K-RERA · the public record
SUYUG THE 1
Bengaluru South · SUYUG CONSTRUCTIONS
Know the project.
Then choose your home.
The registration, progress and filed details in one place. Go further with an independent reading of the project’s evidence.
The record · free to read
Registration read 20 Sep 2026Progress & dates
The timeline on file.
Promoter-reported construction
K-RERA quarterly filings · Q3 2025 to Q4 2025
declared completion
31 Mar 2028
The registered date and a construction update answer different questions. Neither is a confirmation of possession.
K-RERA registration · read 20 Sep 2026
Inventory & scale
What this registration contains.
Filed categories, unchanged · K-RERA registration · read 20 Sep 2026
The whole registration
2.2registered acres
0.0registered units per acre
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual home.
From another project · Prestige Park Grove
A larger advertised area. Almost the same carpet area.
In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.
This illustrates the report format. These findings concern the named sample, not this project.
Read the sample report ↗
The source record
The details behind the headline.
K-RERA · PRM/KA/RERA/1251/310/PR/051224/007268
This project, on the record
The comparable facts of this project, from its own RERA registration record. Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.
On the register
Values as crawled from the official K-RERA record; context percentiles name their comparison population.
Official Registry Facts
Official project scale
RERA filingRegistration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.
| Disclosure | Official value | Why it matters |
|---|---|---|
| Official carpet area | 13,287 sqm | Regulator-disclosed project-level carpet area, not vision-derived room sums. |
| Official built-up area | 33,237 sqm | Useful scale context when comparing density and project cost. |
| Registered land area | 8,802 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 2.49 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered tower/wing entries | 1 | Official tower/wing count in the K-RERA detail page. |
| Parking total (reconciled) | 126 | Separate filed counts; these categories may overlap and are not added together. |
| Covered-parking field | 184 | Separate filed counts; these categories may overlap and are not added together. |
| Open-parking field | 0 | Separate filed counts; these categories may overlap and are not added together. |
| Garage field | 184 | Separate filed counts; these categories may overlap and are not added together. |
| Approved plan number | 276/2024-25 | Use this to match the sanctioned drawing set shown by the builder. |
| Plan approval date | 04-09-2024 | |
| Project start date | 01-10-2024 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| 3 BHK | 118 | 94% | 12,367 sqm |
| OTHER - STUDIO | 2 | 2% | 37 sqm |
| 4 BHK | 4 | 3% | 768 sqm |
| 1 BHK | 2 | 2% | 115 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| THE 1 | 34 | 126 | 126 | 108 m |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingNo litigation declared on this project's K-RERA filing.
5 of 31 compliance document slots are filed as Not Applicable; the remaining 26 slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
Named utility/regulatory approvals
"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.
Statutory approval status
RERA filingClean approvals profile: every applicable statutory NOC is on file — including Fire NOC, the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Note environmental clearance and pollution-control clearance (KSPCB) are not among the approvals K-RERA marks applicable to this project — if the named-approvals check shows them as "not found in catalog", that is why; ask the builder directly whether they apply here. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.
5 further authority slots are marked not applicable by the regulator.
| Authority / NOC | Status | Date | File |
|---|---|---|---|
| Water supply and sewage board | Approved | 11-09-2024 | Water Permission Letter.pdf |
| KPTCL- BESCOM | Approved | 06-04-2024 | BESCOM NOC.pdf |
| Fire and Safety | Approved | 30-05-2024 | Fire Force Department NOC.pdf |
| Airport Authority of India | Approved | 10-05-2024 | Airport Authority Of India NOC.pdf |
| BSNL/Telecommunication Department | Approved | 07-05-2024 | BSNL NOC.pdf |
Project team & certifications
RERA filingK-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Chartered accountant | Prakash N | 222431 | 2009 | Bengaluru Urban, Karnataka - 560103 |
| Engineer | Manohar N | BCCL/BL-3.6/SE-0257/23-24 | 1985 | Bengaluru Urban, Karnataka - 560092 |
| Architect | A. Sujit Nair | CA/2003/31934 | 2003 | Bengaluru Urban, Karnataka - 560043 |
| Contractor | SUYUG CONSTRUCTIONS | - | 2024 | Bengaluru Urban, Karnataka - 562125 |
Financials & Construction Progress
Financial disclosures
RERA filingLatest quarterly filing (2025-Q4): ₹5.16 Cr collected from buyers, ₹5.16 Cr withdrawn from the project's escrow account.
| Construction progress | 16% → 16% (+0 pts) |
| Units sold/booked as registered | 37/126 (29%) |
| Buyer collections in available QPRs | ₹9.63 Cr |
| Escrow withdrawals in available QPRs | ₹8.29 Cr (0.86x collections) |
- The builder has drawn 0.86x of buyer collections from escrow (about 86% of the ₹10 Cr collected) — money is largely staying in the regulated escrow account rather than being pulled out ahead of spend, which is the safer direction. A ratio near or above 1.0 would be the one to scrutinise.
QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.
The estimated cost above is the developer's declared construction cost only (K-RERA's own label: "Estimated Cost of Construction as certified by Engineer") — it excludes land cost, so it isn't comparable to the buyer-collection figures below or to a sale price.
RERA 70% project account is on file: HDFC Sompura Branch IFSC Code : HDFC0009590 Pin Code : 562125. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Location & Connectivity
The nearest major job hub is ~12 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.
| Landmark | Straight-line |
|---|---|
| Bellandur–Marathahalli belt | 12 km |
| Whitefield IT hub | 12 km |
| Electronic City | 12 km |
| MG Road / city centre | 22 km |
| Outer Ring Road / Manyata | 26 km |
| Kempegowda Int'l Airport | 38 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.