Spending a few crores on a home? ₹4,999 to check what you’re buying.

Check what the plans put beside your home, below it and in front of it. The view, nearby buildings and shared facilities can change what you are buying.

From another project · Prestige Park Grove

Avoid bad decisions, only go for the best homes.

Read the complete sample: unit choices, layout illustrations, important risks and questions for the builder. Its findings concern the named sample, not this project.

Read the Project Review sample ↗
Prestige Park Grove Project Review · first page
First page of the complete sample.
30 Jun 2022declared completionK-RERA registration · read 25 Oct 2026
53registered unitsK-RERA registration · read 25 Oct 2026

Free project details

Registration read 25 Oct 2026

Registered units and project size

4 BHK
52

Filed categories, unchanged · K-RERA registration · read 25 Oct 2026

The whole registration

2.6registered acres

20.4registered units per acre

The average covers the registered land and all registered unit types. It does not describe the space, outlook or surroundings of an individual unit.

RERA details for Life By The Lake

K-RERA · PRM/KA/RERA/1251/309/PR/210119/003787

Project facts and comparisons

On the register

Declared completion30 June 2022
Land area10,522 sq m (2.6 acres)
Homes registered53
Tower/wing entries2
Unit mix52 × 4 BHK

In context

Density20.4 homes per acre
Density in context10th percentile of 529 Bengaluru North projects (median 75.3)

Source: K-RERA. Each comparison names the group of projects used.

Project areas, parking and inventory

Project areas and parking

RERA filing
DisclosureOfficial valueWhy it matters
Registered units53Total inventory registered with K-RERA.
Official carpet area13,210 sqmTotal carpet area reported for the project.
Registered land area10,522 sqmThe land area attached to this K-RERA registration.
Sanctioned FAR/FSI~1.67Sanctioned floor-area ratio (≈17,576 sqm sanctioned FAR area ÷ 10,522 sqm land) — higher means a denser vertical build.
Registered tower/wing entries2Official tower/wing count in the K-RERA detail page.
Parking total (reconciled)185Separate filed counts; these categories may overlap and are not added together.
Open-parking field0Separate filed counts; these categories may overlap and are not added together.
Garage field0Separate filed counts; these categories may overlap and are not added together.
Project start date01-04-2016

Official inventory & towers

RERA filing

K-RERA registration tables showing the project mix and tower/wing scale. Use this to sanity-check sales claims such as "only large homes", "low density", or "plenty of parking" against the filed inventory.

Registered inventory mix

TypeUnitsShareOfficial carpet area
4 BHK52100%13,210 sqm

Registered tower / wing summary

Tower/wingFloorsUnitsParkingHeight
A439136-
B41449-

Official unit register

RERA filing

K-RERA detail-page flat rows: exact unit numbers, official carpet area, UDS, and parking lots. 53 official flat/unit rows, matching the 53 registered units disclosed above. Use this as a checklist against the specific flat number in your cost sheet and draft agreement.

By unit type

Unit typeRowsCarpet areaUDSParking lots
4BHK45117.3-700.7 sqft39.0-7,160.0 sqft138
5BHK8268.9-278.2 sqft2,101.0-2,597.0 sqft32

By tower / wing

Tower/wingRowsCarpet areaUDSParking lots
A39117.3-700.7 sqft39.0-7,160.0 sqft117
B14191.8-278.2 sqft1,558.0-2,597.0 sqft53
Show sample official unit rows
UnitTowerFloorTypeCarpetUDSParking
C-001A14BHK234.7 sqft1,983.0 sqft3
C-002A14BHK234.7 sqft1,988.0 sqft3
C-201A14BHK259.2 sqft2,007.0 sqft3
C-301A14BHK259.5 sqft2,219.0 sqft3
D-001A14BHK234.5 sqft1,974.0 sqft3
D-002A14BHK234.6 sqft1,979.0 sqft3

Legal, Approvals & Project Team

Litigation & compliance

RERA filing

Litigation status was not supplied in the captured record. This is not confirmation that there are no cases.

1 of 38 compliance document slots are filed as Not Applicable; the remaining 37 slots have usable uploaded filings.

No completion certificate (OC) on file yet — project has not been declared complete.

⚠ Registration validity has lapsed: originally due 30 Jun 2022 — which has passed with no OC on file.

Approval documents

Electricity (BESCOM/ESCOM)Document listed: BESCOM
Water & sewage (BWSSB/KWSSB)Document listed: BWSSB
Fire NOCDocument listed: Fire Force Department
Pollution control (KSPCB)Document listed: KSPCB
Environmental clearanceDocument listed: SEIAA
Airport Authority height clearanceDocument listed: Airport Authority of India

A listed file does not confirm approval. An unlisted file does not establish that an approval is missing or required. Check the documents and their applicability before relying on them.

K-RERA enforcement record (the regulator's own defaulter list & penalty orders)

⚠ Listed on K-RERA's official DEFAULTER list.

Penalty orders on record:

ViolationUnder sectionPenaltyOrder date
Non Submission Of Annual Report 2021 22Section 4(2)(l)(D)₹4,165,48014/12/2023

Project team & certifications

RERA filing

K-RERA names 3 project professional/vendor rows across Architect, Contractor, Structural engineer. Use this to cross-check whose certificates, drawings, and contractor commitments support the filing; final reliance still belongs with your lawyer/technical reviewer.

RoleNameRegistration / licenceSinceLocality
Architectstudio PARAMETRIC-2010K.R. Road, Basavanagudi
ContractorPinnacle Prime Constructions Pvt. Ltd.-2006Vijayanagar, Bangalore-560 040
Structural engineerA.Ramachandran---

Builder track record

RERA filing

Keya Homes has 4 other K-RERA-registered projects in our records (average reported construction progress 64%). 2 are past their declared completion deadline with no completion certificate recorded — but because K-RERA publishes OCs inconsistently, a project that has actually been finished and handed over still shows up this way, so this overstates real delays, especially for a high-volume established builder. That is a lower delayed rate than the K-RERA average across Bengaluru on the same measure.

Read this as a list to spot-check for a pattern of genuinely stalled projects, not as a delay rate — pull up a few of the builder’s other K-RERA registrations and check whether they’ve actually been delivered.

Financials & Construction Progress

Financial disclosures

RERA filing

⚠ No quarterly financial disclosures (collections, escrow withdrawals) on record, despite no completion certificate yet — meaning we can't verify the project's cashflows against its construction progress. Worth asking the builder directly why no quarterly filings are available.

Declared construction cost ÷ registered units averages to ₹129.3 lakhs per unit — the developer's own declared construction/development cost, not a unit agreement or asking price. This project-cost average cannot establish whether a quoted unit price is fair. Compare the exact unit, area basis, date and included charges in any price evidence.

RERA 70% project account is on file: HDFC Double road (IFSC HDFC0001206, a/c …1145). RERA requires 70% of buyer collections to sit in this separate, project-specific account, drawn only against certified construction milestones — confirm your payments are made to THIS account (not a general builder account) and that it appears on your allotment letter.

Construction photo filings

RERA filing

K-RERA has 2 project-photo uploads.

These are developer-uploaded progress photos in the official document catalog. We do not treat them as proof of current site condition; use them as a prompt to ask for newer dated photos or a site visit. Individual filings are listed in the document catalog below.

Location & Connectivity

The nearest of the listed job hubs is about 5 km in a straight line from the mapped location. Road distance and travel time will differ.

LandmarkStraight-line
Outer Ring Road / Manyata5 km
MG Road / city centre13 km
Kempegowda Int'l Airport16 km
Bellandur–Marathahalli belt19 km
Whitefield IT hub21 km
Electronic City28 km

Straight-line distances from the geocoded project locality (the RERA address is an area, not a door) — directional, not door-to-door drive times. Check the actual road route, the nearest metro station and daily-need shops/schools/hospitals on a site visit.

Free · Watch this project

We'll email you when this project's RERA record changes, and send the 14-point booking checklist with the first email.

Something went wrong — email hello@quietlist.in.

✓ You're watching — we'll email you if the RERA record changes.

Built by Keya Homes. View Keya Homes's full track record →
Keya Homes has 5 projects registered in Bangalore, 1 completed.
1 complaints on the K-RERA register against Keya Homes in Bangalore.

Other projects by this builder in Bangalore

The Urban Forest
Filing overdue · 28% built · 30% sold
The Lake Terraces
Filing overdue · 100% built · 48% sold

Other RERA-registered projects in Yelahanka

Major developers building in Yelahanka

Figures are the developer's own quarterly disclosures on the Karnataka RERA register. "Built" is the highest construction % filed; "sold" is booked units over total. Not a claim about the developer's intent. Explore every project on our Bangalore project-health tool.

Registration last seen on RERA: 25 Oct 2026. Document and inventory dates are shown in their sections.