Brigade Calista - Phase 1

Brigade Enterprises · Bengaluru East · K-RERA PRM/KA/RERA/1251/446/PR/030223/005683

The Drawings Report · ₹4,999

Which flat should you ask for in Brigade Calista - Phase 1?

We read all 7 approved drawings and 45 filed papers on this project’s RERA file — the sheets the builder filed to get it approved.

All 506 flats sold in the latest filing · 77% reported construction progress.

  • Which flat to ask for — and which to say no to
  • What the drawings put above, below and beside it
  • What to get in writing before you pay a booking amount

One real find, from a Noida project’s approved drawings: the buyer pays for 10,000 sq ft — the floor inside the flat is 6,982 sq ft.

Get it for this project →

Not useful to your decision? Full refund — no questions asked. Sent as a PDF in one working day.

Not yet
Completion certificate
None declared
Legal status
68
Other RERA projects by builder

Free before you decide: the 14 things to get in writing before you book

Every item comes from a real RERA filing. Send it to the family group before anyone pays a token.

Read it here →

This project, on the record

BRIGADE CALISTA - PHASE 1, on 5.8 acres, has 3 towers and 506 homes, with a unit mix of 17 3BHK+2T, 110 2BHK+2TOILET, 1 1BHK+1 TOILET+STUDY, 145 3BHK+3TOILET, 2 1BHK+1 TOILET, 84 1BHK+1 TOILET+STUDY, 90 3BHK+2TOILET, and 56 3BHK+3TO, with an estimated project cost of ₹174.6 crore. At 87 homes per acre it sits at the 69th percentile of 1118 Bengaluru East projects on this register (median 75.7). Its declared completion date is 30 June 2027; no occupancy certificate is on record.

Each context percentile names its exact comparison set, drawn from Quietlist’s full register store. The paid report adds drawing-read rows to this same table — what the filed plans show about the site, its edges and the unit layouts.

On the register

Declared completion30 June 2027
Land area23,529 sq m (5.8 acres)
Homes registered506
Towers3
Unit mix2 × 1BHK+1 TOILET, 90 × 3BHK+2TOILET, 56 × 3BHK+3TOILET +STUDY, 145 × 3BHK+3TOILET, 110 × 2BHK+2TOILET, 1 × 1bedroom +1toilet, 17 × 3BHK +2T, 84 × 1BHK +1 TOILE

In context

Density87 homes per acre
Density in context69th percentile of 1118 Bengaluru East projects (median 75.7)

Values as crawled from the official K-RERA record; context percentiles name their comparison population.

What you can verify free on this page

The official K-RERA filing record, in plain English

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Legal status, approvals & the project team
  • Financials & construction progress from the quarterly filings
  • Location & connectivity

Registration and delivery

What does the register record for this project?

Brigade Calista - Phase 1 is registered with K-RERA as PRM/KA/RERA/1251/446/PR/030223/005683, and the promoter has declared completion for 30 Jun 2027.

30 Jun 2027

declared completion

Figures are the promoter's own filings as they stood when Quietlist last read the register. A declared completion date is a filing, not a handover commitment.

Source · K-RERA project register · read 10 Sep 2026

Project scale

How big is the project, and what is it declared to cost?

Brigade Calista - Phase 1 spans 23,529 sq m (5.81 acres), comprises 3 towers, registers 506 units, and is declared to cost ₹174.6 cr.

₹174.6 cr

declared project cost

5.81acres

23,529 sq m

506units

on the registration

1.44FAR

sanctioned

Scale and cost as the promoter registered them. The declared cost is the promoter's own estimate on the filing, not a valuation and not a price to a buyer.

Source · K-RERA project registration · read 10 Sep 2026

Promoter record

What else is this promoter on record for?

Brigade is the promoter of record on 68 projects registered with K-RERA, 31 of which are past their declared completion dates on the register.

68projects

registered with K-RERA

31past declared date

on the register

72%

average construction reported

Counted across Quietlist's full K-RERA register store, matched on the promoter name as it appears on each filing.

Source · K-RERA register, all projects · read 10 Sep 2026

Construction

How much construction has been reported?

Brigade Calista - Phase 1 reports 77% construction progress in its most recent quarterly filing with K-RERA.

77%

reported construction progress

The percentage the promoter filed at the last quarterly report. It is a filed figure, not an inspection, and it can lag site conditions between filings.

Source · K-RERA quarterly progress report · read 10 Sep 2026

Sales

How much has been booked?

Brigade Calista - Phase 1 reports 506 of 506 units booked in its most recent quarterly filing with K-RERA, about 100%.

100%booked

506 of 506 units

Booked share as the promoter filed it at the last quarterly report; this is the filed position, not current availability.

Source · K-RERA quarterly progress report · read 10 Sep 2026

🔒 What I’d do as a buyer here · Drawings Report

The report opens with what this project really is — read from its approved drawings — then the specific calls: the cheapest good way to buy here, the flat to say no to, what you can stop worrying about, and what to get in writing before you sign anything.

Unlock in the ₹4,999 report →

506
Registered units
₹174.6 Cr
Est. construction cost
Units profiled
52
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units506Total inventory registered with K-RERA.
Official carpet area41,730 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Official built-up area64,329 sqmUseful scale context when comparing density and project cost.
Registered land area23,529 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI1.44Higher FAR generally means a denser vertical build, subject to site layout and open-space design.
Registered towers/wings3Official tower/wing count in the K-RERA detail page.
Parking disclosed462 total (456 covered, 79 open) — 0.91 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Approved plan numberHPA/CC/265/2022-23Use this to match the sanctioned drawing set shown by the builder.
Plan approval date12-12-2022
Project start date20-01-2023

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
1BHK+1 TOILET10%53 sqm
3BHK+2TOILET7214%90 sqm
3BHK+3TOILET +STUDY388%111 sqm
3BHK+3TOILET357%99 sqm
2BHK+2TOILET194%76 sqm
3BHK+3TOILET +STUDY184%107 sqm
1bedroom +1toilet10%34 sqm
3BHK+3TOILET5611%100 sqm
3BHK +2T173%86 sqm
1BHK +1 TOILET +STUDY6713%41 sqm
2BHK+2TOILET377%75 sqm
3BHK+3TOILET184%103 sqm
2BHK+2TOILET10%77 sqm
3BHK+3TOILET367%96 sqm
1BHK+1 TOILET +STUDY10%59 sqm
2BHK+2TOILET5310%72 sqm
1BHK +1 TOILET +STUDY173%41 sqm
1BHK+1 TOILET10%51 sqm
3BHK+2TOILET184%85 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
Tower D1818518456.975 m
Tower E1814814756.975 m
Tower F1717313154 m

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 506 official flat/unit rows, matching the 506 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
3 BHK30885.2-110.7 sqm39.4-52.1 sqm308
2 BHK11071.8-76.8 sqm33.6-35.5 sqm110
1 BHK8834.1-58.6 sqm15.2-27.9 sqm44 (44 with 0)

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
Tower D18534.1-110.7 sqm15.2-52.1 sqm184 (1 with 0)
Tower F17340.6-102.8 sqm19.5-48.7 sqm131 (42 with 0)
Tower E14851.5-110.7 sqm23.9-52.1 sqm147 (1 with 0)
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
D 0030Tower D03 BHK99.6 sqm45.6 sqm1
D 0031Tower D02 BHK75.2 sqm34.8 sqm1
D 0032Tower D01 BHK58.6 sqm27.9 sqm1
D 0033Tower D02 BHK75.5 sqm35.0 sqm1
D 0034Tower D03 BHK110.7 sqm52.1 sqm1
D 0127Tower D11 BHK34.1 sqm15.2 sqm0

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~888 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 506 homes across 3 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 462 parking spaces for 506 homes (~0.9 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~38 sqm per home; across all 506 homes that is ~83% of the plot — the undivided shares sum to close to the whole plot.
Joint-development titleThis is (at least partly) a joint-development (JDA) project — the landowner and developer split the built units per an agreed ratio. Standard in Bengaluru, but it adds one check: confirm in writing that your specific unit falls in the developer's sale share, and ask to see the JDA's area-sharing clause so there's no dispute over who can sell you the flat.

Site & infrastructure

What this project's sanctioned plan shows — read for you
Where the plan is legible, the full report reads this project's layout plan filed with K-RERA and lays out what's on it: where the utilities and open space sit, how the site is laid out around them, and which way it faces. When a plan can't be read clearly, we tell you plainly rather than guess.
In the full report:Open space · Utilities · Orientation · Layout
See what the full read covers ↓or read a sample report first →

🔒 Which flat to ask for · Drawings Report

The flat-level read: which towers and floors to prefer and which to avoid, what the drawings put above, below and beside each flat, and the things on this site nobody at the sales desk will tell you about.

Unlock in the ₹4,999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

13 of 45 compliance document slots are filed as Not Applicable; the remaining 32 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (Electricity Permission Letter)
Water & sewage (BWSSB/KWSSB)✓ On file (Water Permission Letter)
Fire NOC✓ On file (Fire Force Department)
Pollution control (KSPCB)✓ On file (KSPCB)
Environmental clearance✓ On file (SEIAA)
Airport Authority height clearance✓ On file (Airport Authority of India)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

Complaints on this project's K-RERA page (21 complaints listed against this promoter)

ComplaintSubject (as filed)ProjectStatus
CMP/190802/0003774
02-08-2019
Project delay compensation & Veracity of the agreement & Brochure while bookingBrigade Panorama (another project by this promoter)DISPOSED AO
CMP/190915/0004196
15-09-2019
Waiting period more than 1.5 years, amenities built on kharab land, Club house not as per agreementBrigade Panorama (another project by this promoter)DISPOSED AO
CMP/190920/0004245
20-09-2019
Delay in paying the Delay CompensationBrigade Panorama (another project by this promoter)DISPOSED AO
CMP/200211/0005414
11-02-2020
Brigade group not given the compensation as per RERA and changes in the layout planBrigade Panorama (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/200513/0005880
13-05-2020
Refund of amount due to delay in registration/handoverBrigade Panorama (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/201130/0007159
30-11-2020
Brigade has backed out of delay compensation payment after earlier assuring to pay the sameBrigade Panorama (another project by this promoter)DISPOSED AUTHORITY BENCH6
CMP/210212/0007498
12-02-2021
Recovery of delay compensation, rental loss & Property tax amount with Interest for 6 years of delay caused by builder to deliver possession of flatPlumeria Lifestyle at Brigade Meadows (another project by this promoter)DISPOSED AUTHORITY BENCH4
CMP/210512/0007948
12-05-2021
BUILDER NOT ALLOWING INSPECTION OF OUR APARTMENTBrigade Buena Vista-Phase 2 (another project by this promoter)DISPOSED AUTHORITY BENCH4

Listed on the project's own K-RERA detail page (registration-exact source). Rows on the promoter's other projects are track-record context — read the subject text, it is the complainant's own filed wording.

Statutory approval status

RERA filing

Clean approvals profile: every applicable statutory NOC is on file — including Fire NOC, environmental clearance and pollution-control clearance (KSPCB), the clearances buyers most often find still pending. Nothing is outstanding among the statutory NOCs — which compliance documents are filed versus still under process is a separate matter, covered in Litigation & compliance above. Since these are developer-filed portal statuses, have your lawyer confirm them against the linked NOC copies.

4 further authority slots are marked not applicable by the regulator.

Authority / NOCStatusDateFile
Water supply and sewage boardApproved22-06-2022Brigade Calista - Water NOC.pdf
KSPCB- PCB (10 Acres to 125 Acres)Approved14-09-2022Brigade Calista - KSPCB.pdf
KSPCB- MOEF (Above 50 Acres)Approved28-02-2022Brigade Calista - Environment Clearance.pdf
KPTCL- BESCOMApproved29-07-2022Brigade Calista - BESCOM NOC.pdf
Fire and SafetyApproved18-06-2022Brigade Calista - Fire NOC.pdf
Airport Authority of IndiaApproved30-03-2022Brigade Calista - AAI NOC.pdf

Project team & certifications

RERA filing

K-RERA names 4 project professional/vendor rows across Chartered accountant, Engineer, Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Chartered accountantR. Srinivasan289862000Bengaluru Urban, Karnataka - 560003
EngineerS & S ASSOCIATES CONSULTING ENGINEERSBCCL/BL-3.6/E-0232/22-232008Bengaluru Urban, Karnataka - 560010
ArchitectMR. TILAK THOMASBCCL/BL-3.6A-972/2001-021992Bengaluru Urban, Karnataka - 560001
ContractorBrigade In House-1986Bengaluru Urban, Karnataka - 560055

Builder track record

RERA filing

Brigade has 68 other K-RERA-registered projects in our records — grouped across the several project-specific entities this developer registers under (e.g. this project is filed as “Brigade Enterprises”) (average reported construction progress 72%). 31 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

Latest quarterly filing (2026-Q1): ₹32.41 Cr collected from buyers, ₹18.51 Cr withdrawn from the project's escrow account.

Construction progress70% → 77% (+7 pts)
Units sold/booked as registered506/506 (100%)
Buyer collections in available QPRs₹76.92 Cr
Escrow withdrawals in available QPRs₹29.86 Cr (0.39x collections)

QPR figures are developer-filed quarterly disclosures. Collections and withdrawals are not a project valuation; they are a sanity check for whether sales, construction progress, and escrow draws appear directionally aligned.

Declared construction cost ÷ registered units averages to ₹34.5 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

RERA 70% project account is on file: KOTAK MAHINDRA BANK Lavelle Road Branch IFSC Code : KKBK0000442 Pin Code : 560001. RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Location & Connectivity

The nearest major job hub is ~10 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Whitefield IT hub10 km
Outer Ring Road / Manyata13 km
Bellandur–Marathahalli belt15 km
Kempegowda Int'l Airport15 km
MG Road / city centre17 km
Electronic City26 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

The approved drawings

7approved drawings on file
45other papers filed

Everything above is on this page already, free, from the government record. The drawings are different: the 7 approved sheets are the same drawings the builder filed to get Brigade Calista - Phase 1 approved — what sits under each tower, which floor holds machines, what the sales sheet leaves out. Nobody reads them for you. We do.

What that turns up — from other projects’ filings:

ATS Knightsbridge · Sector 124, Noida

You pay for 10,000 sq ft. The floor inside your home is 6,982 sq ft. The rest is walls, shared circulation and services. Get both numbers written into your agreement before you pay any booking amount.

Oberoi Elysian · Goregaon East, Mumbai

“The building is complete.” The tower has reached full height — true. The same filed certificate, same page: sanitary fittings 6% done. Ask for a possession date in writing.

Godrej Aristocrat · Sector 49, Gurugram

Paying extra for the top floor? The terrace drawing shows what sits on the slab above those flats: the overhead water tanks, the lift machine rooms and the roof machinery. Ask which flat sits under which.

Prestige Camden Gardens · Thanisandra, Bengaluru

The approved parking table asks for 12 visitor spaces. It shows 0. Two-wheeler spaces: also 0. Ask in writing where visitors will park.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Brigade Enterprises. View Brigade Enterprises's full track record →
Brigade Enterprises has 55 projects registered in Bangalore, 13 completed.

Other projects by this builder in Bangalore

Brigade Citrine
Filing overdue · 34% built · 93% sold
Brigade Citrine
Filing overdue · 34% built · 93% sold
Brigade Laguna
Filing overdue · 100% built · 100% sold
Brigade Oak Tree Place
Filing overdue · 100% built
Brigade Oasis - Phase 1
Filing overdue · 100% built
Brigade Oasis - Phase 1
Filing overdue · 100% built

Other RERA-registered projects in Krishnarajapuram

Trifecta Verdeen Resplandor ROW House Phase-3

Major developers building in Krishnarajapuram

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.