RERA projects by locality

RERA-registered projects in Jamtha, Nagpur

605 registered projects on record · 284 under construction

Newly registered in Jamtha (16 in the last 90 days)

Sapphire
Ritesh Kailashprasad Saxena · registered on 9 Oct 2026
DEV Bhumi
SAND TRADING VENTURES PRIVATE LIMITED · registered on 1 Oct 2026
Mahalaxmi Nagar 51 Anaya
MAHALAXMI INFRAVENTURES LLP · registered on 22 Sep 2026
Swastik Imperial
SWASTIK INFRA · registered on 21 Sep 2026
Mauli Infinity Square 39
MAULI INFRA · registered on 10 Sep 2026
Shree Laxmi Vision City
SHREE LAXMI VENTURE PRIVATE LIMITED · registered on 9 Sep 2026
Ashoka Nagari-2
ASHOKA REALTY AOP · registered on 8 Sep 2026
Gulmohar Greens - III
LUSH PROPERTIES III · registered on 31 Aug 2026
Keshavam City 23
VITTHAL MAHADEOJI BARAPATRE · registered on 14 Aug 2026
Moreshwar Park-15
PRASANNA PROPERTIES · registered on 13 Aug 2026
Shree Datta Prabhu Nagar
SUBHASH NARAYANRAO SHINDE · registered on 10 Aug 2026
Mahalaxmi Nagar 41 : Sector-2
MAHALAXMI INFRACON · registered on 7 Aug 2026
Anandam 14
DESIGN DEVELOPERS · registered on 5 Aug 2026
Prospera
EVERGREEN ESTATE · registered on 3 Aug 2026
Samruddhi Estate-III
SHRADDHA INFRA · registered on 3 Aug 2026
Sandesh Nagari-7
RADHE SANDESH INFRASTRUCTURES · registered on 24 Jul 2026

All new registrations in Nagpur →

Major developers building in Jamtha

Under construction in Jamtha — possession ahead (284)

Sahara City Homes Phase 1 Nagpur
Under construction · possession by Oct 2026
Shiwani Pride
Under construction · possession by Oct 2026
Sharma LAY OUT - 3
Under construction · possession by Nov 2026
Mahalaxmi Nagar 26
Under construction · possession by Nov 2026
Moraj Waterfall Gateway River Block
Under construction · possession by Nov 2026
Shree Residency
Under construction · possession by Dec 2026
Anandam 3
Under construction · possession by Dec 2026
Gurukul
Under construction · possession by Dec 2026
Premier Heritage - 67, 68/1, 68/2
Under construction · possession by Dec 2026
Premier Heritage - 69
Under construction · possession by Dec 2026
Anand Glory 3
Under construction · possession by Dec 2026
Galaxy Mansion-16
Under construction · possession by Dec 2026
Achraj Kutumb
Under construction · possession by Dec 2026
Alliance Park
Under construction · possession by Dec 2026
Anandam Elite Phase - 4
Under construction · possession by Dec 2026
Anandam Park
Under construction · possession by Dec 2026
Dongargaon Commercial Hub
Under construction · possession by Dec 2026
Fortune Ekdant
Under construction · possession by Dec 2026
Golden City
Under construction · possession by Dec 2026
Golden Glory-101
Under construction · possession by Dec 2026
Golden Park
Under construction · possession by Dec 2026
Highway Radiance-4
Under construction · possession by Dec 2026
Leverage Green Villas - Skyview
Under construction · possession by Dec 2026
Metropark - 17
Under construction · possession by Dec 2026
Officer Colony
Under construction · possession by Dec 2026
Pride Purple-2
Under construction · possession by Dec 2026
RSG - West END
Under construction · possession by Dec 2026
Sandesh Nagari - 3
Under construction · possession by Dec 2026
Sandesh Park View - 2
Under construction · possession by Dec 2026
Sandesh Park View-3
Under construction · possession by Dec 2026
Shanti Dham Nagari
Under construction · possession by Dec 2026
Shree SAI Mani Nagari
Under construction · possession by Dec 2026
THE Urban Village
Under construction · possession by Dec 2026
Unique Park - 5
Under construction · possession by Dec 2026
Vijaya Nagari
Under construction · possession by Dec 2026
Ozen Sector -9
Under construction · possession by Jan 2027
Elite Greens
Under construction · possession by Mar 2027
Friends Mall
Under construction · possession by Mar 2027
Godrej Forest Estate
Under construction · possession by Mar 2027
MAI Nagari I
Under construction · possession by Mar 2027
Metro Park 12
Under construction · possession by Mar 2027
Metro Park 13
Under construction · possession by Mar 2027
Metro Park 5
Under construction · possession by Mar 2027
Mukunda Keshavam City 10
Under construction · possession by Mar 2027
Ozen City - Residential Layout Plan In Kh. No 192/a And 192/b
Under construction · possession by Mar 2027
Ruchi Annexe-3
Under construction · possession by Mar 2027
Ruchi Empire
Under construction · possession by Mar 2027
Sh.ravindrasingh Girwarsingh Janewar Smt. Tarabai Mahadeo Thakur AND SH. Shivam Ajaysingh Vyas
Under construction · possession by Mar 2027
Silver Park - 12
Under construction · possession by Mar 2027
Swarnabhoomi Unit 2
Under construction · possession by Mar 2027
Jijaunagar
Under construction · possession by Apr 2027
Shiv Kailasa Phase II
Under construction · possession by Apr 2027
Anjani Exotica 3
Under construction · possession by May 2027
Mangalmurti Residency
Under construction · possession by May 2027
Vishwanath Park
Under construction · possession by Jun 2027
Prestige Park
Under construction · possession by Jun 2027
Baban Bhaurao Taywade
Under construction · possession by Jun 2027
RSG Town
Under construction · possession by Jun 2027
Sai Nagri
Under construction · possession by Jun 2027
Rajatbhoomi 11
Under construction · possession by Jul 2027
Silver Icon - 1
Under construction · possession by Jul 2027
A Singapore Life City THE Utopia 1
Under construction · possession by Aug 2027
Gulsons Estate
Under construction · possession by Aug 2027
Bhakti Park-3
Under construction · possession by Sep 2027
Highway Glory
Under construction · possession by Sep 2027
Kalash Vatika
Under construction · possession by Sep 2027
Sharma LAY OUT-1
Under construction · possession by Sep 2027
Shree Gajanan Nagari
Under construction · possession by Sep 2027
Premier Heritage - 100, 101, 102
Under construction · possession by Oct 2027
Dadaji Signature
Under construction · possession by Oct 2027
Aarambh City 2
Under construction · possession by Oct 2027
Unique Vishwa-II
Under construction · possession by Oct 2027
Krishnum Nagari -6
Under construction · possession by Oct 2027
Ganjanan Nagar
Under construction · possession by Nov 2027
Nisarg Bhumi
Under construction · possession by Nov 2027
A Singapore Life City THE Utopia 2
Under construction · possession by Nov 2027
Moreshwar Park 4
Under construction · possession by Dec 2027
Royal Fort Sector B
Under construction · possession by Dec 2027
Royal Paramount Sector A
Under construction · possession by Dec 2027
Royal Paramount Sector C
Under construction · possession by Dec 2027
Daffodil Highs, Unity Studio Apartments And Eternity Villa
Under construction · possession by Dec 2027
Aadhar Nagari
Under construction · possession by Dec 2027
Aaditya Premium 8
Under construction · possession by Dec 2027
Dream Town
Under construction · possession by Dec 2027
First City, Phase2a-Harmony1 And Harmony6
Under construction · possession by Dec 2027
Green Acres
Under construction · possession by Dec 2027
Growmore Harmony
Under construction · possession by Dec 2027
Kanika
Under construction · possession by Dec 2027
Kesar Fortune
Under construction · possession by Dec 2027
Kuhaasa Residency
Under construction · possession by Dec 2027
Leverage Green Heights Wing B
Under construction · possession by Dec 2027
Lotus Residency
Under construction · possession by Dec 2027
Mangaldeep City III
Under construction · possession by Dec 2027
Mauli Town- 20
Under construction · possession by Dec 2027
Oasis 35
Under construction · possession by Dec 2027
Ozen City II
Under construction · possession by Dec 2027
Platinum Homes
Under construction · possession by Dec 2027
Radha Krishna Nagar
Under construction · possession by Dec 2027
RAM Nagar - IV
Under construction · possession by Dec 2027
Royal Crown
Under construction · possession by Dec 2027
Royal Park
Under construction · possession by Dec 2027
Sandesh Nagari - 4
Under construction · possession by Dec 2027
Sandesh Nagari-5
Under construction · possession by Dec 2027
Shivtirth Nagar - 4
Under construction · possession by Dec 2027
Shree Ganesh Vatika 9
Under construction · possession by Dec 2027
Shree Laxmi Vision City
Under construction · possession by Dec 2027
Sumukh Enclave
Under construction · possession by Dec 2027
THE Great Ashoka Nagari - IV
Under construction · possession by Dec 2027
Unity Residency
Under construction · possession by Dec 2027
Urich Eden Park 2
Under construction · possession by Dec 2027
V M Bhangdia Layout
Under construction · possession by Dec 2027
Vrindavan Phase-3
Under construction · possession by Dec 2027
Unique Park 4
Under construction · possession by Jan 2028
Vishwanath Park II
Under construction · possession by Jan 2028
Gokul Empire
Under construction · possession by Jan 2028
Silvericon 2
Under construction · possession by Jan 2028
Anandam TEN
Under construction · possession by Mar 2028
Durvansh Nagar
Under construction · possession by Mar 2028
Gajanan Nagari -1
Under construction · possession by Mar 2028
Levina Residency
Under construction · possession by Mar 2028
Madhuban II
Under construction · possession by Mar 2028
Saraswati Nagar
Under construction · possession by Mar 2028
Shree Siddheshwar Nagar 2
Under construction · possession by Mar 2028
Leverage Green Heights Wing A
Under construction · possession by Apr 2028
Leverage Green Meadows
Under construction · possession by May 2028
Silver Park-13
Under construction · possession by May 2028
Krishna Nagari - 6
Under construction · possession by Jun 2028
Royal Crest
Under construction · possession by Aug 2028
Ananta
Under construction · possession by Sep 2028
Aarohan
Under construction · possession by Sep 2028
Aditya Square
Under construction · possession by Sep 2028
Sdpl Aashray Beltarodi II
Under construction · possession by Sep 2028
Mahalaxmi Nagar 25 Sector 3
Under construction · possession by Oct 2028
Mahalaxmi Nagar 28 Sector - 1
Under construction · possession by Oct 2028
Mahalaxmi Nagar 28 Sector - 2
Under construction · possession by Oct 2028
Sandesh City - Aellysia - I
Under construction · possession by Oct 2028
Mohini Park
Under construction · possession by Nov 2028
Mahalaxmi Nagar 32
Under construction · possession by Nov 2028
Mahalaxmi Nagar 33 Sector - 1
Under construction · possession by Nov 2028
Mandwe Layout
Under construction · possession by Nov 2028
Silver Park 15
Under construction · possession by Nov 2028
Silver Park-14
Under construction · possession by Nov 2028
Mahalaxmi Nagar 33 Sector - 2
Under construction · possession by Dec 2028
Mahalaxmi Nagar 35
Under construction · possession by Dec 2028
Metrocity VII
Under construction · possession by Dec 2028
Mahalaxmi Nagar 33 Sector - 3
Under construction · possession by Dec 2028
Silver Pride - 1
Under construction · possession by Dec 2028
Vrindavan Phase 1
Under construction · possession by Dec 2028
Anand Krishnkunj
Under construction · possession by Dec 2028
Anandam 14
Under construction · possession by Dec 2028
Anandam Elite Phase VII
Under construction · possession by Dec 2028
Anandam Elite Phase Viii
Under construction · possession by Dec 2028
Dhanashree Park
Under construction · possession by Dec 2028
First City, Phase2b-Harmony2 And Harmony5
Under construction · possession by Dec 2028
Flora Greens
Under construction · possession by Dec 2028
Jamtha Galaxy
Under construction · possession by Dec 2028
Krishna Nagari
Under construction · possession by Dec 2028
Krishna Nagari - 4
Under construction · possession by Dec 2028
Krishna Nagari - 5
Under construction · possession by Dec 2028
Mauli Town-24
Under construction · possession by Dec 2028
Mauli Town-30
Under construction · possession by Dec 2028
Mauli Town-31
Under construction · possession by Dec 2028
Mauli Town-32
Under construction · possession by Dec 2028
Mauli Town-36
Under construction · possession by Dec 2028
MD Town Ghanshyam Kachore Layout
Under construction · possession by Dec 2028
Metrocity VI
Under construction · possession by Dec 2028
Moreshwar Park 5
Under construction · possession by Dec 2028
Moreshwar Park 7
Under construction · possession by Dec 2028
Morya Park 4
Under construction · possession by Dec 2028
Oasis Vatika
Under construction · possession by Dec 2028
Swastik Imperial
Under construction · possession by Dec 2028
Ved Nagari-3
Under construction · possession by Dec 2028
Vijaya Saraswati
Under construction · possession by Dec 2028
Vishnupuram City
Under construction · possession by Dec 2028
Mahalaxmi Nagar 37 Sector - 1
Under construction · possession by Jan 2029
Mahalaxmi Nagar 37 Sector - 2
Under construction · possession by Jan 2029
Moreshwar Park 8
Under construction · possession by Jan 2029
Nisarg Bhumi 2
Under construction · possession by Jan 2029
Royal Vista
Under construction · possession by Feb 2029
Sai Nagri 8
Under construction · possession by Feb 2029
A Singapore Life City THE Utopia 4
Under construction · possession by Mar 2029
Kesar Riverdale
Under construction · possession by Mar 2029
Keshavam City 23
Under construction · possession by Mar 2029
Kukreja Business Park
Under construction · possession by Mar 2029
Mauli Crystal-35
Under construction · possession by Mar 2029
Shree Datta Prabhu Nagar
Under construction · possession by Mar 2029
Silver Pride - 3
Under construction · possession by Mar 2029
Soham AND Sandesh City
Under construction · possession by Mar 2029
THE ONE World
Under construction · possession by Mar 2029
A Singapore Life City THE Utopia 3
Under construction · possession by Apr 2029
Narayana Spaces
Under construction · possession by Apr 2029
MAI Nagari II
Under construction · possession by Apr 2029
Royal Avenue
Under construction · possession by May 2029
Kalash Vatika Phase 2
Under construction · possession by May 2029
Mahalaxmi Nagar 40
Under construction · possession by Jun 2029
Mahalaxmi Nagar 41 Sector - 1
Under construction · possession by Jul 2029
SAI Nagri 9
Under construction · possession by Jul 2029
Rai Imperial II
Under construction · possession by Aug 2029
Mahalaxmi Nagar 41
Under construction · possession by Sep 2029
Atharva Sapphire Towers-A
Under construction · possession by Dec 2029
Atharva Sapphire Towers-B
Under construction · possession by Dec 2029
Dwarka Panjari 15
Under construction · possession by Dec 2029
Greencity 5
Under construction · possession by Dec 2029
Gulmohar Greens-1
Under construction · possession by Dec 2029
Highway Radiance-5
Under construction · possession by Dec 2029
Kelzare Nagari-II
Under construction · possession by Dec 2029
Leverage Green Heights Wing C
Under construction · possession by Dec 2029
Mauli Town-28
Under construction · possession by Dec 2029
Mauli Town-33
Under construction · possession by Dec 2029
Mauli Town-34
Under construction · possession by Dec 2029
Metro Park 21
Under construction · possession by Dec 2029
Narmada Vihar-9
Under construction · possession by Dec 2029
Nirvana Height
Under construction · possession by Dec 2029
Ozen Infinia City
Under construction · possession by Dec 2029
Prospera
Under construction · possession by Dec 2029
Rajatbhoomi - 13
Under construction · possession by Dec 2029
SAI Rachana Nagari
Under construction · possession by Dec 2029
Sai Swami Nagari
Under construction · possession by Dec 2029
Sandesh Park View-4
Under construction · possession by Dec 2029
Saraswati Nagar 5
Under construction · possession by Dec 2029
Shilpa Society-1
Under construction · possession by Dec 2029
Shivam Heights
Under construction · possession by Dec 2029
Pilka Town
Under construction · possession by Jan 2030
Wainganga Lifecity
Under construction · possession by Jan 2030
Mahalaxmi Nagar 42
Under construction · possession by Feb 2030
Anandam 6
Under construction · possession by Mar 2030
KS Shreeya Homes
Under construction · possession by Mar 2030
Mauli Infinity Square 39
Under construction · possession by Mar 2030
Mauli Town-41
Under construction · possession by Mar 2030
Mauli Town-41
Under construction · possession by Mar 2030
Mauli Upavan-38
Under construction · possession by Mar 2030
Meerai Mahalaxmi Nagar 43
Under construction · possession by Mar 2030
Rivershore Estate
Under construction · possession by Mar 2030
Samruddhi Estate I
Under construction · possession by Mar 2030
Shree Swami Samarth Nagari
Under construction · possession by Mar 2030
Britain Empire II
Under construction · possession by May 2030
Anandam 8
Under construction · possession by Jun 2030
Metro City At Part - 1
Under construction · possession by Jun 2030
Mahalaxmi Nagar - 45 : Sector 2
Under construction · possession by Aug 2030
Mahalaxmi Nagar- 45 Sector- 1
Under construction · possession by Aug 2030
Leverage Green Villas-Skyline
Under construction · possession by Aug 2030
Gokul Ressidency 3
Under construction · possession by Nov 2030
Kasturi Garden
Under construction · possession by Dec 2030
Mahalaxmi Nagar -45
Under construction · possession by Dec 2030
Anandam 7
Under construction · possession by Dec 2030
Krishnam Nagari - 8
Under construction · possession by Dec 2030
Mahakali Greens-2
Under construction · possession by Dec 2030
Metrocity - 11
Under construction · possession by Dec 2030
Mohitkar Infratech
Under construction · possession by Dec 2030
Moreshwar Park 13
Under construction · possession by Dec 2030
Moreshwar Park-10
Under construction · possession by Dec 2030
Moreshwar Park-11
Under construction · possession by Dec 2030
Nidhivan
Under construction · possession by Dec 2030
Nidhivan Phase-2
Under construction · possession by Dec 2030
Sai Nagri 10
Under construction · possession by Dec 2030
Sandesh Nagari-6
Under construction · possession by Dec 2030
Sandesh Nagari-7
Under construction · possession by Dec 2030
Shree Ganesh Vatika 10
Under construction · possession by Dec 2030
Shri Goverdhan Bhakti Park 5
Under construction · possession by Dec 2030
Vastu Bhumi
Under construction · possession by Dec 2030
Moreshwar Park-14
Under construction · possession by Mar 2031
Moreshwar Park-15
Under construction · possession by Mar 2031
Rajatbhoomi - 12
Under construction · possession by Mar 2031
Shivaji Nagar 1
Under construction · possession by Mar 2031
Samruddhi Estate-III
Under construction · possession by Jul 2031
Mahalaxmi Nagar 41 : Sector-2
Under construction · possession by Jul 2031
Mahalaxmi Nagar 51 Anaya
Under construction · possession by Sep 2031
Ashoka Nagari-2
Under construction · possession by Dec 2031
Central Cost City
Under construction · possession by Dec 2031
DEV Bhumi
Under construction · possession by Dec 2031
Sapphire
Under construction · possession by Dec 2031
Samruddhi Estate II
Under construction · possession by Mar 2032
Sahastrabahu Nagar
Under construction · possession by Jul 2032
Sukhkarta Nagari
Under construction · possession by Jul 2032
Gurukul 2
Under construction · possession by Oct 2032
Gurukul 3
Under construction · possession by Nov 2032
Classic Akshay
Under construction · possession by Dec 2032
RAJ Palace XV
Under construction · possession by Dec 2032
Harihar Nagar Zari Phase - I
Under construction · possession by Sep 2033
Harihar Nagar Zari Phase II Building NO 1 2 AND 3
Under construction · possession by Dec 2034
Tara Commercial Complex
Under construction · possession by Dec 2034
Harihar Nagar Zari Phase II Building No. 4 & 5
Under construction · possession by Dec 2035
Imperial Heights
Under construction · possession by Dec 2035
Gulmohar Greens - III
Under construction · possession by Mar 2036

Also registered in Jamtha (321)

Bhakti Park 2
Declared completion Oct 2026
Keshvam Reality
Declared completion Oct 2026
Kasturi Hills
Declared completion Oct 2026
Anjani Exotica
Declared completion Sep 2026
Anjani Exotica 2
Declared completion Sep 2026
Devashree Heights
Declared completion Sep 2026
Final Demarcated Residential Layout On Kh. No. 106, Mouza Kothewada, Tal Hingna Nagput
Declared completion Sep 2026
Kalpataru Ardene
Declared completion Sep 2026
Rajatbhoomi - 6
Declared completion Sep 2026
Sahayog Gold
Declared completion Sep 2026
Shree Laxmi Nagar - II
Declared completion Sep 2026
Shree Mangalmurti Heights-III
Declared completion Sep 2026
Silver Park - 10
Declared completion Sep 2026
Silver Park - 9
Declared completion Sep 2026
Silverpark - 11
Declared completion Sep 2026
Silverpark - 7
Declared completion Sep 2026
Silverpark - 8
Declared completion Sep 2026
Brisbane City
Declared completion Sep 2026
Unique Park - 1
Declared completion Aug 2026
Unique Park - 2
Declared completion Aug 2026
Anandam 11
Declared completion Jul 2026
Gajanan Nagari 2
Declared completion Jul 2026
MAI City Phase III
Declared completion Jul 2026
RAJ Homes
Declared completion Jul 2026
Sandesh City Apartments 2
Declared completion Jul 2026
Shreenidhi Estate-V
Declared completion Jul 2026
Happy Galaxy
Declared completion Jul 2026
Mahalaxmi Nagar 25 Sector - 2
Declared completion Jul 2026
Mahalaxmi Nagar 25 Sector - 1
Declared completion Jul 2026
Anjaneya Nagar
Declared completion Jun 2026
Atharva Residency
Declared completion Jun 2026
Avanti Layout
Declared completion Jun 2026
Hari Vatika
Declared completion Jun 2026
Highway Radiance-3
Declared completion Jun 2026
Jamtha Klassic
Declared completion Jun 2026
Krishna Nagari
Declared completion Jun 2026
Kusum Kunj
Declared completion Jun 2026
Nilkanth Nagari
Declared completion Jun 2026
Panjari-Lodhi Layout
Declared completion Jun 2026
Primrose Tower
Declared completion Jun 2026
Shree Ganesh Vatika-6
Declared completion Jun 2026
Krishnum Nagari V
Declared completion Jun 2026
Mahalaxmi Nagar 24 Sector 1
Declared completion Jun 2026
Mahalaxmi Nagar 24 Sector 2
Declared completion Jun 2026
Mahalaxmi Nagar 24 Sector 3
Declared completion Jun 2026
Divyanjali Apartments
Declared completion Jun 2026
Mhdc JV Waghdhara Nagpur Pmay Project
Declared completion Apr 2026
Balaji Nagari II
Declared completion Mar 2026
Keshvam City III
Declared completion Mar 2026
Keshvamcity 4
Declared completion Mar 2026
Morya Lotus
Declared completion Mar 2026
Mukunda Keshavam City 9
Declared completion Mar 2026
Nivaasa Retreat
Declared completion Mar 2026
Peak Orchard Estate
Declared completion Mar 2026
Royal Emperia
Declared completion Mar 2026
Rugveda-1
Declared completion Mar 2026
SG Estate - 2
Declared completion Mar 2026
Shree Ganesh Vatika-8 Vishnupuram City
Declared completion Mar 2026
Krishnum Nagari-IV
Declared completion Feb 2026
Wainganga Nagari
Declared completion Feb 2026
Hiwase Complex
Declared completion Jan 2026
Ozen Rejoice
Declared completion Jan 2026
Jamtha Layout
Declared completion Jan 2026
Ramnagar Takalghat
Declared completion Jan 2026
Bramha Nagari
Declared completion Dec 2025
Dadaji Nagari - II
Declared completion Dec 2025
Emzar Hightown
Declared completion Dec 2025
Highway Radiance
Declared completion Dec 2025
Highway Radiance 2
Declared completion Dec 2025
Jade Province
Declared completion Dec 2025
Leverage Green Villas Phase -I
Declared completion Dec 2025
Mauli Nagar 09 Sector F
Declared completion Dec 2025
Mauli Nagar 19 Sec - A
Declared completion Dec 2025
Mauli Town 19 Sec - B
Declared completion Dec 2025
Mauli Town 19 Sec - C
Declared completion Dec 2025
Prime Platinum
Declared completion Dec 2025
Privara Vihar-4
Declared completion Dec 2025
Sandesh Dream Land
Declared completion Dec 2025
Sandesh Mediclave
Declared completion Dec 2025
Sandesh Park View
Declared completion Dec 2025
Saraswati Nagar 3
Declared completion Dec 2025
Shreeji Residency
Declared completion Dec 2025
Shrushti Vatika
Declared completion Dec 2025
Swarnabhoomi
Declared completion Dec 2025
VED Nagri
Declared completion Dec 2025
Empire City
Declared completion Dec 2025
Krishna Nagari
Declared completion Dec 2025
Ozen Acme
Declared completion Dec 2025
Platinum Crown
Declared completion Dec 2025
RAJ Nagari 2
Declared completion Dec 2025
Vandan Park 1
Declared completion Dec 2025
Mahalaxmi Nagar 21
Declared completion Dec 2025
Krishna Nagari
Declared completion Nov 2025
Platinum
Declared completion Nov 2025
Dwarka Nagari 9
Declared completion Oct 2025
Krishnum Nagari 3
Declared completion Oct 2025
Rajatbhoomi - 2
Declared completion Sep 2025
Rajatbhoomi - 5
Declared completion Sep 2025
Nandwanshi Nagri
Declared completion Aug 2025
Mauli Apartment
Declared completion Jul 2025
Shreenidhi Estate 4
Declared completion Jul 2025
Silverpark - 6
Declared completion Jul 2025
Aaditya Premium - 9
Declared completion Jul 2025
Sharma LAY OUT - Zari
Declared completion Jun 2025
Uttam Nagari
Declared completion Jun 2025
Pavitra Nagri I
Declared completion Jun 2025
Rajatbhoomi-10
Declared completion May 2025
Rajatbhoomi-9
Declared completion May 2025
Silverpark 2
Declared completion May 2025
Mahalaxmi Nagar - 23 Sector - 2
Declared completion May 2025
Dollar Residence
Declared completion Apr 2025
Mahalaxmi Nagar-10
Declared completion Apr 2025
Anandam 4
Declared completion Mar 2025
Anjaneya Nagar-II
Declared completion Mar 2025
Siddharth Kartik Thool
Declared completion Mar 2025
Mauli Nagar - 16
Declared completion Mar 2025
Mauli Nagar 17 Sec-A
Declared completion Mar 2025
Mauli Nagar 17 Sec-B
Declared completion Mar 2025
SAI Residency-1
Declared completion Mar 2025
Krishnum Nagari 2
Declared completion Feb 2025

+201 more registered in Jamtha.

Aggregated from the state RERA registers. 'Under construction' is inferred from a declared completion date still in the future; registration is not completion — confirm the occupancy certificate and current status before you commit.