RERA Property Intelligence Report · Preview

MEENAKSHI GREENS

Sapthagiri Constructions · Bengaluru South · K-RERA PRM/KA/RERA/1251/310/PR/200113/003149

The Drawings Report · ₹4,999

Which flat should you ask for in MEENAKSHI GREENS?

We read all 6 approved drawings and 25 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
4
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

MEENAKSHI GREENS covers 1.0 acres, with two towers and 78 registered apartment homes, estimated to cost ₹34.2 crore. With 76.6 homes per acre, it ranks at the 49th percentile of the 784 Bengaluru South projects tracked here (median 77.3). Its declared completion date of 12 December 2022 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion12 December 2022
Land area4,119 sq m (1.0 acres)
Homes registered78
Towers2
Unit mix78 × Apartment

In context

Density76.6 homes per acre
Density in context49th percentile of 785 Bengaluru South projects (median 77.3)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Meenakshi Greens is registered with K-RERA as PRM/KA/RERA/1251/310/PR/200113/003149, and the promoter has declared completion for 12 Dec 2022.

12 Dec 2022

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Meenakshi Greens spans 4,119 sq m (1.02 acres), comprises 2 towers, registers 78 units, and is declared to cost ₹34.25 cr.

₹34.25 cr

declared project cost

1.02acres

4,119 sq m

78units

on the registration

2.25FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

Promoter record

What else is this promoter on record for?

Sapthagiri Constructions is the promoter of record on 4 projects registered with K-RERA, none of which are past their declared completion dates on the register.

4projects

registered with K-RERA

0past declared date

on the register

100%

average construction reported

Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.

Source · K-RERA register, all projects · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

78
Registered units
₹34.2 Cr
Est. construction cost
Units profiled
31
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units78Total inventory registered with K-RERA.
Official carpet area6,576 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area4,119 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI2.25Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings2Official tower/wing count in the K-RERA detail page.
Parking disclosed92 total (0 open) — 1.18 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date13-10-2019

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
Apartment78100%6,576 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower A44047-
Tower B43845-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 78 official flat/unit rows, matching the 78 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK4492.0-92.5 sqm54.8-63.0 sqm44
2 BHK3471.2-76.5 sqm43.2-51.1 sqm34

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower A4092.0-92.3 sqm54.8-61.4 sqm40
Tower B3871.2-92.5 sqm43.2-63.0 sqm38
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
A-007Tower A03 BHK92.3 sqm55.0 sqm1
A-008Tower A03 BHK92.3 sqm55.0 sqm1
A-009Tower A03 BHK92.3 sqm55.0 sqm1
A-010Tower A03 BHK92.3 sqm55.0 sqm1
A-011Tower A03 BHK92.0 sqm54.8 sqm1
A-012Tower A03 BHK92.0 sqm54.8 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~907 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a boutique, low-density project — 78 homes across 2 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 92 parking spaces for 78 homes (~1.2 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~54 sqm per home; across all 78 homes that is ~103% of the plot — the undivided shares sum to close to the whole plot.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

9 of 25 compliance document slots are filed as Not Applicable; the remaining 16 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 12 Dec 2022, extended (Covid Extension) to 12 Sep 2023 — both dates have passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)Not found in catalog
Water & sewage (BWSSB/KWSSB)✓ On file (BWSSB)
Fire NOCNot found in catalog
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearanceNot found in catalog
Airport Authority height clearanceNot found in catalog

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA complaint orders (6 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Vedavyas Yajamanyam vs Sapthagiri ConstructionsBuilders to reconstruct the compound wall completely. Remove the commercial operation in residential Apartment. Provide the amenities as per brochure. Also all the OTS and Ducts should be closed.AUTHORITY30/04/2026
Puneeth P Shetty vs Sapthagiri ConstructionsThe ask is for the entirety of the project land, totaling 1 acre and 12 guntas, to be asserted as belonging to Meenakshi Apartment, and for the construction of a singular boundaryAUTHORITY30/04/2026
James Anandanesan Sucilan and SORNALATHA D vs Sapthagiri ConstructionsPlease make the builders to reconstruct the complete compound wall properly and remove the commercial operation in residential propertyAUTHORITY27/04/2026
Shashank Sarma vs Sapthagiri ConstructionsPending works have to be completed be the building is surrendered to association and all promised aminities have to be completed.AUTHORITY27/04/2026
JOSHIL G JAIN vs Sapthagiri ConstructionsComply Project Promoter to provide assured aminities and complete pending project workAUTHORITY27/04/2026
Jeevan Stephen vs Sapthagiri ConstructionsCompletion of pending promised workAUTHORITY27/04/2026

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectSathish’s Swanlines-2007BSK III Stage, Bangalore 560085
ContractorSapthagiri Constructions-2019Bangalore, Karnataka-560078
Structural engineerA.Ramachandran---

Builder track record

RERA filing

Sapthagiri Constructions has 4 other K-RERA-registered projects in our records (average reported construction progress 100%). 0 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹43.9 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: Axis Bank Jayanagar 4th T Block. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~8 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Electronic City8 km
MG Road / city centre11 km
Bellandur–Marathahalli belt12 km
Outer Ring Road / Manyata19 km
Whitefield IT hub20 km
Kempegowda Int'l Airport38 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

6approved drawings on file
25other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 6 approved sheets are the same drawings the builder filed to get MEENAKSHI GREENS approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Sapthagiri Constructions.
Sapthagiri Constructions has 4 projects registered in Bangalore, 2 completed.
6 complaints on the K-RERA register against Sapthagiri Constructions in Bangalore.

Other projects by this builder in Bangalore

Sapthagiri Sampadha
Filing overdue · 100% built · 44% sold
Sapthagiri Sampadha
Filing overdue · 100% built · 44% sold
Sapthagiri Sampada B Block
No filings

Other RERA-registered projects in Hulimavu

Major developers building in Hulimavu

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Meenakshi Greens?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026