RERA projects by locality

RERA-registered projects in Panvel, Mumbai

2692 registered projects on record · 885 under construction

Under construction in Panvel — possession ahead (885)

147 Green
Under construction · possession by Sep 2029
26 Icon
Under construction · possession by Dec 2028
4D Avinya
Under construction · possession by Dec 2030
99 Silver Oaks
Under construction · possession by Dec 2033
Aaditya Lakshmi Narayan
Under construction · possession by Dec 2029
Aaditya OM SAI Prasad
Under construction · possession by Dec 2026
Aaiji Complex
Under construction · possession by Dec 2028
Aaiji Galaxy
Under construction · possession by Jul 2027
Aaiji Infinity
Under construction · possession by Dec 2029
Aakar Bellisimo
Under construction · possession by Dec 2028
Aarsh Bhanudas
Under construction · possession by Dec 2026
Abhinandan Iris
Under construction · possession by Sep 2027
Abri Pacific
Under construction · possession by Dec 2026
Acacia
Under construction · possession by Dec 2028
Adinath Crystal
Under construction · possession by Dec 2028
Adinath Reva
Under construction · possession by Jun 2027
Adinath Solaris
Under construction · possession by Dec 2029
Adinath Solitaire
Under construction · possession by Jun 2028
Aditya Residency
Under construction · possession by Apr 2027
Admire Icon
Under construction · possession by Dec 2031
Aikyam Two
Under construction · possession by Jun 2029
Aishwarya Cooperative Housing Society
Under construction · possession by Aug 2026
Ajit
Under construction · possession by Dec 2028
Alankara Paradise
Under construction · possession by Dec 2026
Alliance Corner
Under construction · possession by Dec 2027
Ambaji Residency
Under construction · possession by Jul 2026
Amber Apartment CHS
Under construction · possession by Dec 2026
Ambers Dnyaneshwar Capital
Under construction · possession by Nov 2026
Ambika Aura
Under construction · possession by Dec 2026
Ambika Niwas
Under construction · possession by Mar 2027
Amrut Akshat
Under construction · possession by Dec 2029
Amrut Dham
Under construction · possession by Dec 2026
Amrut Dhara
Under construction · possession by Dec 2028
Amrut Jewels
Under construction · possession by Dec 2031
Amrut Palace
Under construction · possession by Dec 2027
Amrut Vishva
Under construction · possession by Dec 2027
Amrut Wani
Under construction · possession by Dec 2029
Amrutwel Co-Operative Housing Society Limited
Under construction · possession by Apr 2027
Anandam III
Under construction · possession by Dec 2028
Anandam IV
Under construction · possession by Mar 2031
Anant Commerz
Under construction · possession by Dec 2030
Anant Serene Park
Under construction · possession by Dec 2026
Anant Serene Park II
Under construction · possession by Jun 2028
Anant Serene Park III
Under construction · possession by Dec 2028
Anant Serene Villas
Under construction · possession by Dec 2027
Anant Serene Villas II
Under construction · possession by Dec 2027
Ananta Paradise
Under construction · possession by Dec 2028
Ananta Residency
Under construction · possession by Jun 2027
Aniruddha Pooja
Under construction · possession by Dec 2026
Ankita CHS LTD
Under construction · possession by Sep 2028
Anmol Sonai Heritage
Under construction · possession by Dec 2029
Antal Aspire
Under construction · possession by Dec 2027
Anupam CO OP HSG SOC LTD
Under construction · possession by Apr 2029
Anupama Gurukul
Under construction · possession by Nov 2027
Anusaya Residency
Under construction · possession by Dec 2026
Apex Avenue
Under construction · possession by Dec 2026
Apex Plus
Under construction · possession by Dec 2026
Apex Prime
Under construction · possession by Dec 2029
Apramit
Under construction · possession by Dec 2026
Aramus Pride 26
Under construction · possession by May 2030
ARC ONE
Under construction · possession by Dec 2026
Arham One
Under construction · possession by Aug 2027
Arihant Amber
Under construction · possession by Dec 2026
Arihant Aspire Phase I
Under construction · possession by Dec 2027
Arihant Aspire Phase II
Under construction · possession by Dec 2030
Arihant Aspire Phase III
Under construction · possession by Dec 2031
Arihant Aspire Phase IV
Under construction · possession by Mar 2032
Arihant Clan Aalishan Phase I
Under construction · possession by Sep 2026
Arihant Clan Aalishan Phase II
Under construction · possession by Dec 2027
Arundhati MGD CHS
Under construction · possession by Dec 2028
Aryan Corner
Under construction · possession by Apr 2027
Ascons Garnet
Under construction · possession by Mar 2027
Ashtavinayak Corner
Under construction · possession by Jun 2027
Ashtavinayak Diamond
Under construction · possession by Dec 2026
Ashtavinayak Miracle
Under construction · possession by Dec 2028
Aster
Under construction · possession by Dec 2031
Atharv
Under construction · possession by Sep 2028
Atharva Sankalp
Under construction · possession by Dec 2026
Athos -1
Under construction · possession by Jun 2027
Aura Residency
Under construction · possession by Mar 2028
Aurum
Under construction · possession by Jun 2027
Autograph
Under construction · possession by Dec 2026
Autumn Breeze
Under construction · possession by Dec 2027
Avantika CO-OP HSG SOC
Under construction · possession by Dec 2026
Avencia
Under construction · possession by Dec 2027
Avighna
Under construction · possession by Dec 2026
Avion
Under construction · possession by Dec 2029
Ayansh Crown
Under construction · possession by Dec 2029
Ayati Angan
Under construction · possession by Dec 2027
Baba Residency
Under construction · possession by Dec 2026
Badridham
Under construction · possession by Dec 2027
Balaji Archstone
Under construction · possession by May 2028
Balaji Evara
Under construction · possession by Jun 2027
Balaji Evergreen
Under construction · possession by Dec 2029
Balaji Heritage
Under construction · possession by Sep 2026
Balaji Pride - Phase I
Under construction · possession by Mar 2027
Balaji Symphony Phase 3
Under construction · possession by Jun 2028
Balaji Symphony Phase 4
Under construction · possession by Dec 2029
Balaji Vista
Under construction · possession by May 2027
Bansidhar
Under construction · possession by Dec 2026
Banubai Residency
Under construction · possession by Dec 2026
Bayview
Under construction · possession by Jul 2026
Belmac Infinity
Under construction · possession by Jun 2029
Bhagwati Elysia - II
Under construction · possession by Mar 2027
Bhagwati Elysia III
Under construction · possession by Dec 2029
Bhagwati Elysia IV
Under construction · possession by Dec 2029
Bhakti Hill
Under construction · possession by Dec 2028
Bhanu Heights
Under construction · possession by Dec 2028
Bharat Enclave
Under construction · possession by Jun 2028
Bhaveshwar Feather
Under construction · possession by Dec 2027
Bhaveshwar Hills
Under construction · possession by Dec 2027
Bhaveshwar Infinity
Under construction · possession by Dec 2030
Bhaveshwar Iris
Under construction · possession by Dec 2027
Bhaveshwar ONE
Under construction · possession by Dec 2027
Bhaveshwar Pushp
Under construction · possession by Dec 2026
Bhaveshwar Rudra
Under construction · possession by Dec 2027
Bhaveshwar Valencia
Under construction · possession by Dec 2026
Bhaveshwar Vellora
Under construction · possession by Dec 2028
Bhimashankar
Under construction · possession by Dec 2029
Bhosale Bluebell
Under construction · possession by Mar 2027
Blancora
Under construction · possession by Dec 2026
Blue Heaven
Under construction · possession by Dec 2026
Brillante
Under construction · possession by May 2028
Business Icon
Under construction · possession by Sep 2027
Capital ONE
Under construction · possession by Dec 2030
Century 16
Under construction · possession by Dec 2029
Century Tower
Under construction · possession by Jun 2027
Chaitanya Hills
Under construction · possession by Jun 2029
Chaitanya Pralhad
Under construction · possession by Jun 2027
Chaitanya Pride
Under construction · possession by Dec 2026
Chaitanya Residency
Under construction · possession by Dec 2026
Chaitanya Sadan
Under construction · possession by Jun 2027
Chander Niwas
Under construction · possession by Dec 2026
Chintan Apartment
Under construction · possession by Dec 2027
Cityopia Wing -E
Under construction · possession by Dec 2029
CJ Greens
Under construction · possession by Dec 2026
Cloud 21
Under construction · possession by Sep 2028
Cloud Castle
Under construction · possession by Aug 2026
Courtyard
Under construction · possession by May 2027
Creative Marvel
Under construction · possession by May 2028
Crown
Under construction · possession by Dec 2027
Crystal Plaza
Under construction · possession by Dec 2027
D N Heritage
Under construction · possession by Dec 2029
Dani SKY
Under construction · possession by Dec 2027
Ddsr Anuparva CO-Operative Housing Society Limited
Under construction · possession by Dec 2027
Deep Bindiya Chsl
Under construction · possession by May 2029
Deep Destiny-2
Under construction · possession by Dec 2029
Deep Nakshtra
Under construction · possession by Dec 2028
Deep Niketan
Under construction · possession by Dec 2029
Delight Heritage
Under construction · possession by Dec 2026
Delta Elite
Under construction · possession by Aug 2026
Delta Greens
Under construction · possession by Mar 2027
Delta Heights
Under construction · possession by Jul 2026
Delta Hills
Under construction · possession by Sep 2026
Delta Palacio
Under construction · possession by Jul 2027
Delta Prestige
Under construction · possession by Dec 2029
Delta Riviera
Under construction · possession by Sep 2026
Delta Signature
Under construction · possession by Dec 2029
Delta Vistara
Under construction · possession by Dec 2027
Devashree Aangan
Under construction · possession by Dec 2026
Devkrupa Shanti Kunj
Under construction · possession by Dec 2027
Devpriya
Under construction · possession by Jun 2027
Devta Vision Ganaranga Paradise
Under construction · possession by Oct 2026
Devta Vision Sukhkarta Apartment
Under construction · possession by Oct 2026
Dhanraj Legacy
Under construction · possession by Jan 2031
Dhara Residency
Under construction · possession by Dec 2029
Dharti Corner
Under construction · possession by Dec 2026
Dharti Krishna
Under construction · possession by Mar 2027
Dhoondiraj Hotels PVT LTD
Under construction · possession by Dec 2026
Dhriti Aura
Under construction · possession by Dec 2028
Divine
Under construction · possession by Dec 2027
Divine Hill View
Under construction · possession by Sep 2027
Diya Trinity
Under construction · possession by Dec 2026
DKG Lotus
Under construction · possession by Jun 2028
Dream City
Under construction · possession by Dec 2027
Dwarka
Under construction · possession by Oct 2030
Dwarka Rukmini
Under construction · possession by Dec 2027
Ebony
Under construction · possession by Dec 2029
Eden Paradise
Under construction · possession by Jul 2027
Ekadrishta
Under construction · possession by Dec 2029
Elite Enclave
Under construction · possession by Dec 2030
Emperia Hill Crest
Under construction · possession by Dec 2028
Empire Heights
Under construction · possession by Dec 2026
Epsilon Venkatesh
Under construction · possession by Dec 2029
Estella
Under construction · possession by Dec 2028
Excel Polaris
Under construction · possession by Jun 2029
Future Amrut
Under construction · possession by Jun 2027
Future Corner
Under construction · possession by Mar 2030
Future Crown
Under construction · possession by Mar 2030
GAJ Oasis
Under construction · possession by Sep 2026
Galaxy Aura
Under construction · possession by Mar 2027
Galaxy Prime
Under construction · possession by Dec 2026
Gami Mirava
Under construction · possession by Dec 2029
Ganesha Greens
Under construction · possession by Dec 2026
Ganga Shankar Heights
Under construction · possession by Sep 2026
Garg Sky
Under construction · possession by Dec 2028
Gauri Nandan
Under construction · possession by Dec 2027
Gayatri Emerald
Under construction · possession by Dec 2027
Girija Heights
Under construction · possession by Dec 2027
Godavari Grandeur
Under construction · possession by Oct 2026
Godrej Golf Side Estate
Under construction · possession by Sep 2026
Godrej Golf Side Estate II
Under construction · possession by Dec 2028
Gokuldham Residency
Under construction · possession by Feb 2027
Golden View
Under construction · possession by Dec 2026
Govind Ameya
Under construction · possession by Oct 2026
Govind Chintamani
Under construction · possession by Dec 2026
Govind Greens
Under construction · possession by Nov 2026
Green Acre
Under construction · possession by Dec 2028
Green Park
Under construction · possession by Dec 2028
Green Terraces, Godrej City, Panvel
Under construction · possession by Dec 2032
Green View
Under construction · possession by Sep 2026
Green Village
Under construction · possession by Dec 2030
Guru Anmol
Under construction · possession by Dec 2030
Guru Krupa Heights
Under construction · possession by Dec 2026
Gurudarshan Residency
Under construction · possession by Apr 2027
Guruji Residency
Under construction · possession by Dec 2026
Gurukrupa Heights
Under construction · possession by Dec 2027
Gurukrupa Homes
Under construction · possession by Dec 2028
Gurukrupa ONE
Under construction · possession by Jun 2027
Gurukrupa Residency
Under construction · possession by Dec 2026
Gurumauli Co-Operative Housing Society Limited
Under construction · possession by Dec 2026
Happy Homes
Under construction · possession by Mar 2027
Hari OM Bhakti
Under construction · possession by Dec 2028
Hari Om Heights
Under construction · possession by Dec 2029
Hari Priya
Under construction · possession by Jun 2027
Hari Priya I
Under construction · possession by Dec 2029
Hari Priya II
Under construction · possession by Dec 2027
Hari Residency
Under construction · possession by Jan 2028
Hari Vitthal Complex 1
Under construction · possession by Dec 2026
Harikrupa Grand
Under construction · possession by Dec 2026
Harlequin Tulip
Under construction · possession by Jun 2029
HEM Sanwariya
Under construction · possession by Mar 2027
Heramba Residency
Under construction · possession by Jun 2027
Hill Crest
Under construction · possession by Dec 2029
Hill View
Under construction · possession by Dec 2026
Hillcrest
Under construction · possession by Dec 2027
Hills Paradise
Under construction · possession by Mar 2027
Hirakunj
Under construction · possession by Jun 2028
Housai
Under construction · possession by Dec 2026
Hrishikesh Elite
Under construction · possession by Dec 2026
Hrishikesh Palm
Under construction · possession by Dec 2027
Imperial City
Under construction · possession by Dec 2028
Imperial Crown
Under construction · possession by Dec 2026
Indiabulls Park 1
Under construction · possession by Mar 2027
Indiabulls Park 2
Under construction · possession by Jun 2027
Indiabulls Park 3
Under construction · possession by Apr 2028
Indiabulls Park 4
Under construction · possession by Dec 2028
Indiabulls Park 5
Under construction · possession by Dec 2028
Infinite Siddhi
Under construction · possession by Jul 2028
Infragate Palace
Under construction · possession by Dec 2026
Infragate Taj
Under construction · possession by Dec 2026
Infragate Terrace
Under construction · possession by Dec 2027
Invicta
Under construction · possession by Dec 2028
Invicta Eclat
Under construction · possession by Dec 2030
Iris
Under construction · possession by Dec 2028
Iris View
Under construction · possession by Dec 2027
J B Opera
Under construction · possession by Dec 2026
J Prime Avenue
Under construction · possession by Dec 2029
J Prime Swastik
Under construction · possession by Dec 2030
J. K. Paradise
Under construction · possession by Dec 2026
Jai Ganesh Sapphire
Under construction · possession by Dec 2026
JAI Malhar Apartment Phase - III
Under construction · possession by Sep 2028
Jai Malhar Apartment Phase IV
Under construction · possession by Jul 2028
Jai Mata Di
Under construction · possession by Nov 2026
Jasmine
Under construction · possession by Dec 2031
JAY Vitthal Complex 1
Under construction · possession by Dec 2028
Jaydev Heights
Under construction · possession by Dec 2026
Jayesh Callisto
Under construction · possession by Dec 2026
Jayesh Infinity
Under construction · possession by Nov 2029
Jayram Residency Phase-I
Under construction · possession by Dec 2028
Jayram Residency Phase-II
Under construction · possession by Dec 2028
Jeswani Luxurios
Under construction · possession by Jun 2028
Jewel OF Panvel Phase -I
Under construction · possession by Jun 2027
Jindal Aura
Under construction · possession by Dec 2027
Jindal Enclave
Under construction · possession by Mar 2027
Jindal Imperia
Under construction · possession by Mar 2027
Jindal Legacy
Under construction · possession by Mar 2027
JOY Aura
Under construction · possession by Dec 2027
Jupiter Arihant
Under construction · possession by Dec 2026
JW Pride
Under construction · possession by Dec 2027
Kailash Park
Under construction · possession by Dec 2027
Kalakar Patrakar CHS LTD
Under construction · possession by Dec 2027
Kalash Greens
Under construction · possession by Mar 2028
Kalash Serenity
Under construction · possession by Dec 2029
Kalpavruksha Oneness
Under construction · possession by Jul 2029
Kamdhenu Aura
Under construction · possession by Mar 2029
Kanakia Valley
Under construction · possession by Dec 2030
Kanha Heights
Under construction · possession by Dec 2027
Kanha Sanwariya
Under construction · possession by Oct 2027
Kartikya Vatika
Under construction · possession by Jun 2029
Kashi Avenue
Under construction · possession by Dec 2026
Kasturi Aurelia
Under construction · possession by Dec 2028
Kavya Hills
Under construction · possession by Dec 2029
Keshar Exotica
Under construction · possession by Dec 2027
Kings Court
Under construction · possession by Jul 2032
Konnark Astra
Under construction · possession by Dec 2033
Konnark High Castle
Under construction · possession by Dec 2028
Konnark Oasis
Under construction · possession by Aug 2028
Konnark Stellar
Under construction · possession by Dec 2032
KPS Park
Under construction · possession by Dec 2027

+585 more under construction in Panvel.

Also registered in Panvel (1807)

A 1 Rishikesh
Declared completion Dec 2024
A N Flora
Declared completion Jan 2024
A P Avenue
Declared completion Dec 2024
A.N Orchid
Declared completion Aug 2024
A.p.darshan
Declared completion Dec 2022
A.s.ornate
Declared completion Dec 2025
Aadar Developers
Declared completion Jun 2023
Aaditya Gurukrupa
Declared completion Dec 2021
Aahvaan Avenue
Declared completion Mar 2022
AAI Residency
Declared completion Jun 2026
Aaiji Bliss
Declared completion Dec 2019
Aaiji Hills
Declared completion Dec 2018
Aaiji Park
Declared completion May 2022
Aaiji Residency
Declared completion Dec 2022
Aamod
Declared completion Dec 2025
Aaradhna CHS
Declared completion Oct 2022
Aaradhya
Declared completion Jul 2023
Aarambh Infracon
Declared completion Jun 2026
Aarini Apartments
Declared completion Jun 2024
Aarish Heights
Declared completion Mar 2024
Aarsh Corner
Declared completion Mar 2023
Aarsh Landmark
Declared completion Jun 2024
Aarsh Madhukar Corner
Declared completion Oct 2023
Aatmay Elixir
Declared completion Oct 2020
Aayushi Apartment
Declared completion Dec 2019
Aayushi Enclave
Declared completion Dec 2022
Aayushi Garden
Declared completion Dec 2025
Aayushi Homes
Declared completion Dec 2019
Aayushi Pride
Declared completion Mar 2025
Aayushi Villa
Declared completion Mar 2022
Abhimaan Altura
Declared completion Apr 2026
Abhinandan Cloris
Declared completion Mar 2025
Abhinandan Corner
Declared completion Dec 2025
Aboti Landmark
Declared completion Jun 2023
Abri Nest
Declared completion Dec 2021
Adhya Abhi
Declared completion Dec 2022
Adinath Amber
Declared completion Mar 2024
Adinath Anmol
Declared completion Dec 2024
Adinath Aradhana
Declared completion Dec 2021
Adinath Astha
Declared completion Dec 2021
Adinath Ganga
Declared completion Dec 2023
Adinath Naman
Declared completion Mar 2024
Adinath Sagar
Declared completion Dec 2023
Adinath Sanskruti
Declared completion Mar 2024
Adinath Srushti
Declared completion Mar 2024
Adinath Vandan
Declared completion May 2024
Aditi Avenue
Declared completion Dec 2021
Aditi Garden
Declared completion Dec 2021
Aditya Iris
Declared completion Jun 2022
Aditya Park
Declared completion Dec 2022
Aditya Sanas
Declared completion Dec 2021
Advik Residency
Declared completion Jun 2023
Advika Iconic
Declared completion Dec 2023
Adwaita
Declared completion Mar 2022
Ahilya Residency
Declared completion May 2023
Aishwarya Appartment
Declared completion Dec 2020
Ajinkya
Declared completion Dec 2021
Akashdeep
Declared completion Dec 2023
Akshar Emperia Garden
Declared completion Dec 2023
Akshar Rivergate - Plot F
Declared completion Dec 2024
Akshar Rivergate Plot B
Declared completion Dec 2025
Akshar Rivergate Plot E
Declared completion Dec 2025
Alankaar Residency
Declared completion Dec 2022
Alankara Height
Declared completion Mar 2026
Alliance
Declared completion May 2023
Allyd Pearl
Declared completion Nov 2022
Aman Astha
Declared completion Mar 2024
Aman Avenue
Declared completion Dec 2021
Aman Paradise
Declared completion Dec 2024
Aman Sarita
Declared completion Dec 2024
Ambaji Apartment
Declared completion Dec 2022
Ambika Nandan
Declared completion Dec 2021
Ambika Niwas
Declared completion Dec 2021
Ameya Arcade
Declared completion Dec 2024
Amit Niwas
Declared completion Jun 2024
Amol Samarth
Declared completion Jan 2021
Amore Corner
Declared completion Feb 2021
Amrut Garden
Declared completion Mar 2024
Amrut Kunj
Declared completion Jun 2023
Amrut Villa
Declared completion Dec 2022
AN Sunrise
Declared completion Feb 2021
Anand
Declared completion Sep 2020
Anand Niwash
Declared completion Jun 2024
Anand Sagar
Declared completion Sep 2023
Anand Vihar
Declared completion Dec 2023
Anandam Phase - II
Declared completion Jun 2026
Anandghan CO-Operative Housing Society Limited
Declared completion Jan 2024
Anandi Heights
Declared completion Nov 2024
Anant Ganesha
Declared completion Dec 2019
Anant Niwas
Declared completion Dec 2022
Anant Residency
Declared completion Sep 2024
Anant Sakshi
Declared completion Dec 2022
Anant Sapphire
Declared completion Dec 2022
Anant Srushti Residency
Declared completion Aug 2023
Ananta Complex
Declared completion Aug 2022
Ananya Crystal
Declared completion Dec 2022
Aniruddha Garden
Declared completion Jun 2023
Anirudha SAI
Declared completion Dec 2023
Anmol Corner
Declared completion Dec 2024
Anmol Nirmiti
Declared completion Feb 2025
Anusaya Apartment
Declared completion Dec 2022
Anusaya Heights
Declared completion Dec 2018
Anuvishwa
Declared completion Dec 2025
Apartment 20
Declared completion Mar 2021
Apex Aarambh
Declared completion Dec 2023
Apex Address
Declared completion Jun 2023
Apex Corner
Declared completion Dec 2022
Apex Ganga
Declared completion Dec 2022
Apex Home
Declared completion Dec 2023
Apex Love
Declared completion Dec 2020
Apex Morning
Declared completion Jun 2023
Apex Nest
Declared completion Oct 2018
Apex ONE
Declared completion Jun 2024
Apex Paradise
Declared completion Jun 2026
Apex Park
Declared completion Oct 2022
Apex Shilp
Declared completion Dec 2021
Apex Shukan
Declared completion Dec 2022
Apex Step
Declared completion Jan 2019
Apex Villa
Declared completion Mar 2019
Apex Villa
Declared completion Dec 2021

+1,687 more registered in Panvel.

Aggregated from the state RERA registers. 'Under construction' is inferred from a declared completion date still in the future; registration is not completion — confirm the occupancy certificate and current status before you commit.