RERA projects by locality

RERA-registered projects in Kalyan, Mumbai

631 registered projects on record · 287 under construction

Under construction in Kalyan — possession ahead (287)

36 Mansions A Wing
Under construction · possession by Dec 2027
9 Square
Under construction · possession by Dec 2026
Aawas Darshan CO-Operative Housing Society LTD
Under construction · possession by Oct 2027
Abhimanyu Residency
Under construction · possession by Dec 2027
Ammu Co-Op Housing Society Ltd
Under construction · possession by Mar 2027
Amrut Heights
Under construction · possession by Dec 2028
Amrut Heights
Under construction · possession by Apr 2029
Anand 21 Uptown
Under construction · possession by Aug 2026
Anand Upvan NX
Under construction · possession by Dec 2029
Anant Sagar Building - E
Under construction · possession by Dec 2026
Atharva Heights
Under construction · possession by Dec 2026
Atlantic Iris
Under construction · possession by Dec 2026
Atmaram Heights
Under construction · possession by Jun 2027
Avdhut
Under construction · possession by Dec 2026
Balaji Aqua
Under construction · possession by Nov 2029
Balaji Garden
Under construction · possession by Mar 2029
Balaram Heights
Under construction · possession by Sep 2027
Bhakti Windsor
Under construction · possession by Oct 2026
Bhushan Anand CO OP HSG SOC
Under construction · possession by Sep 2026
Bileshwar
Under construction · possession by Dec 2028
Building G SAI Icon Phase 2
Under construction · possession by Dec 2028
Capsule Business Hub
Under construction · possession by Dec 2026
Chavan Advaitam
Under construction · possession by Dec 2026
Chavan Star
Under construction · possession by Jul 2026
Corner Stone
Under construction · possession by Dec 2026
Cross Wind
Under construction · possession by Jun 2028
Daffodil Co- Op Housing Society Ltd
Under construction · possession by Dec 2026
Dalvi Amigo
Under construction · possession by Dec 2028
Desai Celeste
Under construction · possession by Nov 2027
Dream Atlantis
Under construction · possession by Dec 2030
Dream Avalon
Under construction · possession by Dec 2027
Earth Park Building NO 1
Under construction · possession by Dec 2031
Earth Park Building NO 2
Under construction · possession by Dec 2031
Earth Park Building NO 3
Under construction · possession by Dec 2031
Earth Park Building NO 4
Under construction · possession by Dec 2031
Earth Park Building NO 5
Under construction · possession by Dec 2031
Empire Tower
Under construction · possession by Dec 2026
Evara Homes
Under construction · possession by Mar 2028
Fatima SKY
Under construction · possession by Dec 2027
Ganesh Prasad
Under construction · possession by Apr 2027
Gauri Ganpati CO. Operative Housing Society LTD
Under construction · possession by Nov 2026
Gayatri Anand
Under construction · possession by Dec 2028
Gayatri Samarth
Under construction · possession by Mar 2029
Gayatri Sankul NX
Under construction · possession by Dec 2027
Global Elite
Under construction · possession by Sep 2029
GNP Landmark
Under construction · possession by Jan 2027
Green Valley
Under construction · possession by Dec 2027
Gurudev Orchid
Under construction · possession by Sep 2026
Hamud ONE
Under construction · possession by Dec 2028
Harihar Darshan
Under construction · possession by Dec 2026
Harold CO-OP Housing Society
Under construction · possession by Dec 2026
Heaven Enclave
Under construction · possession by Dec 2026
Heena Ashish
Under construction · possession by Dec 2028
Ishanvi Ashapura Tower
Under construction · possession by Sep 2026
Jadhav Gadh Building 2
Under construction · possession by Jun 2032
JP Anant
Under construction · possession by Mar 2030
Junomoneta - Apollo
Under construction · possession by Dec 2031
Junomoneta - Jupiter
Under construction · possession by Dec 2031
Junomoneta - Lovis Lake View
Under construction · possession by Dec 2031
Junomoneta - Pluto
Under construction · possession by Dec 2031
Junomoneta - Triton
Under construction · possession by Dec 2035
K. E. Zojwalla Commercial Center
Under construction · possession by Dec 2026
K.e.zojwalla Commercial Center
Under construction · possession by Jun 2027
Kailash Gardens
Under construction · possession by Jul 2026
Kalyan Orchid
Under construction · possession by Jun 2031
Kalyan Rajashree Cooperative Housing Society LTD
Under construction · possession by Dec 2028
Kalyan Square
Under construction · possession by Dec 2027
Kanchanjunga CHS
Under construction · possession by Jan 2028
Kashi Darshan B Wing
Under construction · possession by Dec 2026
Kaushalya Heights
Under construction · possession by Mar 2027
Kavita Tower
Under construction · possession by Nov 2029
Keshar Aagan Cooperative Housing Society
Under construction · possession by Sep 2026
Kingsman Residency
Under construction · possession by Jun 2028
Kiran Enclave
Under construction · possession by Mar 2029
Kisan Heights
Under construction · possession by Sep 2027
Kiyan Elevate
Under construction · possession by Apr 2030
Kohinoor Uptown Kalyan
Under construction · possession by Jun 2028
Krishna Empire
Under construction · possession by Dec 2026
Krishna Empire 3
Under construction · possession by Dec 2026
Krishna Empire Phase 4
Under construction · possession by Dec 2028
Krishna Galaxy
Under construction · possession by Dec 2026
Krishna Leela
Under construction · possession by Dec 2026
Krishna Nirman
Under construction · possession by Mar 2028
Kulswamini
Under construction · possession by Dec 2027
Laxmi Pratima Heights
Under construction · possession by Dec 2027
Laxmi Solitaire
Under construction · possession by Jun 2028
Maatr Infinity
Under construction · possession by Mar 2027
Madelyn
Under construction · possession by Mar 2030
Mahadev Enclaves
Under construction · possession by Mar 2028
Mahadev Heights
Under construction · possession by Dec 2026
Mahaveer Horizon Wing A AND Wing B
Under construction · possession by Dec 2028
Mahaveer Signature
Under construction · possession by Dec 2031
Malhar Enclave
Under construction · possession by May 2028
Mangalmurti Heights
Under construction · possession by Mar 2027
Mangeshi Ambar
Under construction · possession by Jul 2026
Mangeshi Arcade II
Under construction · possession by Feb 2027
Mangeshi Crown
Under construction · possession by Mar 2032
Mangeshi Heaven
Under construction · possession by Dec 2027
Mangeshi Neptune
Under construction · possession by Dec 2027
Mangeshi Star
Under construction · possession by Dec 2027
Mangeshi Tulip
Under construction · possession by Jul 2026
Manovi Uptown
Under construction · possession by Apr 2027
Matrix BY Madhav
Under construction · possession by Dec 2027
Mauli Pride
Under construction · possession by Dec 2027
Mehta Altura 1978
Under construction · possession by Dec 2028
Metro Pride
Under construction · possession by Dec 2027
Midtown Adam
Under construction · possession by Jul 2027
Midtown EVE
Under construction · possession by Jun 2027
Midtown Twin Towers
Under construction · possession by Nov 2026
Midtown W90
Under construction · possession by Dec 2026
Mohan Altezza III
Under construction · possession by Dec 2027
Mohan Deep
Under construction · possession by Sep 2026
Mohan Heights Phase-II
Under construction · possession by Dec 2026
Mohan Park
Under construction · possession by Mar 2027
Mohan Prestige
Under construction · possession by Dec 2031
Mohan Tribeca
Under construction · possession by Dec 2026
Moryagolden Imperial
Under construction · possession by Dec 2030
Narmadeshwar
Under construction · possession by Dec 2030
NAV Ashokvan Cooperative Housing Society LTD
Under construction · possession by Apr 2027
Nest Paradise
Under construction · possession by Aug 2028
New Chaitanya Prabha
Under construction · possession by Feb 2029
Niraj Exotica Wing B C D
Under construction · possession by Mar 2030
Nirman Paradise
Under construction · possession by Dec 2028
Nirvana Gardens Phase 1 Wing A Ivana
Under construction · possession by Jul 2028
Nirvana Gardens Phase 2 Wing B Iris
Under construction · possession by Sep 2029
Nirvana Gardens Phase 3 Wing C IVY
Under construction · possession by Mar 2029
Nivasa Prime
Under construction · possession by Dec 2027
OM Avenue
Under construction · possession by Dec 2026
OM Duttakrupa
Under construction · possession by Dec 2028
Om Pushpanjali
Under construction · possession by Dec 2026
OM Vardhasta
Under construction · possession by Dec 2027
Padmavati Avighna
Under construction · possession by Mar 2028
Padmavati Blue Sapphire
Under construction · possession by Dec 2026
Parijas Horizon
Under construction · possession by Jun 2028
Parshuram Tower
Under construction · possession by Sep 2026
Patel Mount
Under construction · possession by Dec 2026
Patels Orion
Under construction · possession by Mar 2030
Pawan Atharva Phase I
Under construction · possession by Aug 2026
Pawan Heights
Under construction · possession by Mar 2027
Phoenix Aura Phase 2
Under construction · possession by Jan 2027
Poddar Riviera Phase - II
Under construction · possession by Dec 2026
Poddar Riviera Phase - III
Under construction · possession by Dec 2026
Pratapgad By Bhagwati Haware – Wing - C
Under construction · possession by Dec 2032
Prathamesh Darshan
Under construction · possession by Mar 2027
Precious Avalon Phase-1
Under construction · possession by Dec 2029
Precious Greenwoods Phase I
Under construction · possession by May 2029
Precious Meadows
Under construction · possession by Nov 2026
Precious Meadows NX
Under construction · possession by Jun 2027
Precious Orchid
Under construction · possession by May 2029
Precious Villas By RM | Parijas
Under construction · possession by Dec 2030
Prestige Gold
Under construction · possession by Jun 2027
Prestige One
Under construction · possession by Dec 2027
Proposed Residential,commercial Bldgs On Plot Bearing OLD 96 C 2-Pt - Mayur Mahal
Under construction · possession by Jun 2027
Raigad By Bhagwati Haware – Wing - A
Under construction · possession by Dec 2034
RAJ Residency
Under construction · possession by Dec 2029
Rajeshwari Residency Phase II
Under construction · possession by Dec 2027
Rajgad By Bhagwati Haware – Wing - D
Under construction · possession by Dec 2032
Rajyog
Under construction · possession by Dec 2028
Rama AND Krishna
Under construction · possession by Mar 2028
Raunak City Sector IV - D6
Under construction · possession by Dec 2027
Raunak City Sector IV - D9
Under construction · possession by Dec 2027
Raunak City Sector VI - F1
Under construction · possession by Dec 2028
Raunak City Sector VI - F2
Under construction · possession by Dec 2028
Raunak City Sector VI - F3
Under construction · possession by Dec 2028
Regency Solitaire
Under construction · possession by Dec 2032
Ritz - Tower H
Under construction · possession by Dec 2029
Ritz Europa Tower A
Under construction · possession by Dec 2030
Ritz Europa Tower B
Under construction · possession by Dec 2030
Ritz Europa Tower C
Under construction · possession by Dec 2030
Ritz Europa Tower D
Under construction · possession by Dec 2030
Ritz Life Tower J
Under construction · possession by Dec 2028
Ritz Phase II Commercial Tower D
Under construction · possession by Sep 2026
Ritz Tower B
Under construction · possession by Sep 2026
Ritz Tower C
Under construction · possession by Sep 2026
Ritz Tower D Residential
Under construction · possession by Dec 2026
Ritz Tower E
Under construction · possession by Dec 2026
Ritz Tower F
Under construction · possession by Dec 2026
Ritz Tower G
Under construction · possession by Dec 2029
Ritz Tower I
Under construction · possession by Dec 2029
Ronak Solitaire /wing A
Under construction · possession by Mar 2029
Royal Plaza
Under construction · possession by Dec 2027
RTG Shiv Srishti
Under construction · possession by Dec 2028
Rutu Apartments
Under construction · possession by Dec 2027
Rutu Heights
Under construction · possession by Jun 2027
Sai Chandra Pride
Under construction · possession by Dec 2027
SAI Dwarka Residency
Under construction · possession by Jun 2028
SAI Galaxy
Under construction · possession by Mar 2027
SAI Galaxy - Phase II
Under construction · possession by Dec 2026
Sai Gokul Vihar
Under construction · possession by Dec 2028
Sai Krishna
Under construction · possession by Dec 2026
SAI Park
Under construction · possession by Dec 2027
SAI Tulip
Under construction · possession by Dec 2026
Samarpan Heights
Under construction · possession by Dec 2026
Sangles Trinity
Under construction · possession by Jul 2028
Santosshi Avenue
Under construction · possession by Dec 2031
Saptshrungi Developers
Under construction · possession by Mar 2028
Sara Tower
Under construction · possession by Dec 2026
Sarvoday 1
Under construction · possession by Dec 2028
Sarvoday Datt
Under construction · possession by Dec 2027
Sarvoday Marvel
Under construction · possession by Jul 2027
Sarvodaya Classic
Under construction · possession by Dec 2027
Sasvat Enclave
Under construction · possession by Mar 2027
Satyam Chopra Enclave
Under construction · possession by Mar 2027
SD Galaxy
Under construction · possession by Dec 2027
Seasons Aura
Under construction · possession by Dec 2030
Seasons Green
Under construction · possession by Dec 2027
Seasons Mayfair
Under construction · possession by Dec 2026
Seasons ONE
Under construction · possession by Dec 2028
Seasons Pearl
Under construction · possession by Dec 2029
Seasons Saffron
Under construction · possession by Dec 2026
SEN Imperial
Under construction · possession by Nov 2030
Shankheshwar Pristine
Under construction · possession by Dec 2028
Shankheshwar Privia
Under construction · possession by Dec 2028
Sharda Serene
Under construction · possession by Dec 2028
Shelar Supremus
Under construction · possession by Dec 2029
Shirish Residency
Under construction · possession by Dec 2026
Shishodia Arcade C Wing
Under construction · possession by Dec 2026
Shivalay
Under construction · possession by Sep 2027
Shivalay
Under construction · possession by Jun 2027
Shivdooti Residency
Under construction · possession by Dec 2027
Shivneri Park CO OP HSG SOC LTD
Under construction · possession by Mar 2027
Shivshakti Manokamana
Under construction · possession by Dec 2029
Shree Gajanan Fortune City
Under construction · possession by Dec 2026
Shree Yogiraj Construction
Under construction · possession by Dec 2031
Shreeji Dattakrupa
Under construction · possession by Mar 2028
Shreeji Landmark
Under construction · possession by Dec 2029
Shreeji Tandle Arcade
Under construction · possession by Aug 2029
Shreesha Heights
Under construction · possession by Aug 2028
Shri Shivsiddhi
Under construction · possession by Dec 2028
Siddhivinayak Homes
Under construction · possession by Dec 2026
Silver Plaza
Under construction · possession by Mar 2029
Silver Residence
Under construction · possession by Dec 2027
Sinhagad By Bhagwati Haware – Wing - B
Under construction · possession by Dec 2034
Siyara Business Park Kalyan
Under construction · possession by Feb 2030
Siyara Heights
Under construction · possession by Mar 2029
Siyara Vista
Under construction · possession by Feb 2030
SKF Harmonie
Under construction · possession by Jan 2028
SKY Heights
Under construction · possession by Mar 2028
SKY Villas Wing B1
Under construction · possession by May 2029
SRI Parkview
Under construction · possession by Dec 2027
Stella CO-Operative Housing Society LTD
Under construction · possession by Dec 2027
Sunshine Prasad Chsl
Under construction · possession by Mar 2030
Sunteck Crescent Park -1
Under construction · possession by Dec 2029
Sunteck Crescent Park -2
Under construction · possession by Dec 2031
Survey NO 162 Village Khoni TAL Kalyan
Under construction · possession by Jan 2028
Suviam Pearl Phase I
Under construction · possession by Dec 2026
Swami Datta Krupa
Under construction · possession by Sep 2026
Sweet Home Luxuria
Under construction · possession by Jun 2028
Tanishq
Under construction · possession by Dec 2026
Tharwani Majestic Towers Phase II
Under construction · possession by Dec 2026
Tharwani Solitaire Phase IV
Under construction · possession by Jul 2026
THE Millenia
Under construction · possession by Aug 2028
THE Pyramid ONE
Under construction · possession by Sep 2026
THE Pyramid Pride
Under construction · possession by Apr 2029
Time Square
Under construction · possession by Dec 2028
Trishan Enclave
Under construction · possession by Dec 2028
Triveni Galleria
Under construction · possession by Dec 2029
Triveni Pearl
Under construction · possession by Jan 2029
Tulsi Ariana
Under construction · possession by Dec 2027
Tulsi Palace
Under construction · possession by Dec 2027
Tulsi Vatika
Under construction · possession by Mar 2030
Tycoons Orbis
Under construction · possession by Dec 2026
Tycoons Square Avenue I Tower B
Under construction · possession by Jun 2027
Tycoons Square Avenue I Tower C
Under construction · possession by Jun 2027
Tycoons Square Avenue III Tower D
Under construction · possession by Dec 2026
V-10 Lake View
Under construction · possession by Dec 2027
Vaishnavi Heights
Under construction · possession by Dec 2026
Vardhaman Park
Under construction · possession by Mar 2027
Vasudev Laxmi Park
Under construction · possession by Jan 2027
Vedaant Ashiyana Building 3 Wing E
Under construction · possession by Dec 2027
Vedaant Meadows
Under construction · possession by Dec 2027
Vedant Connect
Under construction · possession by Dec 2026
Vedant Empire Phase I Wing A-Eagleton
Under construction · possession by Dec 2027
Vedant Empire Phase II Wing B-Hampton
Under construction · possession by Dec 2027
Vedant Mayfair
Under construction · possession by Jun 2030
Vedant Palacia Phase IV Wing B-Brutus
Under construction · possession by Dec 2026
Vedant Palacia Phase V Wing C-Cassius
Under construction · possession by Dec 2027
Vishwajeet Precious Phase IV
Under construction · possession by Mar 2028
Vishwajeet Precious Phase V
Under construction · possession by Apr 2030
Vishwajeet Town
Under construction · possession by Jan 2029
Vishwajeet Town Phase II
Under construction · possession by Apr 2030
Vishwanath Darshan
Under construction · possession by Dec 2029
Wayle Arcade
Under construction · possession by Dec 2027
White Square
Under construction · possession by Dec 2027
White Square NX Wing A,c,d
Under construction · possession by Dec 2028
White Square NX Wing B
Under construction · possession by Dec 2028
Yashwant Heights
Under construction · possession by Dec 2028

Also registered in Kalyan (344)

Aditya Apartments
Declared completion Dec 2018
Aditya Apartments Building C
Declared completion Sep 2020
AL-Nashra Heights
Declared completion Jun 2023
Alishan Park 3
Declared completion Dec 2025
Ambika Prassana CHS
Declared completion Dec 2024
Ambre Heights
Declared completion Dec 2018
AMI Darshan E Wing
Declared completion Dec 2017
Amikrupa
Declared completion Sep 2020
Amina BI Inamdar Tower
Declared completion Mar 2024
Amrut Pearl Building NO 1
Declared completion Dec 2022
Amrut Pearl Building NO 2
Declared completion Dec 2022
Amrut Pearl Building NO. 5 AND 6
Declared completion Dec 2018
Amrutwani Complex D Type
Declared completion Dec 2017
Anand Eleganza
Declared completion Mar 2026
Anand Homes
Declared completion Dec 2020
Anand Homes Wing C
Declared completion May 2022
Anand Sagar Duos
Declared completion Feb 2023
Anand Sagar Enclave
Declared completion May 2018
Apurva Ratn
Declared completion Jun 2025
ART Shree
Declared completion Mar 2026
Arya And Ira
Declared completion Dec 2022
Ashapura Prasad
Declared completion Jun 2022
Ashtavinayak
Declared completion Jun 2021
Athena Enclave
Declared completion Dec 2023
Atlantic Orra
Declared completion Feb 2019
Atmaram Kene Residency
Declared completion Dec 2018
Atrinandan Heights
Declared completion Dec 2022
Audumber Shrushti
Declared completion Dec 2023
Ayesha Garden A Wing
Declared completion Dec 2024
Ayesha Garden B Wing
Declared completion Sep 2025
Ayesha Height
Declared completion Mar 2026
Ayush Palace Phase II
Declared completion Jun 2025
Balaji Construction
Declared completion Apr 2023
Balaji Exotica Building Type D Phase III
Declared completion Dec 2025
Balaji Exotica Phase-II
Declared completion Mar 2023
Balaji Exotica-Phase 1
Declared completion Dec 2022
Balaji Vivanta
Declared completion Dec 2023
Balram Complex
Declared completion Jun 2026
Bella Vista Phase 8B
Declared completion Dec 2020
Belpatra Apartment
Declared completion Jul 2022
Bharat Residency
Declared completion May 2018
Bharat Residency A Wing
Declared completion Jun 2022
Bharat Residency C Wing
Declared completion Mar 2026
Birla Vanya - Phase 1
Declared completion Jun 2025
Birla Vanya Phase 2
Declared completion Jun 2025
Borgaonkar Avenue
Declared completion Dec 2024
Borgaonkar Elegance
Declared completion May 2026
Chand Galaxy
Declared completion Dec 2020
Chavan Elegance
Declared completion Mar 2024
Commercial-1
Declared completion Jun 2024
Commercial-2
Declared completion Jun 2024
Crown Park
Declared completion Jan 2025
Crystal Builders And Developers
Declared completion May 2025
Dhundiraj
Declared completion Dec 2018
Disha CO Operative Housing Society LTD
Declared completion Jan 2020
Diwadkar Lotus
Declared completion Dec 2021
Dream Avenue
Declared completion Dec 2025
Dynamic Ultima - Bliss
Declared completion Dec 2020
Ekdanta
Declared completion Dec 2022
Ganesh Darshan
Declared completion Apr 2026
Gautam
Declared completion Sep 2020
Gawade Gazelle
Declared completion Mar 2025
Gayatri Niwas
Declared completion Dec 2025
Gayatri Sankul
Declared completion Dec 2023
Geeta Heights
Declared completion Dec 2024
Geetanjali
Declared completion Dec 2019
Geetant Ashray
Declared completion Dec 2025
Godown-A
Declared completion Jun 2024
Greenworld Developers Pvt. LTD
Declared completion Dec 2022
Hubs Infrastructure
Declared completion Jun 2024
Indralok Phase I
Declared completion Dec 2021
Ishna Height
Declared completion Jun 2023
Jadhav Gadh
Declared completion Dec 2022
JAI Guruji Tower
Declared completion Jun 2023
Jalal Mansion
Declared completion Dec 2018
Jalaram Darshan Co-Operativehousing Society Limited
Declared completion Mar 2025
Janaki Parashram Apartment
Declared completion Jun 2026
Jigar Construction Venus
Declared completion Jun 2024
Kailash Homes
Declared completion May 2025
Kashi Darshan
Declared completion Oct 2023
Kashinath Patkar Nagar
Declared completion Dec 2022
Kavita Pearl
Declared completion Oct 2019
Kohinoor Lifestyle
Declared completion Dec 2020
Kohinoor Luxuria
Declared completion Sep 2022
Kohinoor Majestic
Declared completion Dec 2023
Konark Meadows Phase-1
Declared completion Dec 2022
Konark Solitaire - Phase 1
Declared completion Jun 2019
Krishna Empire
Declared completion Dec 2021
Krishna Heritage
Declared completion Dec 2020
Krishna Heritage
Declared completion Dec 2024
Krishna Nisarga
Declared completion Dec 2021
Krishna Paradise
Declared completion Jun 2019
Krishna Pride
Declared completion Jun 2022
Krishna Residency
Declared completion Dec 2021
Krishnalaya
Declared completion Dec 2019
Lifestyle City Kalyan - Advantage A
Declared completion Oct 2022
Lifestyle City Kalyan - Applause A
Declared completion Oct 2022
Lifestyle City Kalyan - Applause B
Declared completion Sep 2023
Lifestyle City Kalyan - Excel A
Declared completion Sep 2024
Lifestyle City Kalyan - Excel B
Declared completion Sep 2024
Lifestyle City Kalyan - Glory A
Declared completion Sep 2023
Lifestyle City Kalyan - Glory B
Declared completion Sep 2023
Lifestyle City Kalyan - Platano F
Declared completion Dec 2022
Lifestyle City Kalyan - Spirit A
Declared completion Jul 2019
Lifestyle City Kalyan - Thames
Declared completion Aug 2024
Lifestyle City Kalyan - Victory A
Declared completion Jul 2019
Lifestyle City Kalyan - Victory B
Declared completion Jul 2019
Lifestyle City Kalyan Amazon B
Declared completion Sep 2023
Lifestyle City Kalyan Amazon C
Declared completion Dec 2023
Lifestyle City Kalyan Amazon D
Declared completion Dec 2023
Lifestyle City Kalyan Riviera A
Declared completion Jun 2024
Lifestyle City Kalyan Riviera B
Declared completion Jun 2024
Lifestyle City Kalyan Riviera C
Declared completion Oct 2024
Lifestyle City Kalyan Riviera D
Declared completion Oct 2024
Lifestyle City Kalyan- Platano A
Declared completion Jan 2023
Lifestyle City Kalyan- Platano B
Declared completion Jan 2023
Lifestyle City Kalyan- Platano C
Declared completion Jan 2023
Lifestyle City Kalyan-Amazon A
Declared completion Sep 2023
Lifestyle City Kalyan-Cypress A
Declared completion Sep 2023
Lifestyle City Kalyan-Cypress B
Declared completion Sep 2023

+224 more registered in Kalyan.

Aggregated from the state RERA registers. 'Under construction' is inferred from a declared completion date still in the future; registration is not completion — confirm the occupancy certificate and current status before you commit.