K-RERA · the public record
Gallium at Brigade El Dorado
Yelahanka · Brigade Tetrarch
Project Review · example purchase
Spending a few crores on a home? ₹4,999 to check what you’re buying.
Check what the plans put beside your home, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.
From another project · Prestige Park Grove
Avoid bad decisions, only go for the best homes.
Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.
Read the Project Review sample ↗
From another project · Prestige Park Grove · earlier comprehensive example
A larger advertised area. Almost the same carpet area.
In Tower 14, E4 has 141 sq ft more saleable area than E2. Its carpet area is only 0.46 sq m larger. The report puts the two layouts side by side.
This longer example shows the depth of research available in Project Deep Dive. These findings concern the named sample, not this project.
Read the Prestige Park Grove sample report ↗
Free project details
Registration read 25 Oct 2026Registered units and project size
Filed categories, unchanged · K-RERA registration · read 25 Oct 2026
The whole registration
4.3registered acres
116.1registered units per acre
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.
RERA details for Gallium at Brigade El Dorado
K-RERA · PRM/KA/RERA/1251/472/PR/190427/002540
Project facts and comparisons
On the register
In context
Source: K-RERA. Each comparison names the group of projects used.
Project areas, parking and inventory
Project areas and parking
RERA filing| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 499 | Total inventory registered with K-RERA. |
| Official carpet area | 60 sqm | Total carpet area reported for the project. |
| Registered land area | 17,395 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 0.22 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered tower/wing entries | 1 | Official tower/wing count in the K-RERA detail page. |
| Parking total (reconciled) | 362 | Separate filed counts; these categories may overlap and are not added together. |
| Open-parking field | 59 | Separate filed counts; these categories may overlap and are not added together. |
| Garage field | 0 | Separate filed counts; these categories may overlap and are not added together. |
| Project start date | 16-04-2019 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered inventory mix
| Type | Units | Share | Official carpet area |
|---|---|---|---|
| 3 BEDROOM + 2 TOILET | 81 | 100% | 60 sqm |
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| Gallium at Brigade El Dorado | 21 | 499 | 362 | - |
Official unit register
RERA filingK-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 499 official flat/unit rows, matching the 499 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.
By unit type
| Unit type | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| 2BHK | 274 | 43.3-43.7 sqm | 10.4-10.5 sqm | 274 |
| 3BHK | 225 | 58.3-59.7 sqm | 13.7-14.0 sqm | 225 |
By tower / wing
| Tower/wing | Rows | Carpet area | UDS | Parking lots |
|---|---|---|---|---|
| Gallium at Brigade El Dorado | 499 | 43.3-59.7 sqm | 10.4-14.0 sqm | 499 |
Show sample official unit rows
| Unit | Tower | Floor | Type | Carpet | UDS | Parking |
|---|---|---|---|---|---|---|
| G 0011 | Gallium at Brigade El Dorado | 0 | 2BHK | 43.7 sqm | 10.5 sqm | 1 |
| G 0015 | Gallium at Brigade El Dorado | 0 | 3BHK | 59.7 sqm | 14.0 sqm | 1 |
| G 0017 | Gallium at Brigade El Dorado | 0 | 2BHK | 43.7 sqm | 10.5 sqm | 1 |
| G 0102 | Gallium at Brigade El Dorado | 1 | 3BHK | 58.3 sqm | 13.7 sqm | 1 |
| G 0106 | Gallium at Brigade El Dorado | 1 | 2BHK | 43.3 sqm | 10.4 sqm | 1 |
| G 0108 | Gallium at Brigade El Dorado | 1 | 2BHK | 43.3 sqm | 10.4 sqm | 1 |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingLitigation status was not supplied in the captured record. This is not confirmation that there are no cases.
2 of 28 compliance document slots are filed as Not Applicable; the remaining 26 slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Dec 2023 — which has passed with no OC on file.
Approval documents
A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
1 K-RERA order on this project (PROJECT MODIFICATION) — read the order copies on the K-RERA portal.
K-RERA complaint orders (1 complaint against a project of this name on K-RERA's orders register)
| Parties | Relief sought | Disposal | Order date |
|---|---|---|---|
| Swarnalata Kudva vs Brigade Tetrarch Pvt Ltd | With such bad service even before we get our flat, i prefer to bail out and get my money back (whatever we have paid | AUTHORITY | 15/10/2022 |
⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.
Complaints on this project's K-RERA page (6 complaints listed against this promoter)
| Complaint | Subject (as filed) | Project | Status |
|---|---|---|---|
| CMP/191111/0004685 11-11-2019 | Objection to proposed modification of Sanctioned Plan dated 27/03/2019 | Gallium at Brigade El Dorado | DISPOSED AO |
| CMP/210205/0007582 05-02-2021 | Refund of booking amount with interest | Helio at Brigade El Dorado (another project by this promoter) | DISPOSED AUTHORITY BENCH4 |
| CMP/220209/0008995 09-02-2022 | Non Receipt of signed Agreement for Sale | Gallium at Brigade El Dorado | DISPOSED AUTHORITY BENCH5 |
| CMP/220218/0009030 18-02-2022 | Request for refund of flat booking amount | Helio at Brigade El Dorado (another project by this promoter) | DISPOSED AUTHORITY BENCH4 |
| CMP/220914/0010013 14-09-2022 | EOI Refund | Emerald & Luminaire Block at Brigade El Dorado (another project by this promoter) | DISPOSED AUTHORITY BENCH4 |
| CMP/220915/0010022 15-09-2022 | Request for refund of token Money | Krypton at Brigade Eldorado (another project by this promoter) | DISPOSED AUTHORITY BENCH4 |
Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.
Builder track record
RERA filingBrigade has 60 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Brigade Tetrarch”) (average reported construction progress 70%). 30 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹29.7 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.
RERA 70% project account is on file: HDFC Richmond Road (IFSC HDFC0000523, a/c …5346). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Location & Connectivity
The nearest of the listed job hubs is about 13 km in a straight line from the mapped location. Road distance and travel time will differ.
| Landmark | Straight-line |
|---|---|
| Kempegowda Int'l Airport | 7 km |
| Outer Ring Road / Manyata | 13 km |
| MG Road / city centre | 20 km |
| Whitefield IT hub | 21 km |
| Bellandur–Marathahalli belt | 23 km |
| Electronic City | 33 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.