RERA Property Intelligence Report · Preview

SHRIRAM 107SOUTHEAST - PHASE 3

Shriprop Living Space · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/140222/004708

The Drawings Report · ₹4,999

Which flat should you ask for in SHRIRAM 107SOUTHEAST - PHASE 3?

We read all 7 approved drawings and 46 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

All 1,055 flats sold in the latest filing · 43% reported construction progress.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
2
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

SHRIRAM 107SOUTHEAST - PHASE 3 occupies 5.7 acres with 9 towers and 1,055 units, including 3 BHK, 2 BHK - Type 1, 2 BHK - Type 2, and 2 BHK - Type 3 apartments, costing ₹199.5 crore. At 184.2 homes per acre it sits at the 99th percentile of 470 Anekal projects on this register (median 75.8). Its declared completion date is 7 January 2027; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion7 January 2027
Land area23,181 sq m (5.7 acres)
Homes registered1,055
Towers9
Unit mix264 × Apartments - 2 BHK - Type 1, 264 × Apartments - 2 BHK - Type 2, 527 × Apartments - 3 BHK - Type 3

In context

Density184.2 homes per acre
Density in context99th percentile of 470 Anekal projects (median 75.8)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Shriram 107southeast - Phase 3 is registered with K-RERA as PRM/KA/RERA/1251/308/PR/140222/004708, and the promoter has declared completion for 7 Jan 2027.

7 Jan 2027

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Shriram 107southeast - Phase 3 spans 23,181 sq m (5.73 acres), comprises 9 towers, registers 1,055 units, and is declared to cost ₹199.46 cr.

₹199.46 cr

declared project cost

5.73acres

23,181 sq m

1,055units

on the registration

74574.0FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

Promoter record

What else is this promoter on record for?

Shriprop Living is the promoter of record on 2 projects registered with K-RERA, 1 of which is past its declared completion date on the register.

2projects

registered with K-RERA

1past declared date

on the register

100%

average construction reported

Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.

Source · K-RERA register, all projects · read 10 Sep 2026

Construction

How much construction has been reported?

Shriram 107southeast - Phase 3 reports 43% construction progress in its most recent quarterly filing with K-RERA.

43%

reported construction progress

The percentage the promoter filed at the last quarterly report. It is a filed figure, not an inspection, and it can lag site conditions between filings.

Source · K-RERA quarterly progress report · read 10 Sep 2026

Sales

How much has been booked?

Shriram 107southeast - Phase 3 reports 1,055 of 1,055 units booked in its most recent quarterly filing with K-RERA, about 100%.

100%booked

1,055 of 1,055 units

Booked share as the promoter filed it at the last quarterly report; this is the filed position, not current availability.

Source · K-RERA quarterly progress report · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

1,055
Registered units
₹199.5 Cr
Est. construction cost
Units profiled
53
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units1,055Total inventory registered with K-RERA.
Official carpet area55,316 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area80,324 sqmUseful scale context when comparing density and project cost.
Registered land area23,181 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~3.22Sanctioned floor-area ratio (≈74,574 sqm sanctioned FAR area ÷ 23,181 sqm land) — higher means a denser vertical build.
Registered towers/wings9Official tower/wing count in the K-RERA detail page.
Parking disclosed1,055 total (965 covered, 90 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberSTRPPA/TP/CC/477/2018-19Use this to match the sanctioned drawing set shown by the builder.
Plan approval date27-01-2021
Project start date20-01-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Apartments - 2 BHK - Type 126425%43 sqm
Apartments - 2 BHK - Type 226425%46 sqm
Apartments - 3 BHK - Type 352750%57 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
1A1411711714.65 m
11411711714.65 m
21411711714.65 m
31411711744.65 m
41411711744.65 m
51411711744.65 m
61411711744.65 m
131411811844.65 m

Showing first 8 of 9 tower/wing rows.

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 1,055 official flat/unit rows, matching the 1,055 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK52844.3-47.8 sqm0.0 sqm528
3 BHK52759.0 sqm0.0 sqm527

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
1311844.3-59.0 sqm0.0 sqm118
1411844.3-59.0 sqm0.0 sqm118
111744.3-59.0 sqm0.0 sqm117
1A11744.3-59.0 sqm0.0 sqm117
211744.3-59.0 sqm0.0 sqm117
311744.3-59.0 sqm0.0 sqm117
411744.3-59.0 sqm0.0 sqm117
511744.3-59.0 sqm0.0 sqm117
611744.3-59.0 sqm0.0 sqm117
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
1A.00.011A03 BHK59.0 sqm0.0 sqm1
1A.00.021A03 BHK59.0 sqm0.0 sqm1
1A.00.031A02 BHK44.3 sqm0.0 sqm1
1A.00.041A02 BHK44.3 sqm0.0 sqm1
1A.00.071A02 BHK47.8 sqm0.0 sqm1
1A.00.081A02 BHK47.8 sqm0.0 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~566 sqft — compact homes (1–2BHK / studio territory), not compact stock. This is a large, multi-tower township — 1055 homes across 9 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 1,055 parking spaces for 1,055 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~0 sqm per home; across all 1,055 homes that is ~0% of the plot — the undivided shares sum to less than the plot area.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

⚠ 1 of 46 compliance document slots are filed as under process / not yet usable: Certificate from Chartered Account.

12 additional compliance slots are filed as Not Applicable.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA complaint orders (3 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
GAGANDEEP GILL vs SHRIPROP LIVING SPACE PRIVATE LIMITEDRefund of payment made to developer and compensation for delay in payment.AUTHORITY29/11/2023
PRATHEWRAJ M vs SHRIRAM 107 SOUTHEAST PHASE 3REFUND OF BOOKING AMOUNT FROM THE BUILDERAUTHORITY24/07/2024
Anandh N vs SHRIPROP LIVING SPACE PRIVATE LIMITEDKindly have a look into the matter to return my advance amount Rs. 105000/-AUTHORITY01/06/2023

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Complaints on this project's K-RERA page (7 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/191106/0004338
06-11-2019
Refund of amount after booking cancellationSHRIRAM 107 SOUTHEAST (another project by this promoter)DISPOSED AO
CMP/200813/0006019
13-08-2020
Refund of Rs.266333/- (two lacs sixty six thousand three hundred thirty three) paid to builder.SHRIRAM 107 SOUTHEAST (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/200927/0006685
27-09-2020
Based on wrong advertisement of Project at the time of sales Asked for Cancellation and refund amount But Cancellation request has never been acceptedSHRIRAM 107 SOUTHEAST (another project by this promoter)DISPOSED AUTHORITY BENCH5
CMP/220118/0008824
18-01-2022
Request for Refund of Booking AmountSHRIRAM 107 SOUTHEAST - PHASE 2 (another project by this promoter)DISPOSED AUTHORITY BENCH5
CMP/220206/0008968
06-02-2022
False Advertisement and Misleading by Shriram Properties Pvt ltdSHRIRAM 107 SOUTHEAST - PHASE 2 (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/220401/0009305
01-04-2022
Refund booking amountSHRIRAM 107SOUTHEAST - PHASE 3DISPOSED AUTHORITY BENCH6
CMP/221220/0010491
20-12-2022
BOOKING AMOUNT OF RS.50000 NOT REFUNDINGSHRIRAM 107 SOUTHEAST (another project by this promoter)DISPOSED AUTHORITY BENCH6

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

3 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved01-08-2018Gramapanchay Water NOC 01082018 (1).pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved08-06-2022NOC KSPCB Expand CFE EXP dated 28 Sep 22 107 South (1).pdf
KSPCB- MOEF (Above 50 Acres)Approved30-04-2022NOC SEIAA dated 30 April 2022 Pages 12 of 12 (1).pdf
KPTCL- BESCOMApproved01-01-2021BESCOM01012021 (1).pdf
Fire and SafetyApproved03-12-2021Revised NOC Fire Force Dept dated 19 January 2021 (1).pdf
Airport Authority of IndiaApproved03-12-2021Iconica Projects Airport NOC3122021 (1).pdf
BSNL/Telecommunication DepartmentApproved15-11-2021BSNL NOC15112021 (1).pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantVivek Gupta5068872017Bengaluru Urban, Karnataka - 560003
EngineerArun NadigBCC/BL 3.6/E – 4059/14-152015Bengaluru Urban, Karnataka - 560001
ArchitectBiswarup SarangiCA/2020/1197182015Bengaluru Urban, Karnataka - 560043
ContractorSumukha Enterprises-2019Bengaluru Urban, Karnataka - 562107

Builder track record

RERA filing

Shriprop Living has 2 other K-RERA-registered projects in our records (average reported construction progress 100%). 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹30.52 Cr collected from buyers, ₹22.94 Cr withdrawn from the project's escrow account.

Construction progress38% → 43% (+5 pts)
Units sold/booked as registered1055/1055 (100%)
Buyer collections in available QPRs₹107.41 Cr
Escrow withdrawals in available QPRs₹75.14 Cr (0.70x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹18.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: HDFC BENGALURU - RICHMOND ROAD IFSC Code : HDFC0000523 Pin Code : 560025. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~13 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Electronic City13 km
Bellandur–Marathahalli belt20 km
Whitefield IT hub22 km
MG Road / city centre28 km
Outer Ring Road / Manyata34 km
Kempegowda Int'l Airport48 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

7approved drawings on file
46other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 7 approved sheets are the same drawings the builder filed to get SHRIRAM 107SOUTHEAST - PHASE 3 approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Shriprop Living.
Shriprop Living has 3 projects registered in Bangalore, 1 completed.

Other projects by this builder in Bangalore

Shriram 107 Southeast - Phase 2
Filing overdue · 100% built · 100% sold

Other RERA-registered projects in BEML Cooperative Society Layout

Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5

Major developers building in BEML Cooperative Society Layout

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.