SHRIRAM GREEN FIELD PHASE 2

SHRIVISION TOWERS · Hosakote · K-RERA PRM/KA/RERA/1250/304/PR/171014/001220

Report coverage

K-RERA registry & builder-record report

What this report covers

  • Official K-RERA registry facts — units, cost, land area, towers, approvals
  • Complaint / litigation & compliance history
  • Builder delivery record across their K-RERA portfolio
  • Construction trajectory & sales pace from quarterly filings

To confirm directly with the builder

  • No dimensioned unit layouts could be confidently extracted from the filed plans.
Not yet
Completion certificate
None declared
Legal status
3
Other RERA projects by builder

🔒 The verdict & buyer playbook · Compliance report

The paid report opens with the overall risk rating, the specific red-flag findings, exactly what I'd do as a buyer in this project, who it suits, and the questions to put to the builder before you commit.

Unlock in the ₹999 report →

653
Registered units
₹243.5 Cr
Est. construction cost
Units profiled
25
RERA documents on file

Official Registry Facts

Official project scale

RERA filing

Registration-form facts from the K-RERA detail page: use these to sanity-check the builder brochure, parking allotment, and sanctioned-plan references before relying on plan-extracted approximations.

DisclosureOfficial valueWhy it matters
Registered units653Total inventory registered with K-RERA.
Official carpet area49,989 sqmRegulator-disclosed project-level carpet area, not vision-derived room sums.
Registered land area23,344 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~7.22Sanctioned floor-area ratio (≈168,437 sqm sanctioned FAR area ÷ 23,344 sqm land) — higher means a denser vertical build.
Registered towers/wings3Official tower/wing count in the K-RERA detail page.
Parking disclosed653 total (0 open) — 1.00 spaces/unitConfirm whether your quoted unit includes an allotted parking space and where it sits.
Project start date03-10-2017

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
APARTMENTS710100%49,989 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
G17203203-
H18247247-
J17203203-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 653 official flat/unit rows, matching the 653 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
2BHK37960.1-69.6 sqm0.0-0.1 sqm379
2+study20676.4 sqm0.1 sqm206
3BHK6889.2 sqm0.1 sqm68

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
H24760.1-76.4 sqm0.0-0.1 sqm247
G20360.1-89.2 sqm0.0-0.1 sqm203
J20360.1-89.2 sqm0.0-0.1 sqm203
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
G-102G12BHK69.6 sqm0.1 sqm1
G-103G12BHK69.6 sqm0.1 sqm1
G-104G12BHK60.1 sqm0.0 sqm1
G-105G12+study76.4 sqm0.1 sqm1
G-106G12+study76.4 sqm0.1 sqm1
G-107G12BHK60.1 sqm0.0 sqm1

What the numbers tell you

Synthesis from the official RERA scale, unit register, and land rows — the read a sales team won't volunteer.

Unit formatAverage official carpet area is ~757 sqft — mid-format homes (2–3BHK territory), not compact stock. This is a mid-scale project — 653 homes across 3 towers. Carpet is the RERA-defined usable area, so compare it against the 'super built-up' a broker quotes (typically 25–35% larger).
ParkingThe project declares 653 parking spaces for 653 homes (~1.0 per home) — about one space per home — adequate but tight if you have two cars.
Your land share (UDS)Undivided land share averages ~0 sqm per home; across all 653 homes that is ~0% of the plot — on the lower side — the undivided shares sum to noticeably less than the plot, worth asking the builder why before relying on it. Low UDS relative to land can mean the builder keeps land value the flat owners think they're buying.

🔒 Unit-by-unit guidance · Unit Guidance report

Which block and unit to prefer, the livability read on the filed plans, and a plan-by-plan walkthrough — the ₹2,999 guidance layer.

Unlock in the ₹2,999 report →

🔒 Full records — land title, amenities paperwork & document catalog · Compliance report

The complete land-title chain, the paperwork behind each declared amenity, and every document row on file with the regulator — the raw records the compliance read is built on.

Unlock in the ₹999 report →

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

No litigation declared on this project's K-RERA filing.

All 21 standard compliance document slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 31 Mar 2021 — which has passed with no OC on file.

Named utility/regulatory approvals

Electricity (BESCOM/ESCOM)✓ On file (All NOCs from Authority)
Water & sewage (BWSSB/KWSSB)✓ On file (All NOCs from Authority)
Fire NOC✓ On file (All NOCs from Authority)
Pollution control (KSPCB)✓ On file (All NOCs from Authority)
Environmental clearance✓ On file (All NOCs from Authority)
Airport Authority height clearance✓ On file (All NOCs from Authority)

"Not found in catalog" can mean the approval genuinely isn't on file yet, or that it doesn't apply to this project (K-RERA doesn't tell us which). Ask the builder directly for any marked not found before relying on it.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

1 K-RERA order on this project (PROJECT EXTENSION) — read the order copies on the K-RERA portal.

K-RERA complaint orders (88 complaints against a project of this name on K-RERA's orders register)

PartiesRelief soughtDisposalOrder date
Madhuparni Roy vs Shrivision Towers Private Ltd & 3 othersWe are requesting Rera look into complete matter and see if we can get fair compensation.AUTHORITY30/07/2024
SHIJU BHARATHAN vs SHRIIVISION TOWERS PVT LTDDelay InterestAUTHORITY30/06/2026
Sanat Kumar Chandravanshi vs SHRIVISION TOWERS PVT LTDCompensationAUTHORITY30/01/2024
VARUN KUMAR & KUMARI MADHU LATA vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSMonthly compensation from builder for delay in project deliveryAUTHORITY29/01/2024
Sapna Arundathi vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSMonthly Compensation from builder for delay in project deliveryAUTHORITY29/01/2024
Loknath Nayak & Srusti Bedatrayee Das vs Shrivision Towers Private Limited & 6 othersrefund the entire amount received by them from the complainants along with interest at the rate of the highest marginal cost of lending rate of State bank of India plus 2%AUTHORITY28/11/2024
Sunilkumar Deshpande vs SHRIVISION TOWERS PRIVATE LIMITEDProject to complete ; or to repay amount with all interest & tax paid; Hereby request RERA authority to do look into and provide relief to me; as I am paying EMI and rent too.AUTHORITY28/07/2022
K N V ANAND KUMAR vs SHRIVISION TOWERS PVT LTDDELAY COMPENSATIONAUTHORITY27/03/2024
RIMA GHOSH DAS & SOURABH GHOSH vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation fpr delay and order builder to stick to handover date commitment in future.AUTHORITY27/03/2024
Santanu Kumar Dash & Sunita Panda vs Shrivision Towers Private Limited & 3 othersCompensation and handover of my flat at the earliestAUTHORITY26/03/2024
Ranjit Prasad vs SHRIVISION TOWERS PRIVATE LIMITEDNeed compensation from the builder for the delayed years and monthsAUTHORITY26/02/2024
MS APARAJITA SINGH vs M/S.SHRIVISION TOWERS PVT LTDCompensation from builder for the delay.AUTHORITY25/09/2023
SIBIN SUNNY vs SHRIVISION TOWERS PRIVATE LIMITEDRefund of booking amount RS. 266,628/-AUTHORITY25/06/2022
SUNILKUMAR DESHPANDE & BHARATI DESHPANDE vs SHRIVISION TOWERS PRIVATE LIMITEDHereby request RERA authority to do look into and provide rent relief to me; as I am paying EMI and rent too.AUTHORITY25/03/2024
Rajani Kezhake vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation as per RERA for delay/stalled constructionAUTHORITY25/01/2024
Prakash & Komala B vs SHRIVISION TOWERS PRIVATE LIMITEDNeed compensation from the builder for the delayed years and monthsAUTHORITY25/01/2024
Vikramjit Singh & Prabhjot Kaur Walia vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSrequesting RERA to pass the judgement and order to defaulter to compensate the delay as per said terms and LawAUTHORITY25/01/2024
SURYAKANT BHARATI & NEHA PRIYA vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSMonthly compensation from builder for delay in project deliverAUTHORITY25/01/2024
SHAMANTH KUMAR M & LASYA BALE vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation from builder for delay in project deliveryAUTHORITY25/01/2024
Asim Kumar Priyadarshi vs SHRIVISION TOWERS PRIVATE LTDCompensation of delay as I have to pay EMI and RENT bothAUTHORITY23/09/2022
Sreenu Valeti & Sravani Kandra vs Shrivision Towers Private Limitedinterest on delay periodAUTHORITY23/04/2024
RAJESH ROSHAN vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSCompensation for significant delay in project completion for delayed time.AUTHORITY23/01/2024
SHOBHIT SAXENA & SHALINI vs SHRIVISION TOWERS PRIVATE LIMITEDRequesting RERA to facilitate compensation from builder for delay in project deliveryAUTHORITY23/01/2024
N Sanjay vs Shriram Green Field Phase 2Intrest on delay periodAUTHORITY19/10/2024
SANDEEP BHAT & ARTI KOUL vs BHARAT JUMRANI & FOUR OTHERSSince i am paying full emi alongwith rent with no immediate hope of getting own apartment delivered, i seek compensation for this delay so that at least my financial burden is taken care.AUTHORITY19/03/2024
Jitendra vs SHRIVISION TOWERS PRIVATE LIMITEDSeeking for early possession and compensation from builder for the project which is delayed by 1.5 years and still under constructionAUTHORITY19/02/2024
APARNA TRIPATHI vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation for the delay in Handover of G-606 Shriram greenfield Phase 2 projectAUTHORITY19/01/2024
Sukesh N Shetty vs SHRIVISION TOWERS PRIVATE LIMITED1) Delay compensation till the handover of the project happens from respondent 2) Request RERA authority to not to provide any further extension 3) Change GST rate to 1%. Refund of excess GST paid.AUTHORITY18/01/2024
Kamal Kishor Nayak vs SHRIVISION TOWERS PVT LTDCompensationAUTHORITY18/01/2024
Sangram Kumar Das vs SHRIVISION TOWERS PRIVATE LIMITEDNeed compensation from the builder for the delayed years and monthsAUTHORITY18/01/2024
Ravinder Pal Singh vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSCompensation and support on timely completion and handoverAUTHORITY18/01/2024
KUMAR KISLAY & SABITA KUMARI vs SHRIVISION TOWERS PRIVATE LIMITEDMonthly compensation from builder for delay in project deliveryAUTHORITY18/01/2024
ALOK KUMAR SINGH vs SHRIVISION TOWRS PRIVATE LIMITED & 3 OTHERSCompensation from builder for delay in project deliveryAUTHORITY18/01/2024
Leander Martin Andrade vs SHRIRAM PROPERTIES PVT LTDCompensation which is SBI repo rate plus 2% to be given immediately effective March 2021 as promised by promoter in the agreement.AUTHORITY17/11/2022
Manjula Kumar vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation for the delay in delivery since Apr 2021AUTHORITY17/11/2022
Manjula Kumar vs SHRIVISION TOWERS PRIVATE LTDCompensation for the delay in delivery since Mar 2021AUTHORITY17/11/2022
R VINOD KUMAR & DEEPA VINOD vs M/S SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERScompensation for delayed handoverAUTHORITY17/10/2023
VIJAYALAKSHMI KONAR vs SHRIVISION TOWERS PVT LTDRefund to be provided of complete Rs 2,93,479 and additional compensation for making me to wait for 2 years.AUTHORITY17/08/2022
Shashank Kaushik & Preeti Kaushik vs M/s Shrivision Towers Pvt Ltd & 6 othersDelay Interest, Direct for 3rd Party Inspection to measure the carpet area of the apartment, Direct the Respondent to adjust the sale consideration as per reduced carpet area.AUTHORITY17/04/2024
Srinath K Kutty & MRS. VINITHA V vs SHRIVISION TOWERS PVT LTDMonthly compensation from builder for delay in project deliveryAUTHORITY17/01/2024
PRAVIN PATIL & SNEHAL PUNUGADE vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation from builder for delay in handover as per the rule till the date of possessionAUTHORITY17/01/2024
Vishal Singh vs SHRIVISION TOWERS PVT LTDSeeking for right compensation amount due to delay in PossessionAUTHORITY14/11/2022
Amresh Kumar & Bhawana Ray vs SHRIVISION TOWERS PVT LTDInterest on delay periodAUTHORITY14/10/2024
Sonam Saxena & Prery Gupta vs SHRIVISION TOWERS PVT LTDNeed compensation from the builder for the delayed years and months.AUTHORITY14/06/2024
Kuchipudi Suresh Kumar vs Shrivision Towers Private LimitedInterest On Delay PeriodAUTHORITY14/06/2024
VENKATA PRADEEP PENTAPATI vs SHRIVISION TOWERS PVT LTDwe as a customer requesting compensation from BuilderAUTHORITY13/10/2023
Pooja P Shenoy vs M/S SHRIVISION TOWERS PVT LTD & 4 OTHERSCompensation of 4.5 - 5 lakhs considering we have paid 41.8 Lakhs till dateAUTHORITY13/10/2023
Ajith P vs SHRIVISION TOWERS PRIVATE LIMITEDTimely refund of amount(50k) paid along with the interest to compensate for the losses incurred.AUTHORITY13/05/2024
Babu Halan and Rani Babu vs Shrivision Towers Private Limitedinterest delay periodAUTHORITY13/05/2024
Rashmi T Shetty vs M/S SHRIVISION TOWERS PVT LTDComplaint for withdrawal from the project, Return of amount and CompensiationAUTHORITY12/10/2023
Neeraj Kumar Tiwari vs SHRIVISION TOWERS PVT LTD100% Refund in case of cancelation or possession by April 22 as per latest promise by builderAUTHORITY12/10/2022
Bijjam Venkateswara Reddy vs M/S SHRIVISION TOWERS PVT LTD & 3 OTHERSDelay delivery compensation as per agreement.AUTHORITY11/10/2023
Rohan Kir & Kavita Devi Rampal Varma vs M/S SHRIVISION TOWERS PVT LTD & 3 OTHERSCompensation from the builder for the delay in project deliveryAUTHORITY11/06/2024
Rohan Kir & Pammi Kir vs M/S SHRIVISION TOWERS PVT LTD & 3 OTHERSCompensation from the builder for the delay in project deliveryAUTHORITY11/06/2024
SHANAND CHANDRADAS vs SHRIVISION TOWERS PRIVATE LIMITEDRequest RERA authorities to relieve us from this burden by enforcing builder to declare & Pay us the Compensation and expedite construction workAUTHORITY11/01/2024
Dhiren Kumar Dutta vs SHRIVISION TOWERS PVT LTD & 3 OTHERSI request RERA to 1. Ask the builder to provide compensation for the delay 2. complete the project as soon as possibleAUTHORITY11/01/2024
RAHUL SINGH vs M/s Shrivision Towers Pvt LtdRequest Rera authorities to intervene and provide me the entitled compensation as per the agreementAUTHORITY09/10/2024
Mukesh Gupta vs M/S SHRIVISION TOWERS PVT LTDDelivery of the property along with compensationAUTHORITY09/10/2024
Yashashwini Basetty vs SHRIVISION TOWERS PRIVATE LIMITEDRequesting RERA to intervene and help us to cancel the booking without any cancellation fees and advise builder to refund the full amount we have paid him till date with bank interest.AUTHORITY09/08/2023
Shashank Kumar Jha & Debasri Chatterjee vs SHRIVISION TOWERS PVT LTDCompensation for the delay in completing the projectAUTHORITY08/07/2024
JITENDRA MISHRA & MRS. NEHA KUMARI vs SHRIVISION TOWERS PRIVATE LIMITEDProject completion and compensationAUTHORITY08/07/2024
ROHIT KUMAR & NEHA SINGH vs SHRIVISION TOWERS PRIVATE LIMITED & 5 OTHERSDelay Interest and Conpensation.AUTHORITY08/04/2024
Balaji S & Deeparani P vs M/s Shrivision Towers Private Limited & 2 othersMonthly compensation from builder for delay project deliveryAUTHORITY08/04/2024
Vamsi Krishna Vanimisetti vs SHRIVISION TOWERS PRIVATE LIMITEDRequest RERA To direct the builder to complete the project at the earliest and to pay interest for the delayed period.AUTHORITY08/04/2024
DHANANJAY BHASKARRAO DESHMUKH vs SHRIVISION TOWERS PVT LTD & 3 OTHERSInterest on delay periodAUTHORITY08/04/2024
NIDHI TOMAR & ASHEESH GUPTA vs SHRIVISION TOWERS PVT LTDI need RERAs help in getting a proper interest on the delay period.AUTHORITY08/04/2024
AVADHESH KUMAR & MRS. NEETA KUMARI vs SHRIVISION TOWERS PRIVATE LIMITEDSupport required from RERA authorities 1. To get compensation adjusted in demand being sent as I cannot affort EMI and house rent together due to delay in project 2. To get clear timeline of deliveryAUTHORITY08/02/2024
K T Sushendran vs SHRIVISION TOWERS PRIVATE LTDWe would request the handover of the flat at the earliest, Failing to which we need to be compensated to pay our Pre-Emi and Rent.AUTHORITY07/10/2022
Girish Balasubramanian & Ramapriya Kumar vs Shrivision Towers Private Limited & 3 OthersAppropriate compensation for delay in completion and handover of unit H-1106AUTHORITY06/11/2024
Atul Kumar Singh vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation from builder for delayed year and months with interestAUTHORITY05/07/2023
Shailendra Jain & Ruchi Jain vs Shrivision Towers Private limitedNeed RERA's immediate attention and action on builder to get us some relief, please put some pressure on builder to make some good progress and plan to deliver our home soon + compensationAUTHORITY05/04/2023
MURIGEPPA BELLAD & RUPASHRI BELLAD vs M/S SHRIVISION TOWERS PRIVATE LIMITEDCompassion for delay in possession. I am appealing to seek your kind support in getting delay interest payment as soon as possible. It will be great help as my finances are stretched now because I amAUTHORITY05/01/2024
SUPRIYA AMOGH THALY & AMOGH DATTATRAI THALY vs SHRIVISION TOWERS PRIVATE LIMITED & 2 OTHERSMonthly compensation from builder as per RERA for delay in project deliveryAUTHORITY04/03/2024
DHIRAJ LAXMAN NAIK KURADE & VRUSHALI DHIRAJ NAIK KURADE vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSInterest On Delay Period from Builder towards Project DeliveryAUTHORITY04/03/2024
PRITA NARENDRAN & NARENDRAN BALAN MANIYEDATH vs SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSConsolidated interest payment by builder for delayed possessionAUTHORITY04/03/2024
Himanshu Singh Tomar vs SHRIVISION TOWERS PRIVATE LIMITEDI request RERA to 1. Ask the builder to provide compensation for the delay 2. complete the project as soon as possibleAUTHORITY04/01/2024
PRAVEEN KUMAR PADARTHI & VENKATA HARIPOORNA PADARTHI vs SHRIVISION TOWERS PRIVATE LIMITEDNEED compensation from builder for the delayed years and monthsAUTHORITY04/01/2024
Awanish Pandey vs SHRIVISION TOWERS PRIVATE LIMITEDCompensation from builder for the delay periods.AUTHORITY04/01/2024
AMIT KUMAR vs M/S. SHRIVISION TOWERS PRIVATE LIMITED & 3 OTHERSSeeking Interest Compensation from builder for the delayed periodAUTHORITY04/01/2024
Prateek Chakraborty & Shelly Bhowmik vs Shrivision Towers Private Limited & 6 Othersrefund the entire amount received by the Respondents i.e., Rs. 27,04,800/- along with interest, compensation of Rs.15 lakhs and legal costAUTHORITY03/07/2025
Soumyabindu Bharadwaj vs SHRIVISION TOWERS PVT LTD & SIX OTHERSrefund the entire amount received by the Respondents i.e., Rs. 23,00,000 along with statutory Interest, Compnestaion and cost of the litigation.AUTHORITY03/07/2025
Kartik R Bhat vs SHRIVISION TOWERS PRIVATE LIMITEDSir I would expect the Buolder to either process full refund including interest due for the amount paid or clear all the bank dues as per their promise to pay all pre emi.AUTHORITY03/07/2025
APURVA ANAND vs SHRIVISION TOWERS PVT LTD & THREE OTHERSIt is most humbly and respectfully prayed from this Hon’ble Authority to: Direct the Promoter to refund the total paid amount along with the interest @8.5%.AUTHORITY03/07/2025
Shailendra Jain & Ruchi Jain vs Shrivision Towers Private Limited & 3 othersMonthly compensation from builder until final handover of the apartment in livable conditionAUTHORITY03/07/2025
Sachin Bharadwaj vs SHRIVISION TOWERS PRIVATE LIMITEDI request RERA to provide a fair compensation for delay and financial crunch caused by the builder. I believe a compensation 10 lakh Ruppees would be a fair value.AUTHORITY03/04/2024
Mr Subramonian N vs SHRIRAM GREEN FIELD PHASE 2Hand Over Possession of the Schedule 'C' Property & 'interest on delay period' for an amount of Rs. 15,00,000/-AUTHORITY02/07/2025
Yashashwini Basetty vs SHRIVISION TOWERS PRIVATE LIMITEDRequesting RERA to intervene and help us to cancel the booking without any cancellation fees and advise builder to refund the full amount we have paid him till date with bank interest.AUTHORITY01/09/2025
Anubhav Bajpai vs SHRIVISION TOWERS PRIVATE LIMITEDHelp the stranded owners with clear compensation plan from builders and right to cancel with full refund (including GST and applicable interest) for those who don't wish to stay in the project.AUTHORITY01/06/2023

⚠ Matched by PROJECT NAME (the orders register carries no registration number) — confirm the respondent above is this project's builder before relying on it.

Project team & certifications

RERA filing

K-RERA names 2 project professional/vendor rows across Architect, Contractor. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
ArchitectKadur Krishna Siddharth-2004HRBR 2nd Block, Kalyan Nagar Bangalore
ContractorICONICA CONSTRUCTIONS-2015Indiranagar 2nd Stage, Bangalore

Builder track record

RERA filing

Shrivision Towers has 3 other K-RERA-registered projects in our records. 1 is past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹37.3 lakhs per unit — the developer's own declared construction/development cost, not a sale price. K-RERA filings don't disclose what the builder is charging, so this can't tell you whether you're getting a fair deal — only you comparing your quoted price against comparable listings nearby can answer that.

Construction photo filings

RERA filing

K-RERA has 1 project-photo upload.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit.

Location & Connectivity

The nearest major job hub is ~11 km away — a real but liveable commute to the nearest job hub — factor peak-hour traffic.

LandmarkStraight-line
Whitefield IT hub11 km
Outer Ring Road / Manyata15 km
Kempegowda Int'l Airport15 km
Bellandur–Marathahalli belt17 km
MG Road / city centre19 km
Electronic City27 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Shrivision Towers.
Shrivision Towers has 4 projects registered in Bangalore.

Other projects by this builder in Bangalore

Shriram Green Field Phase 1
No filings
Shriram Green Field Phase 1
No filings
Shriram Green Field Phase 2
No filings

Other RERA-registered projects in Krishnarajapuram

Trifecta Verdeen Resplandor ROW House Phase-3

Major developers building in Krishnarajapuram

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.