SBR TEJAS
Bengaluru East · SBR HABIITAT
Project Review · example purchase
Spending a few crores on a unit? ₹4,999 to check what you’re buying.
Check what the plans put beside your unit, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.
See the report before you buy
Avoid bad decisions, only go for the best units.
Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.
Read the Project Review sample ↗From another project
See the report before you buy.
A published sample shows the level of detail, source illustrations and buyer reasoning. Its findings belong to that project.
Read a sample report ↗Free project details
Registration read 25 Oct 2026Registered units and project size
Filed categories, unchanged · K-RERA registration · read 25 Oct 2026
The whole registration
1.3registered acres
34.4registered units per acre
The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.
RERA details for SBR TEJAS
K-RERA · PRM/KA/RERA/1251/446/PR/190131/002315
Project facts and comparisons
On the register
In context
Source: K-RERA. Each comparison names the group of projects used.
Project areas, parking and inventory
Project areas and parking
RERA filing| Disclosure | Official value | Why it matters |
|---|---|---|
| Registered units | 44 | Total inventory registered with K-RERA. |
| Registered land area | 5,179 sqm | The land area attached to this K-RERA registration. |
| Sanctioned FAR/FSI | 3.25 | Higher FAR generally means a denser vertical build, subject to site layout and open-space design. |
| Registered tower/wing entries | 2 | Official tower/wing count in the K-RERA detail page. |
| Parking total (reconciled) | 125 | Separate filed counts; these categories may overlap and are not added together. |
| Open-parking field | 20 | Separate filed counts; these categories may overlap and are not added together. |
| Garage field | 208 | Separate filed counts; these categories may overlap and are not added together. |
| Project start date | 02-02-2018 |
Official inventory & towers
RERA filingK-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.
Registered tower / wing summary
| Tower/wing | Floors | Units | Parking | Height |
|---|---|---|---|---|
| SBR TEJAS COMMERCIAL | 7 | 7 | 88 | - |
| SBR TEJAS RESIDENTIAL | 12 | 37 | 37 | - |
Legal, Approvals & Project Team
Litigation & compliance
RERA filingLitigation status was not supplied in the captured record. This is not confirmation that there are no cases.
All 13 standard compliance document slots have usable uploaded filings.
No completion certificate (OC) on file yet — project has not been declared complete.
⚠ Registration validity has lapsed: originally due 31 Dec 2021, extended (Covid Extension) to 30 Sep 2022 — both dates have passed with no OC on file. An extension application filed on 30 Sep 2022 is pending with K-RERA — until it is approved, the registration stands lapsed.
Approval documents
A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.
K-RERA enforcement record (the regulator's own defaulter list & penalty orders)
⚠ Listed on K-RERA's official DEFAULTER list.
Project team & certifications
RERA filingK-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.
| Role | Name | Registration / licence | Since | Locality |
|---|---|---|---|---|
| Architect | NADIG ASSOCIATES | - | 1984 | 195 2 ND C CROSS, DOMLUR 2 ND STAGE |
| Contractor | SPACE BUILT CONSTRUCTION PVT LTD | - | 2012 | 122, K T NAGAPPA REDDY LAYOUT DODDAKANNA HALLI |
| Structural engineer | GIRISH M SWAMY CONSULTANTS | - | - | - |
Builder track record
RERA filingSbr Habiitat has 3 other K-RERA-registered projects in our records. 3 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a higher delayed rate than the K-RERA average across Bengaluru on the same measure.
Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.
Financials & Construction Progress
Financial disclosures
RERA filing⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.
Declared construction cost ÷ registered units averages to ₹188.6 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.
RERA 70% project account is on file: HDFC KADUGODI (IFSC HDFC0000363, a/c …9136). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.
Location & Connectivity
The nearest of the listed job hubs is about 7 km in a straight line from the mapped location. Road distance and travel time will differ.
| Landmark | Straight-line |
|---|---|
| Whitefield IT hub | 7 km |
| Bellandur–Marathahalli belt | 12 km |
| Outer Ring Road / Manyata | 12 km |
| MG Road / city centre | 15 km |
| Kempegowda Int'l Airport | 18 km |
| Electronic City | 23 km |
Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.