interest on delay period | AUTHORITY | 15/06/2026 |
| VIVIEK TRIPATHI vs FRONTIER SHELTERS PVT.LTD | Expedite delivery and compensation for the delay. | AUTHORITY | 14/09/2023 |
| PAYAL BHARGAVA vs FRONTIER SHELTERS PVT. LTD. | Compensation for Delay in Possession | AUTHORITY | 14/09/2023 |
| THIRUMALAI SELVAM vs FRONTIER SHELTERS PVT. LTD. | Compensation for delay in Possession | AUTHORITY | 14/09/2023 |
| JIVESH RANJAN SARKAR vs FRONTIER SHELTERS PVT. LTD. | REQUEST RERA TO ATLEAST HELP ME IN GETTING THE POSSESION OF MY FLAT IN LIVABLE CONDITION AND ALSO THE COMPENSATION FROM MAY 2020 FOR DELAYED PROJECT AS PER AGREEMENT AND UPDATE SOLD INVENTORY. | AUTHORITY | 09/10/2023 |
| Sonam Kumar vs FRONTIER SHELTERS PVT LTD | Refund of my booking amount of Rs.6,21,000.00 along with the interest | AUTHORITY | 08/06/2026 |
| Sapna Chitlangiya vs FRONTIER SHELTERS PVT LTD | (i) Direct the respondents to pay statutory delay interest as per Section 16 of the provision of the Karnataka Real Estate (Regulation and Development) Rules, 2017 r/w provisions of REAL ESTATE (REGUL | AUTHORITY | 08/06/2026 |
| Govinda Raj vs FRONTIER SHELTERS PVT LTD | The project should be completed as soon as possible. I need interest for the delay from July 2022 which committed date according to agreement. | AUTHORITY | 08/06/2026 |
| KUNDA SEKAR vs FRONTIER SHELTERS PVT LTD | DELIVERY OF POSSESSION AND REGISTRARTION OF FLAT NO. 3052 AS PER RERA GUIDELINES | AUTHORITY | 08/06/2026 |
| Ms Chigarapalli Shruthi Reddy vs FRONTIER SHELTERS PVT LTD | Direct the Frontier Shelters Pvt Ltd to refund the amount with interest at SBI MCLR plus 2 percent from 01 April 2020 until refund of amount | AUTHORITY | 08/06/2026 |
| VIKASH SINGH vs FRONTIER SHELTERS PVT LTD | I would like compensation for delay as per RERA rules | AUTHORITY | 07/09/2023 |
| SUSANTA KUMAR vs NOT AN OFFICIAL COPY | Compensation from builder as they agreed to me earlier and speed up the construction pace | AUTHORITY | 07/09/2023 |
| ANUPAM MAJUMDR vs NOT AN OFFICIAL COPY | Compensation for delay in flat handover | AUTHORITY | 07/09/2023 |
| VINAY BANSAL vs FRONTIER SHELTERS PVT LTD | Delay Compensation as per RERA rules | AUTHORITY | 07/09/2023 |
| SAHIL RAJARAM SHENVI KHANDEPARKER vs FRONTIER SHELTERS PVT.LTD. | Compensation for delay and possession with occupancy certificate | AUTHORITY | 07/09/2023 |
| PRITEE KOTIAN vs FRONTIER SHELTERS PVT LTD | Request you to help provide compensation for the rent I am paying and plus the EMI I need to pay to the bank due to this delay. | AUTHORITY | 07/09/2023 |
| BALAKUMAR S vs FRONTIER SHELTERS PVT LTD | Need compensation for the delay in handing over the flat to overcome the financial and mental stress. Flat handover at the earliest. Specifications to be aligned as per the agreement | AUTHORITY | 07/09/2023 |
| PRABHAT KUMAR vs FRONTIER SHELTERS PVT LTD | refund of entire money paid along with stautory interest at the highest MCLR rate Plus 2% as per rule 16, Rs. 15,00,000/- Compensation, Rs. 150000 as legal cost | AUTHORITY | 07/09/2023 |
| MANIKANTA T G vs FRONTIER SHELTERS PVT LTD | Expectation of confirmed possession dates and agreed compensation as per agreement | AUTHORITY | 07/09/2023 |
| VIKAS PANDEY vs FRONTIE SHELTERS PVT. LTD. | Compensation as per RERA rule starting from 01-04-2020 till the delivery of the flat and possession as soon as possible. | AUTHORITY | 07/09/2023 |
| PRATEEK SAXENA vs FRONTIER SHELTERS PVT LTD | A clause in the agreement (20.b) which says that the builder is liable to return the entire amount in case of delay. We need the entire amount to be refunded to us and to the bank along with interest | AUTHORITY | 07/09/2023 |
| Vinod P Hanagand vs FRONTIER SHELTERS PVT LTD | Kindly get into this matter and resolve the issue at the earliest, This builder is big cheater in the market request you to cancel his licence | AUTHORITY | 07/09/2023 |
| Bidisha Das vs FRONTIER SHELTERS PVT LTD | Delay compensation, Pre-EMI Interest and other compensation for financial loss and injury | AUTHORITY | 07/07/2026 |
| Ravi Ranjan vs Frontier Hieghts | Direct Frontier Shelters Pvt Ltd to pay interest for delayed possession at SBI MCLR plus 2 percent from 01 April 2020 until lawful possession with Occupancy Certificate is handed over. | AUTHORITY | 07/07/2026 |
| Rahul Basnotra vs Frontier Hieghts | Help to get Sale Deed, Possession and Interest on delay period (from 31/03/2020 onwards) | AUTHORITY | 07/07/2026 |
| TULASI RAM THOTA vs FRONTIER SHELTERS PVT LTD | Requesting RERA authorities to administer builder to compensate customers for the house loan EMI’s paid and upcoming EMI’s till the flat is given possession with OC | AUTHORITY | 06/04/2023 |
| SHIVANGI GOYAL vs FRONTIER SHELTERS PVT LTD | I sought for a compensation against delay in unit handover. "No Cancellation or Refund" | AUTHORITY | 05/09/2023 |
| Ujjal Roy vs FRONTIER SHELTERS PVT LTD | Completion of Project at the earliest and provide compensation for the delay, or else refund full amount paid with EMI interest and compensation | AUTHORITY | 05/09/2023 |
| Jatinder Pal Singh vs FRONTIER SHELTERS PVT LTD | Compensation from June 2021 to the time they handover the house. | AUTHORITY | 05/09/2023 |
| Hari Krishna Kotigari vs FRONTIER SHELTERS PVT LTD | Expectation of confirmed possession dates and agreed compensation as per agreement. | AUTHORITY | 05/06/2026 |
| Abhinav Shankar vs FRONTIER SHELTERS PVT LTD | Compensation due to delay in possession as per the agreement and RERA act and speed up the construction pace for handover as we are not getting nay response from the developer. | AUTHORITY | 05/06/2026 |
| Sucharitha R vs FRONTIER SHELTERS PVT LTD | Primarily, proper action must be taken on builder for the project completion delay, put pressure to complete the project soon and secondarily compensation for the delay is also sought. | AUTHORITY | 05/06/2026 |
| Prakash Kumar Sinha vs FRONTIER SHELTERS PVT LTD | Compensation for the number of months delayed and the project handover without further delays. | AUTHORITY | 05/06/2026 |
| ASHISH PANDEY vs FRONTIER SHELTERS PVT LTD | refund of 25,60,597/- of PRE-EMI’s from the date of disbursal to 06.04.2024 to May, 2024 as per Loan Statement and Rs. 10,43,273/- paid by complainant along with interest calculated at MCLR + 2% from | AUTHORITY | 05/06/2026 |
| Himanshu Gupta vs FRONTIER SHELTERS PVT LTD | Compensation for the delay in possession, pay interest on the amount paid for delay period, reimburse the additional cost due to delay and expedite the completion and handover of the flat | AUTHORITY | 05/06/2026 |
| Sanjeev Kumar Mishra vs FRONTIER SHELTERS PVT LTD | Compensation for the delay in possession, pay interest on the amount paid for delay period, reimburse the additional cost due to delay and expedite the completion and handover of the flat | AUTHORITY | 05/06/2026 |
| Pranab Sureka vs FRONTIER SHELTERS PVT LTD | Claim for interest on delay period and Pre-EMI | AUTHORITY | 05/06/2026 |
| Biraja Sankar Nayak vs FRONTIER SHELTERS PVT LTD | Please help me to get my flat and get the interest on delay period | AUTHORITY | 05/06/2026 |
| Pragyandipta Mohapatra vs FRONTIER SHELTERS PVT LTD | Please help to get my flat and get the interest on delay period from the builder | AUTHORITY | 05/06/2026 |
| KUNDA SEKAR vs FRONTIER SHELTERS PVT LTD | a) Grant refund of entire amount of Rs.14,48,380/- paid towards Flat No.3051 with interest. b) grant compensation for the delay | AUTHORITY | 05/06/2026 |
| Rashmi H B vs FRONTIER SHELTERS PVT LTD | Complainant prays that this Hon'ble Authority may be pleased to direct the respondent developer to complete the project and hand over the flat as agreed by them with interest for delay period | AUTHORITY | 05/06/2026 |
| Animesh Ghosh vs FRONTIER SHELTERS PVT LTD | Complainant prays that this Hon'ble Authority may be pleased to direct the respondent developer to complete the project and hand over the flat as agreed by them with interest for delay period | AUTHORITY | 05/06/2026 |
| BALAJI K.S. & G. MAHALAKSHMI vs FRONTIER SHELTERS PVT. LTD., | Compensation for the Delays occurred. | AUTHORITY | 04/07/2023 |
| PRABHAT KUMAR vs FRONTIER SHELTERS PVT LTD | Compensation for:- 1. Delay in possession of (Rs 5960 * 12) + 10% 2. Monthly Rs.5960/- till possession 3. Taking more than expected 4. Trapping buyers into false commitment | AUTHORITY | 01/08/2022 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (44 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/191121/0003948 21-11-2019 | Builder cancelled allotment and not provding refund details | FRONTIER HEIGHTS | DISPOSED AO |
| CMP/200304/0005638 04-03-2020 | Veracity in Payment Plan | FRONTIER HEIGHTS | DISPOSED AO |
| CMP/210405/0007863 05-04-2021 | Compensation for delay in possession of flat 2102 | FRONTIER HEIGHTS | DISPOSED AUTHORITY BENCH4 |
| CMP/210407/0007873 07-04-2021 | Refund of the booking amount as not recieved the required approval documents on time for verification on time | FRONTIER HEIGHTS | DISPOSED AUTHORITY FULLBENCH |
| CMP/210410/0007879 10-04-2021 | Need monetary compensation as due to delayed possession | FRONTIER HEIGHTS | DISPOSED AUTHORITY FULLBENCH |
| CMP/210411/0007880 11-04-2021 | Compensation due to delay in possession and speed up the construction pace | FRONTIER HEIGHTS | DISPOSED AUTHORITY FULLBENCH |
| CMP/210412/0007882 12-04-2021 | DELAY IN POSSESION / COMPENSATION FOR DELAY IN POSSESION | FRONTIER HEIGHTS | DISPOSED AUTHORITY FULLBENCH |
| CMP/210414/0007890 14-04-2021 | Compensation due to delay in the project | FRONTIER HEIGHTS | DISPOSED AUTHORITY FULLBENCH |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | TEAM 2 | - | 1975 | NO 302 EMBASSSY CHAMBERS, NO 5 VITTAL MALLYA ROAD BANGALORE |
| Contractor | SV CONSTRUCTIONS | - | 1997 | NO 3574 2ND FLOOR, SUGAMA NAGAR OPP DLF NEW TOWN BEGUR |
| Structural engineer | SAI KUMARI T P | - | - | - |
⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹40.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.
RERA 70% project account is on file: HDFC KORAMANGALA (IFSC HDFC0000053, a/c …8301). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
K-RERA has 1 project-photo upload.
These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.
The nearest major job hub is ~5 km away — a manageable everyday commute to a major job hub.
| Landmark | Straight-line |
|---|---|
| Bellandur–Marathahalli belt | 5 km |
| Electronic City | 6 km |
| MG Road / city centre | 12 km |
| Whitefield IT hub | 12 km |
| Outer Ring Road / Manyata | 18 km |
| Kempegowda Int'l Airport | 34 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.
The approved drawings
Everything above is on this page already, free, from the government record. The drawings are different: the 6 approved sheets are the same drawings the builder filed to get FRONTIER HEIGHTS approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.
What that turns up — from other projects’ filings:
ATS Knightsbridge · Sector 124, Noida
You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.
Oberoi Elysian · Goregaon East, Mumbai
“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.
Godrej Aristocrat · Sector 49, Gurugram
Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.
Prestige Camden Gardens · Thanisandra, Bengaluru
The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.
Want this project read from its filed drawings?
This page is the free K-RERA filing summary. For FRONTIER HEIGHTS, one reading of it goes further. Which flat should I ask for? — what the approved drawings and filed papers say about the flats, the parking, the approvals, and what to get in writing before you sign. That is the Drawings Report. See a real one first:
Drawings Report sample: Prestige Camden Gardens → · browse all sample reports →
Payment is confirmed automatically. The Drawings Report is 1 working day. We email the link, so you can close the tab.
Drawings Report · ₹4,999
Every drawing on file, read — which flat to ask for · 1 working day
Not useful to your decision? Full refund — no questions asked.
Paying from outside India? Pay $59 (Drawings Report) via PayPal, or email hello@quietlist.in for a card invoice. Prefer to talk first, or have a portfolio to check? Same address. An information aid for your own due diligence, not legal or investment advice.
Free · Watch this project
We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.
Built by Frontier Shelters.
Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.