Bangalore/Project record

K-RERA · the public record

OPERA PRIMUS

Bengaluru South · OPERA STRUCTURES

Project Review · example purchase

Spending a few crores on a home? ₹4,999 to check what you’re buying.

Check what the plans put beside your home, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.

From another project · Prestige Park Grove

Avoid bad decisions, only go for the best homes.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project Review sample ↗
Prestige Park Grove Project Review · first page
First page of the complete sample.
31 Dec 2027declared completionK-RERA registration · read 25 Oct 2026
48registered unitsK-RERA registration · read 25 Oct 2026

Free project details

Registration read 25 Oct 2026

Registered units and project size

2BHK
28
3BHK
20

Filed categories, unchanged · K-RERA registration · read 25 Oct 2026

The whole registration

0.6registered acres

73.9registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for OPERA PRIMUS

K-RERA · PRM/KA/RERA/1251/310/PR/210323/005807

Project facts and comparisons

On the register

Declared completion31 December 2027
Land area2,627 sq m (0.6 acres)
Homes registered48
Tower/wing entries1
Unit mix28 × 2BHK, 20 × 3BHK

In context

Density73.9 homes per acre
Density in context44th percentile of 791 Bengaluru South projects (median 77.3)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units48Total inventory registered with K-RERA.
Official carpet area3,706 sqmTotal carpet area reported for the project.
Official built-up area6,960 sqmUseful scale context when comparing density and project cost.
Registered land area2,627 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.73Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered tower/wing entries1Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)54Separate filed counts; these categories may overlap and are not added together.
Covered-parking field54Separate filed counts; these categories may overlap and are not added together.
Open-parking field0Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Approved plan numberPRJ/3239/22-23Use this to match the sanctioned drawing set shown by the builder.
Plan approval date03-09-2022
Project start date12-12-2022

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
2BHK2858%1,799 sqm
3BHK2042%1,907 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
OPERA PRIMUS3485414.4 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 48 official flat/unit rows, matching the 48 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2 BHK2862.1-65.4 sqm52.3 sqm28
3 BHK2091.6-100.2 sqm60.0-65.0 sqm20

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
OPERA PRIMUS4862.1-100.2 sqm52.3-65.0 sqm48
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
101OPERA PRIMUS02 BHK65.4 sqm52.3 sqm1
102OPERA PRIMUS02 BHK65.4 sqm52.3 sqm1
103OPERA PRIMUS02 BHK65.4 sqm52.3 sqm1
104OPERA PRIMUS02 BHK65.4 sqm52.3 sqm1
105OPERA PRIMUS03 BHK96.2 sqm60.0 sqm1
106OPERA PRIMUS02 BHK64.1 sqm52.3 sqm1

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

The promoter answered No to the land-litigation question. This is a filed declaration, not a court search.

27 of 44 compliance document slots are filed as Not Applicable; the remaining 17 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Approval documents

Electricity (BESCOM/ESCOM)Document listed: Electricity Permission Letter
Water & sewage (BWSSB/KWSSB)Document listed: Water Permission Letter
Fire NOCNot identified in the document list
Pollution control (KSPCB)Not identified in the document list
Environmental clearanceNot identified in the document list
Airport Authority height clearanceNot identified in the document list

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantG Ramakrishna Reddy0215641511445612022Bengaluru Urban, Karnataka - 560010
EngineerMadamanchi Surendra NadhBCC/BL-3.6/SE:0333/2021-222022Bengaluru Rural, Karnataka - 560077
ArchitectT N S ChakravarthiCA/2003/318392003Bengaluru Urban, Karnataka - 560011
ContractorGirish-2018Bengaluru Urban, Karnataka - 560076

Builder track record

RERA filing

Opera Structures has 2 other K-RERA-registered projects in our records (average reported construction progress 30%). 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹29.6 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: Union Bank of India JAYANAGAR 4TH BLOCK IFSC Code : UBIN0816965 Pin Code : 560011. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest of the listed job hubs is about 8 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
Electronic City8 km
MG Road / city centre12 km
Bellandur–Marathahalli belt13 km
Outer Ring Road / Manyata20 km
Whitefield IT hub21 km
Kempegowda Int'l Airport39 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Opera Structures.
Opera Structures has 3 projects registered in Bangalore.

Other projects by this builder in Bangalore

Opera Akshar
Filing overdue · 30% built · 7% sold

Other RERA-registered projects in Hulimavu

Major developers building in Hulimavu

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 25 Oct 2026. Document and inventory dates are shown in their sections.