SHRIRAM SUMMITT

P. Krishnaiah Chetty · Anekal · K-RERA PRM/KA/RERA/1251/308/PR/180131/001828

The Drawings Report · ₹4,999

Which flat should you ask for in SHRIRAM SUMMITT?

We read all 4 approved drawings and 13 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

SHRIRAM SUMMITT covers 538 sq m (0.1 acres) and has 9 towers with 11 homes registered, all as apartments. Its density of 82.7 homes per acre is the 61st percentile among 470 Anekal projects (median 75.8). Its declared completion date of 31 December 2019 has passed; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion31 December 2019
Land area538 sq m (0.1 acres)
Homes registered11
Towers9
Unit mix11 × APARTMENTS

In context

Density82.7 homes per acre
Density in context61st percentile of 470 Anekal projects (median 75.8)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Shriram Summitt is registered with K-RERA as PRM/KA/RERA/1251/308/PR/180131/001828, and the promoter has declared completion for 31 Dec 2019.

31 Dec 2019

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Shriram Summitt spans 538 sq m (0.13 acres), comprises 9 towers, registers 11 units.

0.13acres

538 sq m

11units

on the registration

127799.0FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

11
Registered units
Est. construction cost
Units profiled
17
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units11Total inventory registered with K-RERA.
Official carpet area923 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area538 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~237.54Sanctioned floor-area ratio (≈127,799 sqm sanctioned FAR area ÷ 538 sqm land) — higher means a denser vertical build.
Registered towers/wings9Official tower/wing count in the K-RERA detail page.
Parking disclosed11 total (2 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date02-07-2014

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
APARTMENTS11100%923 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
41311-
61322-
71311-
101311-
111311-
121311-
141311-
161322-

Showing first 8 of 9 tower/wing rows.

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 11 official flat/unit rows, matching the 11 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK479.4-87.4 sqm0.0 sqm4
3 BHK399.8-100.2 sqm0.0 sqm3
1 BHK249.5 sqm0.0 sqm2
2.5 BHK293.4-93.5 sqm0.0 sqm2

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
162100.2 sqm0.0 sqm2
6283.1-87.4 sqm0.0 sqm2
10193.4 sqm0.0 sqm1
11149.5 sqm0.0 sqm1
12149.5 sqm0.0 sqm1
14193.5 sqm0.0 sqm1
17179.4 sqm0.0 sqm1
4187.4 sqm0.0 sqm1
7199.8 sqm0.0 sqm1
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
04.03.04422 BHK87.4 sqm0.0 sqm1
06.05.03642 BHK87.4 sqm0.0 sqm1
06.08.04672 BHK83.1 sqm0.0 sqm1
07.02.04713 BHK99.8 sqm0.0 sqm1
10.03.011022.5 BHK93.4 sqm0.0 sqm1
11.02.041111 BHK49.5 sqm0.0 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~904 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a large, multi-tower township — 11 homes across 9 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 11 parking spaces for 11 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~0 sqm per home; across all 11 homes that is ~0% of the plot — the undivided shares sum to less than the plot area.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

2 of 13 compliance document slots are filed as Not Applicable; the remaining 11 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Dec 2019 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

K-RERA complaint orders (70 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Hari Krishnan C P vs Shriram SummittPhysical Possession , OC & Delay CompensationAUTHORITY31/01/2024
Mrinal Kanti Das vs Shriram SummittCompensation for the delay of possession and mental trauma faced by myself and my family.AUTHORITY31/01/2024
Rajkumar Sanajaoba Singh vs Shriram Properties Pvt. Ltd.Need Compensation of the delayAUTHORITY31/01/2024
Debashish vs Shriram SummittDirect Builder for Delayed Compensation, Respective pending interest and GST credit to be passed on to customer effective 1-Jan -2020AUTHORITY31/01/2024
ABHISHEK SAINI vs SHRIRAM SUMMITTCompensation on Account of Delay in PossessionAUTHORITY31/01/2023
SANTOSH SUBBARAO vs SHRIPROPR DWELLERS PVT LTD, SHRIRAM PROPERTIES PVT LTDRequest to provide the delay compensation by the builder (SHRIRAM PROPERTIES)AUTHORITY30/12/2022
Hitesh Ray & Manisha Saxena vs M/s Shriram Properties Private LimitedCOMPENSATION AMOUNT (MCLR+2%) TO BE PAID INCLUDING DUE INTEREST FOR THE DELAYED PERIOD WITH IMMEDIATE EFFECT AS OF TODAYAUTHORITY30/09/2024
Madhu Sudhan Ravindran vs SHRIRAM PROPERTIES PRIVATE LIMITEDComplainant prays for monetary interest on delay period, and breach of agreement as per applicable RERA provisionsAUTHORITY30/06/2026
MR SANDEEP DUBEY AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERCancellation of Sale Deed and full refund with interest & Penality.AUTHORITY29/09/2023
Harish Kasiviswanathan vs SHRIRAM PROPERTIES PVT LTD; SHRIPROP DWELLERS PRIVATE LTDTo Provide Delay compensation as per agreement with builder till OCAUTHORITY29/08/2024
Praveen K Vijayan & Shabna CK vs SHRIRAM PROPERTIES PVT LTD, SHRIRAM PROPERTIES PVT LTD(1) Compensation for delay in delivery of flat and (2) Waiver of payment delay fee charged by the builderAUTHORITY28/11/2024
VARUN KUMAR & VEENA RAI vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDComplainant has already paid more than 7 lakhs of interest Property: Flat no. 21:03:02, Shriram Summit, Electronic City, Bangalore. Request you to provide compensation as per agreement.AUTHORITY28/10/2022
PRAKASH SUNDARAM vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDImmediate Intervention and Provide relief in terms of compensation and project completion/delivery dateAUTHORITY28/10/2022
PROUT CHAKMA vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDSeeking Delay compensation until registrationAUTHORITY28/10/2022
Amit Kumar Singh vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PVT LTDThe complainant has already paid around 90% of total flat amount of Flat no. 19.08.03, Shriram Summit, Electronic City. Looking for the compensation as per the agreement from the builder.AUTHORITY28/10/2022
BISWADIP CHAKRABORTY & SANTU SAIKIA vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PVT LTDAssist us in getting compensation from Shriram on losses we made due to delay in apartment handoverAUTHORITY28/10/2022
MS SINDHU VIDYASAGAR vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERCompensation & fasttrack project delivery from Shriram. Assure no more payment demands from Shriram until compensation terms are mutually agreedAUTHORITY28/07/2023
Girish Wali vs SHRIRAM PROPERTIES PRIVATE LIMITEDRefund the Amount along with InterestAUTHORITY25/10/2022
Subodh Kumar vs M/S.SHRIRAM PROPERTIES PVT LTDTo order the respondent to pay interest , for delayr in delivery of posession of the flat. Grant costs. Any other relief that the autority deems fit in the interest of equity and justice.AUTHORITY25/08/2026
Pallav Das vs Shriram Summit1) I am paying Pre EMIs to the bank every month from last 2 years and not sure how i need to pay. So, i need a compensation of the interest i have paid to the bank and 6% extra GST refundAUTHORITY25/01/2024
HITESH RAY vs SHRIRAM SUMMITTWant to settled my delay compensation as per Sales Agreement.AUTHORITY24/05/2023
MR.PRATHAMESH PRAKASH KARMALKAR & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD. & ANOTHERCompensationAUTHORITY23/07/2026
MR PULKIT NAGPAL vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERSir, I am looking to withdraw from the project and get refund with interest applicable per RERAAUTHORITY22/07/2023
MR ARUN KUMAR TIWARI vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERBank loan interest & other compensation till receipt of OC & GST to be calculated at 5% & access GST amount already charged is refunded to me or adjusted with my disbursements.AUTHORITY22/07/2023
President, Shriram Summitt Apartment Owners Welfare Association vs M/S.SHRIRAM PROPERTIES PVT LTDDirect SPL to immediately release the 92 lakh INR balance corpus with accrued interest and, within 15 days, file complete audited corpus/maintenance accounts and all pending hand-over documentsAUTHORITY22/04/2026
SUDHIR KUMAR vs SHRIRAM PROPERTIES PRIVATE LIMITED & ANOTHERCompensation as per agreed in the sale agreementAUTHORITY22/02/2024
Darshan Gopal Bhatt & Leelavathi G Bhatt vs M/s Shriram Properties Ltd & Shriprop Dwellers Pvt LtdDelay CompensationAUTHORITY21/08/2024
Karthik Desh Kulkarni vs M/S. SHRIRAM PROPERTIES PVT LTD; M/S. SHRIPROP DWELLERS PRIVATE LTDDelay Compensation from the builder as per the RERA terms and conditions from 31-Dec-2019 till Occupancy Certificate is receivedAUTHORITY21/08/2023
MR RAJIV KUMAR SINGH vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHEREMI, Rent and No tax relief has broke my financial and mentally condition. I want mine Compensation be paid as soon as possible as per signed agreement.( MCLR+2% from 1st Jan2020 onwards).AUTHORITY19/10/2023
Adarsha Sachan & Kavita Kumari vs SHRIRAM PROPERTIES PVT LTD; SHRIPROP DWELLERS PVT LTDRequest for Delay compensation on account of delayed possession by builder for Property: Flat no. 21:11:02, Shriram Summit, Electronic City, Bangalore.AUTHORITY18/09/2024
Venkata N R Chinnam & Jayasree D Chinnam vs M/s Shriram Properties Pvt LtdRemaining compensation of Rs.1,22,260.00 plus interest at government rate calculated from handover notification date of 31st Jan, 2019 till date on which remaining to be paid by the builder.AUTHORITY18/09/2024
MR SABYASACHI MAITY & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERPre-EMI Interest refund, Delay compensation, No more demand notes to be raised by builderAUTHORITY17/08/2023
Vishal Kumar Pandey vs SHRIRAM PROPERTIES PVT LTDI humbly pray that this Hon’ble Court may be please allow the complaint and direct the opposite party to provide the delayed period compensation for entire delayed period in the interest of justice.AUTHORITY17/08/2023
MR CHETAN SONWALKAR vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERDelay compensation as per agreement with interest and also updates on the project status to be updated to RERA. And we need actual planned completion date of the project.AUTHORITY17/07/2023
MR KUNAL PRIYADARSHI & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERDelay and other compensation till receipt of OCAUTHORITY17/07/2023
MS.SUMAN SEKHAR BEHERA & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERDelay and other compensation till receipt of OC.AUTHORITY17/07/2023
MR SACHIN SHARMA vs M/S.SHRIRAM PROPERTIES PVT LTD. & ANOTHERHelp in getting the flat with full amenities/facilities and compensation for delay and not providing amenities/facilities as per registered and legally signed agreementAUTHORITY17/07/2023
MS SONI KUMARI & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERHandover of the project with delayed compensationAUTHORITY17/07/2023
MR NISHANT & MS.KUMARI SWETA vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERI am in huge financial loss due to builder false promises and incompetency in project execution. Compensation amount (MCLR+2%) to be paid including due interest for the delayed period with immediatelyAUTHORITY17/07/2023
MR SANDEEP VAMAN PALEKAR AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD AND ANOTHERInterest on delay period for 2years 7months as per SALE AgreementAUTHORITY17/01/2025
Damodar Mishra & Monica Mishra vs 1) SHRIRAM PROPERTIES PRIVATE LIMITED; (2) SHRIPROP DWELLERS PRIVATE LTDProper compensation for the delay in handover of the apartmentAUTHORITY13/11/2024
Tanmay Dayma & Akanksha Dayma vs SHRIPROP DWELLERS PVT LTD, SHRIRAM PROPERTIES PVT LTDWe anticipate that RERA will step in and provide compensation from the builder.AUTHORITY13/08/2024
Ruchee & Prithvi Anand vs SHRIRAM PROPERTIES PVT LTD, SHRIPROP DWELLERS PRIVATE LTDSincere appeal to RERA authorities to please grant us the project delay compensation as per the lawfully abided signed sale agreement clause and the delivery of flat:20.05.02AUTHORITY13/08/2024
Mohammed Ameen Makkadayil & Anooja P vs SHRIRAM PROPERTIES PVT LTD & SHRIPROP DWELLERS PRIVATE LTDCompensation for the delayAUTHORITY13/08/2024
Samsheer Nalakath Valappil & Ramisha Samsheer vs Shriram Properties Private LimitedI request honorable rera authority to please provide delay period compensation for the delayed period from Dec 2019 to July 2022AUTHORITY13/08/2024
ASHISH MANOJ MHETAR vs SHRIRAM PROPERTIES PRIVATE LIMITEDRespective Compensation from Builder for the Delay as per RERA normsAUTHORITY13/08/2022
AJAY KRISHNA KALANGI vs SHRIRAM PROPERTIES PRIVATE LIMITEDGST refund, Delay compensation, No more demand notes to be raised by builderAUTHORITY13/08/2022
MR SAMIT KUMAR PAL vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERFull Compensation or Full Ret. with interest immedAUTHORITY13/07/2023
MR SRIRAM.S. vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERRight Penal Compensation due to delay, Timely Delivery of Flat with all the Amenities without compromising on QualityAUTHORITY13/07/2023
Shivendra Pratap Singh & Madhu Singh vs Shriram Properties Pvt Ltd & Shriprop Dwellers Pvt LtdCompensation for Delayed period to be provided to buyer of Apartment 21.12.04 at SHRIRAM PROPERTIES PRIVATE LIMITED Registration Number : PRM/KA/RERA/1251/308/PR/ from Builder ( Period 2019 to 2022 )AUTHORITY13/05/2024
MANINDRA NATH JHA & SANJUKTA JHA vs M/S SHRIRAM PROPERTIES PVT LTDDelay Penalty and Interest paid to the bank against the loan amount for the delayed period.AUTHORITY12/12/2024
SHAILENDRA DHARNE vs SHRIRAM PROPERTIES PRIVATE LIMITEDHelp getting compensation due to delay in handing over the flat as per registered and legally signed documentAUTHORITY12/03/2024
V Saraswathi Gowda vs M/S SHRIRAM PROPERTIES PRIVATE LIMITEDQuash/Set aside the Demand Notice dated 31.03.2023 and ordder the Respondent to Complete the Construction of the Apartment booked by her.AUTHORITY12/01/2024
MR.VINESH.K vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERcompensation on 2 grounds: 1) the total PRE Emi I have been paying since Oct 2019 till hand over of flat to be returned to me(as per the subvention scheme) 2) compensation for delay in handoverAUTHORITY11/10/2023
B.RAJKUMAR vs SHRIRAM PROPERTIES PVT LTDI am requesting RERA committee to order the builder to release the compensation amount for the principal money which I paid with the interest rate of bank MCLR rate plus 2% as per agreementAUTHORITY10/10/2023
YUDHISH GUPTA vs SHRIRAM PROPERTIESDelay compensation with interest and Rent paid for 2 years due to delayAUTHORITY08/09/2023
Siddharth Sinha vs shriram properties pvt ltdto direct the Respondent to cancel allocation of Apartment, Agreement of Sale, refund Booking Amount with Interest and foreclose loan with costs.AUTHORITY07/02/2023
MR.AMOL GOKUL ANANPARA vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERFull Compensation or Full Return asap or today.AUTHORITY06/09/2023
MR SUDHANSHU DWIVEDI vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHERTake an action on builder to pay delayed compensation or Bank Interest payout until Possession.AUTHORITY06/09/2023
MR.SUMIT MATOO AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD.Expecting RERA to help us in this situation and get our flats and due compensation from the builder.AUTHORITY06/02/2024
BINU CHELLAPPAN vs SHRIRAM PROPERTIES PVT LTDREFUND OR BETTER COMPENSATION FOR THE DELAYAUTHORITY06/02/2023
Sunitha A Kumar vs SHRIRAM PROPERTIES PRIVATE LIMITEDDelay compensation and interest refund till receipt of OC for both units and cancellation of unit1 without any penalty . GST 12% is charged instead of 5% fixed by GOVT. Difference amt to be refundedAUTHORITY05/11/2022
Varun Bansal vs SHRIRAM PROPERTIES PVT LTD & SHRIPROP DWELLERS PRIVATE LTDDelay compensation should be processedAUTHORITY05/08/2024
Soumya Ranjan Choudhury & Sasmita Nayak vs SHRIRAM PROPERTIES PRIVATE LIMITEDRequest for delay compensation for 1.5 years as per RERA regulationsAUTHORITY05/08/2024
Sheela Jha vs SHRIRAM PROPERTIES PRIVATE LIMITEDDelay compensation + Project completion + Cost of legal expensesAUTHORITY04/11/2022
ANKIT NADGOUDA vs SHRIRAM PROPERTIES PRIVATE LIMITED & 3 OTHERSSnags to be rectified in our flat + Compensation to be provided to us for the delay in handoverAUTHORITY03/10/2023
MR VIPIN KUMAR GUPTA AND ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHER1)Get the project completion with all promised/agreed amenities ASAP2)Decide on the delayed compensation payment and get it adjusted with upcoming demands3)Penalise builder for harassing customersAUTHORITY01/08/2023
MR.NIMEESH K RAMAKRISHNAN & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD. & ANOTHERI am expecting a relief like delay compensation until possession, refund EMI dues by the builder, action to complete the project in utmost priority. As a second option cancel the booking and refund.AUTHORITY01/07/2026
MR SOOREJ SASIKALA RAMESAN & ANOTHER vs M/S.SHRIRAM PROPERTIES PVT LTD & ANOTHER, compensation amount (MCLR+2%) to be paid including due interest for the delayed period with immediate effect as of todayAUTHORITY01/07/2026
Apartment not handed over on time vs SHRIRAM PROPERTIES PRIVATE LIMITEDDue to their carelessness I have to pay the rent and the EMI to bank which is increasing my financial debt. Requesting RERA to instruct Shriram builder to pay me the interest as per RERA policy.AUTHORITY01/06/2023

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

RERA 70% project account is on file: ICICI Bank Jayanagar, 5th Block (IFSC ICIC0001666, a/c …0202). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest major job hub is ~9 km away — a manageable everyday commute to a major job hub.

LandmarkStraight-line
Electronic City9 km
MG Road / city centre9 km
Bellandur–Marathahalli belt10 km
Outer Ring Road / Manyata16 km
Whitefield IT hub18 km
Kempegowda Int'l Airport36 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

4approved drawings on file
13other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 4 approved sheets are the same drawings the builder filed to get SHRIRAM SUMMITT approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Krishnaiah Chetty.

Other RERA-registered projects in Hulimavu

Major developers building in Hulimavu

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Own a unit in Shriram Summitt?

Sell directly to Quietlist's pre-screened buyer list — flat fee, no broker commission.

List your unit →

Last checked against the RERA register: 10 Sep 2026