RERA projects by locality

RERA-registered projects in Wakad, Pune

663 registered projects on record · 228 under construction

Under construction in Wakad — possession ahead (228)

41 Commune
Under construction · possession by Dec 2027
41 Commune - Hinjewadi
Under construction · possession by Dec 2028
41 Zoy
Under construction · possession by Jun 2029
57 Elevate
Under construction · possession by Dec 2026
A G Landmark
Under construction · possession by Dec 2026
A R Mirador
Under construction · possession by Dec 2031
Abharan
Under construction · possession by Jul 2028
Acorn Park Phase - II
Under construction · possession by Dec 2026
Aditya Enclave
Under construction · possession by Mar 2027
Adya Alcove
Under construction · possession by Dec 2028
Akshara Harmony
Under construction · possession by Dec 2026
Akshara Serenity
Under construction · possession by Oct 2026
Akshara Serenity B And C
Under construction · possession by Dec 2026
Akshay Anantam
Under construction · possession by Mar 2028
Altis One
Under construction · possession by Dec 2028
Amarillo Phase 2
Under construction · possession by Dec 2028
Anand Vrindavan
Under construction · possession by Apr 2027
ANP Bizsquare
Under construction · possession by Jul 2026
ANP Memento
Under construction · possession by Sep 2026
ANP Ultimus
Under construction · possession by Jun 2027
Anshul Casa J Building
Under construction · possession by Apr 2030
Anshul Casa K Building
Under construction · possession by Apr 2031
Antalya Next
Under construction · possession by Mar 2028
Apostrophe Hinjawadi Tower A
Under construction · possession by Dec 2028
Apostrophe Hinjawadi Tower B
Under construction · possession by Dec 2027
AR Amora
Under construction · possession by Dec 2026
Arbor Vista
Under construction · possession by Dec 2027
Ashiana Malhar Phase 4
Under construction · possession by Sep 2029
Ashiana Malhar Phase I And Commercial Block
Under construction · possession by Oct 2026
Ashiana Malhar Phase II
Under construction · possession by May 2027
Ashiana Malhar Phase III
Under construction · possession by Mar 2028
Aventis
Under construction · possession by Jun 2030
Avishkar Ridhima
Under construction · possession by Dec 2027
Bappa Towers
Under construction · possession by Dec 2026
Blue Ridge-The Promenade
Under construction · possession by Dec 2030
Brahma Tower Phase II
Under construction · possession by Dec 2030
Building B2 Eon Homes
Under construction · possession by Dec 2027
Building B3 Eon Homes
Under construction · possession by Jun 2030
Building C1 Eon Homes
Under construction · possession by Jan 2029
Building C2 Eon Homes
Under construction · possession by Dec 2027
Ceratec West Winds
Under construction · possession by Aug 2028
Chandrarang Serenity
Under construction · possession by Dec 2028
Courtyard ONE C Bldg
Under construction · possession by Dec 2026
Divine Reves, Wing A
Under construction · possession by Dec 2028
Fairmont
Under construction · possession by Aug 2026
Fusion Towers Phase III
Under construction · possession by Jul 2026
Fusion Towers Phase IV
Under construction · possession by Dec 2026
Ganga Asmi
Under construction · possession by Jun 2027
Ganga Asmi Wing 2
Under construction · possession by Dec 2028
Ganga Asmi Wing 3
Under construction · possession by Dec 2030
Garve Buildcon O Wing 57 Avenue
Under construction · possession by Dec 2026
Geras Joy On The Tree Tops Project B
Under construction · possession by Dec 2031
Global Inspira
Under construction · possession by Dec 2026
Godrej Eden Estate Phase 3
Under construction · possession by Mar 2027
Godrej Evergreen Square
Under construction · possession by Oct 2030
Godrej Woodsville
Under construction · possession by Nov 2026
Gulmohar Atrium
Under construction · possession by Jun 2029
Highness
Under construction · possession by Dec 2032
Hinjewadi Phase 3 - Tower 13
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 14
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 15
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 16
Under construction · possession by Dec 2030
Hinjewadi Phase 3 - Tower 2
Under construction · possession by Jun 2031
Hinjewadi Phase 3-Tower 1
Under construction · possession by Jun 2031
Hinjewadi Premium - Tower 10
Under construction · possession by Jul 2032
Hinjewadi Premium - Tower 8
Under construction · possession by Jan 2029
Hinjewadi Premium - Tower 9
Under construction · possession by Jun 2031
Hinjewadi Premium-Tower 7
Under construction · possession by Dec 2028
Hinjewadi Project
Under construction · possession by Jun 2027
Hinjewadi Project-Tower 1
Under construction · possession by Jun 2027
Hinjewadi Project-Tower 4 And 5
Under construction · possession by Jun 2028
Hinjewadi Project-Tower 6
Under construction · possession by Sep 2028
Hinjewadi Project-Tower A
Under construction · possession by Jun 2031
Hinjewadi Project-Tower B
Under construction · possession by Jun 2031
Ibz Hinjewadi
Under construction · possession by Dec 2029
Infinia
Under construction · possession by Dec 2026
IRA
Under construction · possession by Sep 2027
Itrend City Life
Under construction · possession by Dec 2027
Jalvan Homes Phase - I
Under construction · possession by Dec 2028
Jay Ganesh
Under construction · possession by Dec 2026
Joy On The Tree Tops Project A
Under construction · possession by Mar 2030
Kalp ONE
Under construction · possession by Dec 2028
Kamalaraj Athens B And C
Under construction · possession by Jun 2027
Kamalraj Athens A
Under construction · possession by Jun 2027
Kings County Phase - I
Under construction · possession by Dec 2027
Kohinoor Central Park - Phase 1
Under construction · possession by Dec 2028
Kohinoor Central Park - Phase II
Under construction · possession by Oct 2029
Kohinoor Famville
Under construction · possession by Dec 2028
Kohinoor Regalia Towers
Under construction · possession by Jun 2030
Kohinoor Royale Towers
Under construction · possession by Dec 2030
Kuber Antonia A Wing
Under construction · possession by Apr 2027
Kuber Antonia C Wing
Under construction · possession by Apr 2027
Kuber Properties Kuber Antonia B
Under construction · possession by Apr 2027
La Centra
Under construction · possession by Dec 2026
La Centra Phase 2
Under construction · possession by Dec 2026
Lagom
Under construction · possession by Dec 2027
Landmarc
Under construction · possession by Jun 2030
Laxmi Bappa
Under construction · possession by May 2027
Legend Aaradhyam Phase I
Under construction · possession by Dec 2027
Life Republic Sector R1 - 1st Avenue
Under construction · possession by Dec 2027
Life Republic Sector R13/13th Avenue/aros/phase I
Under construction · possession by Dec 2026
Life Republic Sector R13/13th Avenue/aros/phase-II
Under construction · possession by Jun 2028
Life Republic Sector R22/22nd Avenue - Atmos/phase - I
Under construction · possession by Oct 2027
Life Republic Sector R22/22nd Avenue - Atmos/phase-II
Under construction · possession by Dec 2028
Life Republic Sector R31/31st Avenue/24k-Espada
Under construction · possession by Dec 2026
Life Republic Sector R5/5th Avenue - Canvas/phase I
Under construction · possession by Sep 2029
Life Republic/sector R10/10th Avenue/universe/phase V
Under construction · possession by Dec 2027
Life Republic/sector R16/16th Avenue/arezo-J, K, D Building And Shops
Under construction · possession by Mar 2028
Lodha Hinjewadi Phase 3
Under construction · possession by Jun 2031
Luxton
Under construction · possession by Jun 2030
Manor Crystal
Under construction · possession by Sep 2026
Megapolis Mystic - G
Under construction · possession by Dec 2026
Megapolis Shimmer - A1
Under construction · possession by Mar 2029
Menlo Estella
Under construction · possession by Dec 2028
Menlo Hashtag Studios
Under construction · possession by Dec 2028
Menlo Homes Hinjewadi Phase 2
Under construction · possession by Dec 2028
Menlo Professional Park- Hinjawadi
Under construction · possession by Jun 2029
Meridian Studios
Under construction · possession by Dec 2028
Mihir Amara Building - A4
Under construction · possession by Dec 2026
Mihir Amara Phase 1
Under construction · possession by Dec 2026
Mihir Amara Phase II
Under construction · possession by Dec 2026
Millennium Emerald
Under construction · possession by Dec 2026
Mindspace
Under construction · possession by Dec 2027
Monarque BY VTP Luxe Phase 2
Under construction · possession by Dec 2029
Monarque BY VTP Luxe Phase 3
Under construction · possession by Dec 2030
Morella Phase II
Under construction · possession by Dec 2026
MY Home Wakad
Under construction · possession by Jun 2027
Nakshatra
Under construction · possession by Dec 2026
Netizen
Under construction · possession by Jul 2026
Nivaas Business Square
Under construction · possession by Oct 2028
Niwas
Under construction · possession by Jan 2029
Olive Orchard
Under construction · possession by Jul 2026
P.k.canopus
Under construction · possession by Jun 2029
Palm Springs PH-II D-Wing
Under construction · possession by Dec 2027
Param
Under construction · possession by Dec 2027
Park Titan Phase III
Under construction · possession by Jun 2027
Park Titan Phase IV
Under construction · possession by Mar 2028
Park Titan Phase V
Under construction · possession by Aug 2029
Park59
Under construction · possession by Sep 2026
Parth Kiona
Under construction · possession by Dec 2029
Pashankar Waves
Under construction · possession by Dec 2030
Platinum 9 World Tower
Under construction · possession by Dec 2031
Platinum Towers
Under construction · possession by Dec 2028
Prime Nest
Under construction · possession by Jun 2027
Prime Pinnacle
Under construction · possession by Sep 2027
Prissa Pratham
Under construction · possession by Dec 2030
Prithvi Paradise NXT
Under construction · possession by Oct 2027
Pune Wakad Project
Under construction · possession by Jun 2031
R7 - THE Altius
Under construction · possession by Jan 2030
Rajveer Garima Phase 1
Under construction · possession by Dec 2029
Rajveer Garima Phase 2
Under construction · possession by Dec 2031
RGS Forte
Under construction · possession by Mar 2027
Rohan Nidita Phase 1
Under construction · possession by Mar 2027
Rohan Nidita Phase 2
Under construction · possession by Dec 2028
Rohan Viti
Under construction · possession by Dec 2027
Roshan Milestone Wing A
Under construction · possession by Dec 2026
Roshan Milestone Wing B
Under construction · possession by Dec 2026
Roshan Milestone Wing C
Under construction · possession by Dec 2026
Roshan Milestone Wing D
Under construction · possession by Dec 2027
Roshan Milestone Wing E
Under construction · possession by Dec 2028
Roshan Milestone Wing F
Under construction · possession by Dec 2028
Roshan Milestone Wing G
Under construction · possession by Dec 2028
Roshan Milestone Wing H
Under construction · possession by Dec 2028
Royal Oak
Under construction · possession by Dec 2026
Runaa Saukhyam
Under construction · possession by Mar 2029
SAI Icon Wing B
Under construction · possession by Dec 2026
Sai Pleasure
Under construction · possession by Jun 2027
Sai Proviso Emporis Phase 1
Under construction · possession by Dec 2026
Sensorium, Phase VI
Under construction · possession by Sep 2026
Sensorium, Phase VII
Under construction · possession by Dec 2026
Sentosa Elite
Under construction · possession by Dec 2026
Shankeshwar Kingsland Phase 1
Under construction · possession by Dec 2032
Shiv Malhar
Under construction · possession by Dec 2026
Shubh Swarovski Wing A
Under construction · possession by Oct 2028
Siddhi Nisarg C Building
Under construction · possession by Dec 2026
Siddhis Sapphire Homes
Under construction · possession by Dec 2027
Signature Park Phase - I
Under construction · possession by Mar 2027
SKY Sanctum
Under construction · possession by Dec 2028
SKY World
Under construction · possession by Oct 2026
Skyhigh Towers - D1d2
Under construction · possession by Dec 2026
Skyhigh Towers D3
Under construction · possession by Dec 2027
Skyhigh Towers D4
Under construction · possession by Dec 2029
Skyline
Under construction · possession by Dec 2027
Sonchandr Residency
Under construction · possession by Sep 2026
Sportsville
Under construction · possession by Dec 2026
Sportsville Phase 1
Under construction · possession by Dec 2027
Spring Residency
Under construction · possession by Sep 2026
Sukhwani Ambar
Under construction · possession by Jun 2027
Sukhwani Skylines
Under construction · possession by Dec 2027
Suratwala Mark Plazzo- Building C, D AND E
Under construction · possession by Dec 2027
Tejas Imperial
Under construction · possession by Oct 2026
Terminal ONE
Under construction · possession by Dec 2026
Terminal Two
Under construction · possession by Dec 2029
The Aqua Retreat At Godrej Park World
Under construction · possession by Sep 2031
The Camelia Phase - 1
Under construction · possession by Jan 2027
The Crown Greens Plot 7 Phase 2 A
Under construction · possession by Dec 2028
The Embercrest
Under construction · possession by Dec 2031
The Gale At Godrej Park World
Under construction · possession by Mar 2029
The Greenfront At Godrej Park World
Under construction · possession by Dec 2030
The Legend Phase II
Under construction · possession by Dec 2027
THE Raya Phase I
Under construction · possession by Dec 2029
THE Ridges 41
Under construction · possession by Dec 2029
TOP Towers - B
Under construction · possession by Jul 2027
Treasure Troves
Under construction · possession by Dec 2030
Triaa Galaxy - Phase 1
Under construction · possession by Jun 2027
Trident E F
Under construction · possession by Dec 2027
Truston Aspen
Under construction · possession by Dec 2029
Vaishnavi Homes A Wing
Under construction · possession by Dec 2028
Vantage Capital
Under construction · possession by Mar 2027
Varad Residency
Under construction · possession by Sep 2026
Vardhaman Skysymphony
Under construction · possession by Dec 2030
VJ Indilife Wakad
Under construction · possession by Jun 2027
VTP Bellissimo Phase 1
Under construction · possession by Dec 2026
VTP Bellissimo Phase 2
Under construction · possession by Dec 2027
VTP Bellissimo Phase 3
Under construction · possession by Mar 2027
VTP Monarque Phase 1
Under construction · possession by Dec 2029
VTP Volare
Under construction · possession by Dec 2029
Wakad Central Park
Under construction · possession by Dec 2027
Weone 121
Under construction · possession by Dec 2026
Weone 153
Under construction · possession by Dec 2026
Westgate Business Park
Under construction · possession by Dec 2029
Winds OF JOY Project A
Under construction · possession by Nov 2028
Winds OF JOY Project B
Under construction · possession by Oct 2028
Yashone Eternitee Phase 2
Under construction · possession by Jun 2027
Yashwin Urbo Centro - Phase 1
Under construction · possession by Dec 2027
Yashwin Urbo Centro Phase 2
Under construction · possession by Jun 2029
You57 Tower D
Under construction · possession by Feb 2028
Zenone B Building
Under construction · possession by Sep 2027

Also registered in Wakad (435)

172W Inclusive Housing
Declared completion Jun 2026
173 West Oaks
Declared completion Dec 2023
32 Pinewood Drive -Phase 1
Declared completion Jun 2021
32 Pinewood Drive -Phase2
Declared completion Dec 2025
32nd Avenue
Declared completion Dec 2021
39 Avenue
Declared completion Nov 2020
41 Estera
Declared completion Apr 2019
7 Square
Declared completion Mar 2026
A R Atlas
Declared completion Dec 2025
A R Imperia
Declared completion Dec 2024
Abhiaayu Heights
Declared completion Jan 2024
Accord
Declared completion Jun 2023
ACE Augusta
Declared completion Sep 2022
Acorn Park Phase I
Declared completion Jun 2024
Acropolis
Declared completion Jan 2020
Acropolis 2
Declared completion Apr 2022
Adora
Declared completion Dec 2017
Aishwarya Residences
Declared completion Dec 2017
Akshara Platinum
Declared completion Jun 2023
Akshay Heights
Declared completion Nov 2022
Akshay Residency
Declared completion Dec 2019
Akshay Residency A Building
Declared completion Dec 2022
Aloha
Declared completion Dec 2024
Amarillo Phase 1
Declared completion Sep 2024
ANP - Landmark
Declared completion Mar 2023
ANP Retreat
Declared completion Jun 2025
Anshul Casa G Building
Declared completion Apr 2022
Anshul Casa H Building
Declared completion Oct 2025
Anshul Casa I-Building
Declared completion Jun 2026
Apostrophe Hinjawadi Tower C
Declared completion Dec 2025
Apostrophe Next
Declared completion Dec 2022
Apple Aroma
Declared completion Jun 2019
Apple Glory
Declared completion Dec 2020
Ariana Imperial
Declared completion Mar 2022
Armadaphasei
Declared completion Dec 2019
Ashirwad House
Declared completion Jun 2024
Astria Residency
Declared completion Dec 2018
Athashree
Declared completion Dec 2025
Athashri Xion
Declared completion Mar 2019
Atlanta
Declared completion Dec 2024
Atlanta II Phase I
Declared completion Jun 2019
Atlantaiii
Declared completion Dec 2023
Atulya-Maan
Declared completion Dec 2025
Aura
Declared completion Dec 2024
Austin Plaza
Declared completion Dec 2021
Avalon Height
Declared completion Mar 2022
B. J. Heights
Declared completion Jun 2026
Bappa Residency
Declared completion Oct 2020
Basera Eternity
Declared completion Jun 2022
Beverly Hills - Building F
Declared completion Mar 2021
Bhakti Genesis D Wing
Declared completion Sep 2018
Bhama Center
Declared completion Mar 2026
Bhama Pearl
Declared completion Dec 2018
Bhoomi Orion
Declared completion Dec 2019
Bhuvi
Declared completion Dec 2017
Birds County
Declared completion Dec 2017
Bloomville
Declared completion Dec 2024
Bloomville Building C
Declared completion Dec 2024
Blue Bells Phase 1
Declared completion Mar 2022
Blue Bells Phase 2
Declared completion Dec 2023
Blue Ridge - THE Lofts
Declared completion Dec 2022
Blue Ridge Project C Land T18 And T19
Declared completion Dec 2018
Blue Ridge Project E Land T24 And T25
Declared completion Jun 2024
Blueridge-The Groves
Declared completion Jun 2026
Bonheur
Declared completion Jun 2024
Bonheur A Wing
Declared completion Apr 2026
Brahma Tower I A And B Wing
Declared completion Mar 2026
Broadway - Brooklyn, Manhattan And EWS
Declared completion Jun 2024
Building A2 Eon Homes
Declared completion Dec 2021
Building A3 Eon Homes
Declared completion Dec 2023
Building B1 Eon Homes
Declared completion Jun 2025
Building C3 Eon Homes
Declared completion Dec 2025
Building D1 Eon Homes
Declared completion Jun 2025
Building D2 Eon Homes
Declared completion Dec 2023
Building D3 Eon Homes
Declared completion Dec 2021
Casa Height
Declared completion Dec 2021
Casa Imperia
Declared completion Jun 2026
Casa Imperia EWS
Declared completion Mar 2025
Chandan Colozium
Declared completion Dec 2024
Citrine
Declared completion Sep 2019
City Avenue
Declared completion Dec 2020
Cleveland Park
Declared completion Oct 2025
Courtyard One Phase 1
Declared completion Nov 2020
Courtyard One Phase 2
Declared completion Jun 2021
Crossroads
Declared completion Mar 2018
Crystal Heights
Declared completion Dec 2017
Daffodils Avenue Phase 1
Declared completion Mar 2018
Daffodils Avenue Phase 2
Declared completion Mar 2018
Daffodils Avenue Phase 3
Declared completion Mar 2018
Daffodils Avenue Phase 4
Declared completion Mar 2018
Deron Business Square
Declared completion Jun 2021
Destination Hinjawadi
Declared completion Dec 2024
Dew Drop
Declared completion Dec 2017
Divine Reves, Wing B, Phase I
Declared completion Dec 2023
Dolphin Matrix
Declared completion Jun 2026
Dreamcastle
Declared completion Jun 2019
Elanza
Declared completion Dec 2025
Elite Square
Declared completion Dec 2024
Elysia Towers
Declared completion Jun 2025
Elysium
Declared completion Jun 2024
Emerald PH-IV
Declared completion Jun 2019
Epitome Phase I
Declared completion Dec 2021
Epitome Phase II
Declared completion Dec 2025
Estella
Declared completion Jun 2023
Ethos C Wing
Declared completion Dec 2022
Festive Residency
Declared completion Dec 2025
Florencia Phase 1
Declared completion Jun 2022
Fortune Shilp
Declared completion Mar 2022
Fusion Towers Phase I
Declared completion Jun 2021
Fusion Towers Phase II
Declared completion Dec 2022
Future Elite
Declared completion Mar 2025
Gagangiri Dreamland
Declared completion Jun 2018
Gagangiri Niwas
Declared completion Jun 2018
Gaikwad Nirvanas
Declared completion Mar 2026
Galaxy
Declared completion Dec 2023
Gaurav Icon Tower
Declared completion Mar 2026
Gaurav Pride
Declared completion Dec 2017
Genesiis
Declared completion Mar 2026
Geras Adara
Declared completion Oct 2023
Geras Imperium Rise
Declared completion May 2022

+315 more registered in Wakad.

Aggregated from the state RERA registers. 'Under construction' is inferred from a declared completion date still in the future; registration is not completion — confirm the occupancy certificate and current status before you commit.